Transcript
Submittal Sheet Perma-Patch Large Drywall Patch DESCRIPTION Measures 8” x 8”, .024” thick Manufactured from a patented PVC fiber composite material Will not fuzz-up during sanding Imprinted with standard design patterns for easy use Designed for door knob damage, electrical receptacles, ceiling can lights and drywall mis-cuts ADVANTAGES Makes receptacle, ceiling and can light relocation easy Second coat of compound can be applied immediately – very light skim coat to finish Easily installs using standard drywall compounds Very fast, extremely strong Waterproof, rustproof LIMITATIONS Not for use with solvents or solvent-based paints that could degrade the adhesive. Maintain 55°F (13°C) minimum temperature within the building during and after installation. PACKAGING Available in 50 cards of 2 (PP-2PK), 10 bags of 10 (PP-100) and 50 bags of 10 (PP-500) DIRECTIONS To apply, lightly sand area to be repaired. Apply drywall compound 1/8” to 1/4" thick directly to back of patch. Place patch over center of repair and wipe down flat to wall using joint knife. Immediately skim-coat patch and let dry. Compound that remains on backside of Outlet-Patch makes patch very rigid in the damaged area. Apply second coat, let dry, and sand. REPAIRS OVER PAINTED SURFACES. Strait-Flex recommends the use of Strait-Flex Super-Bond or latex paint, mixed with all purpose joint compound, for enhanced bonding strength. WARRANTY Strait-Flex tapes are backed by a three year warranty. When applied to a sound structure, built on a permanent foundation using recommended application techniques, we warrant that these products will not edge-crack for a period of three years from the date of purchase. Strait-Flex International, Inc will match any manufacturer’s warranty on a similar product. Contact Strait-Flex International, Inc for complete details. STORAGE Store in a dry place protected from moisture STRAIT-FLEX INTERNATIONAL, INC O’FALLON, MO PHONE: 888.747.0220 FAX: 636.300.0414 STRAITFLEX.COM SUBMITTAL APPROVALS Job Name: _____________________________________________________________________ Contractor: _________________________________________________ Date: ______________