Download Broan 433018 Instructions / Assembly
Transcript
PREPARING THE HOOD 1. ROOFCAP ROOFCAP Unpackhoodandcheckcontents.Youshouldreceive: 1–Filterwithbuilt-inlightlens 1–3-1/4"x10"damper/ductconnector 1–Installationpartsbag BP87DAMPER(NOTINCLUDED) LOCATED AT LEAST 6" FROM HOOD INVERTICAL SECTION OFDUCT DAMPER (INCLUDED) LIGHT LENS ALUMINUM OR COMBINATION FILTER REMOVETHE HOODDAMPER FLAPIFITINTERFERESWITH THEWALLCAP DAMPER JUNCTION BOX 2. Removejunctionboxcover. 3. Removetoporrearelectricalknockout. 4. Selectoneofthethreetypesofventingavailable: Non-Vented—Removeventcoverfromhoodfront.Replace thealuminumfilterwithanon-ductedfilter(BP57orR610050 -purchaseseparately).Goto"PreparingtheInstallationLocation". Ducting directly through the wall (for range hoods mounted onanexteriorwall).Shownaretwowaystoductthroughan outsidewall.Ifawallcapisuseddirectlyoffthebackofthe hood,specialcaremustbetakentomakesurethatthedamper inthedamper/ductconnectoronthehoodanddamperinthe wall cap do not interfere with each other when the hood is operating.Thiscouldresultineitherinadequateairdelivery orbackdrafts.Ifthisconditiondoesexist,removethehood damperflap.Sometimeswhenusingawallcap,itiseasierto ductverticallyandthenuseanelbow. Ductingstraightupthroughroofusing3-1/4"x10"or7"round duct.Forsinglestoryinstallations. Ductingbetweenceilingjoistsformulti-storyinstallationsor throughsoffitsabovecabinetswheresoffitconnectstooutside walls. VENT COVER ② ① ③ PREPARING THE INSTALLATION LOCATION Rectangular Vented—3-1/4"x10"verticalorhorizontal.Removeknockout#②forverticalorknockout#③forhorizontal venting. Install damper/duct connector over opening. Go to "PlanningDuctworkInstallation". NOTE: MOUNT HOOD SO THAT BOTTOM OF HOOD IS 18" TO 25" ABOVE COOKING SURFACE. TOP FRONT OF HOOD SHOULD BE FLUSH WITH FRONT OF CABINET FRAME. IF DISTANCE BETWEEN WALL AND FRONT OF CABINET FRAME IS MORE THAN 12", THERE WILL BE A SPACE BETWEEN BACK OF HOOD AND WALL. THIS IS NORMAL. OMIT STEP 1 IF HOOD WILL BE INSTALLED UNDER CABINETS WITH FLUSH BOTTOM. FILLERSTRIP Round Vented—7"vertical.Removeknockouts#①and#② exposingductcollar.Goto"PlanningDuctworkInstallation". PLANNING DUCTWORK INSTALLATION This section for vented hoods only. Non-vented hoods skip this section and go on to "Preparing the Installation Location". Beginplanningductworkbydecidingwhereductwillrunbetween hoodandoutside.Forbestperformance,useshortestpossible ductrunandaminimumnumberofelbows.Thereareseveral choices. 1. Forcabinetswithrecessedbottomsonly:Installwoodfiller stripsoneachsideofrecessedareaundercabinet.Usetwo 1" x 2" strips cut to length (use thicker strips if necessary). Fastenstripswithwoodscrewsabout3"infromeachend. 2. Measureandmarkthefollowing: a.) Electricalwiringopeninginwallorcabinet. b.) Ductopeninginwallorcabinet(ventedhoodsonly). 2
This document in other languages
- español: Broan 433018