Download Dell PowerEdge 2800 Conversion Guide

Transcript
Y1001bk0.book Page 19 Thursday, July 8, 2004 4:32 PM
•
One painted top cover
•
One tower trim panel
•
Tower control panel carrier assembly kit
•
Twenty-two 6-32 x 0.312-inch black flat-head Torx screws
Figure 1-10.
Rack-to-Tower Kit Contents
tower cover
tower trim panel
tower front panel
metal feet (4)
tower control
panel carrier
tower bezel
8-32 x 0.312
hex-head
screws (4)
6-32 x 0.312
Torx screws
(22)
Tower-to-Rack and Rack-to-Tower Conversion Guide
19