Download Dell UPS 10000R Getting Started Guide
Transcript
Dellt Online Rack UPS 10 kW Getting Started With Your System Démarrer Avec Votre Système Erste Schritte mit Ihrem System ÐаÑалП ÑабПÑÑ c ÑОÑÑеЌПй Cómo empezar con su sistema ç³»ç»äœ¿çš å ¥éšæå ç³»çµ±äœ¿çš å ¥éæå ì¬ì©ìì ìì€í ììíêž° ã¯ããã« ã·ã¹ãã ã«ã€ã㊠DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com Dellt Online Rack UPS 10 kW Getting Started With Your System DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com Notes and Warnings NOTE: A NOTE indicates important information that helps you make better use of your software. DANGER: A DANGER indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. WARNING: A WARNING indicates a potentially hazardous situation which, if not avoided, could result in death or injury. CAUTION: A CAUTION indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury or in property damage incidents. DANGER: Observe the following instruction to help prevent an imminently hazardous situation which, if not avoided, will result in death or serious injury: S The UPS contains LETHAL VOLTAGES. All repairs and service should be performed by AUTHORIZED SERVICE PERSONNEL ONLY. There are NO USER SERVICEABLE PARTS inside the UPS or EBM. Information in this document is subject to change without notice. E 2012 Dell Inc. All rights reserved. Reproduction in any manner whatsoever without the written permission of Dell Inc. is strictly forbidden. Trademarks used in this text: Dell and the DELL logo are trademarks of Dell Inc.; ENERGY STAR name is a registered trademark owned by the U.S. Environmental Protection Agency. Other trademarks and trade names may be used in this document to refer to either the entities claiming the marks and names or their products. Dell Inc. disclaims any proprietary interest in trademarks and trade names other than its own. December 2012 System Features Providing outstanding performance and reliability, the UPS's unique benefits include: S Online UPS design with pure sine wave output. S True online double-conversion technology with high power density, utility frequency independence, and generator compatibility. S Buck and Boost voltage regulation that ensures regulated voltage to your load by correcting voltage fluctuations. S The UPS filters and regulates incoming AC power and provides consistent power to your equipment without draining the battery. S Selectable High Efficiency mode of operation. S 5U UPS height. S Start-on-battery capability for powering up the UPS even if utility power is not available. S Maintenance is simplified by allowing the safe replacement of batteries without powering down the UPS. S Dell service tag information can be read from the front panel LCD display. S Extended runtime with an optional Extended Battery Module (EBM). S Emergency shutdown control through the Remote Emergency Power-off (REPO) ports. S Two standard communication ports (USB and RS-232 serial port). S Optional Dell Network Management Card (also known as the NMC) with enhanced communication capabilities for increased power protection and control. S Optional Environmental Monitoring Probe (EMP) for collecting temperature and humidity readings in the frame environment and monitoring the environmental data remotely. You can also collect and retrieve the status of two user-provided contact devices. S Advanced power management with the Dellt Multi-UPS Management Console (MUMC) and Dellt UPS Local Node Manager (ULNM) Web-based software applications for graceful shutdowns and power monitoring. S Sequential shutdown and load management through separate receptacle groups called load segments. S Firmware that is easily upgradable without a service call. S Backed by worldwide agency approvals. S ENERGY STAR® certified UPSs. System Features | 3 Finding Information CAUTION: The Safety, Environmental, and Regulatory Information document provides important safety and regulatory information. What are You Looking For? S The user's guide for my UPS Find It Here Dell UPS Disc S The user's guide for the Dell Network Management Card S Dell MUMC and Dell ULNM User's Guides NOTE: Documentation and software updates can be found at www.support.dell.com and at www.dellups.com. S Specifications Dell UPS User's Guide S How to configure UPS settings The user's guide is available on the Dell UPS disc and on www.support.dell.com. S How to troubleshoot and solve problems S How to install REPO control S Safety instructions Safety, Environmental, and Regulatory Information S Regulatory information S Recycling information S Warranty information Dell Warranty and Support Information S Terms and Conditions (U.S. only) S End User License Agreement S Support information Dell Support Website â www.support.dell.com NOTE: Select your region or business segment to view the appropriate support site. 4 | Finding Information Installation and Startup CAUTION: Before performing the procedures in this document, read and follow the safety instructions and important regulatory information in your Safety, Environmental, and Regulatory Information document. CAUTION: Unpacking the cabinet in a low-temperature environment may cause condensation to occur in and on the cabinet. Do not install the cabinet until the inside and outside of the cabinet are absolutely dry (hazard of electric shock). CAUTION: Installing or removing the battery trays should be performed or supervised by personnel knowledgeable about batteries and the required precautions. Keep unauthorized personnel away from batteries. Installation and Startup | 5 CAUTION: The cabinet is heavy (99 kg/218 lb): Always remove both battery trays from the UPS before lifting the cabinet. Lifting the cabinet into the rack requires a minimum of two people. CAUTION: The batteries are heavy (32 kg/71 lb). Use proper lifting techniques when removing the batteries. NOTE: Use care when moving and opening the carton. Leave the components packaged until ready to install. This section describes the steps to set up your system for the first time. Unpacking the Cabinet To unpack the system: 1 Using a forklift or pallet jack, move the shipping carton and pallet near the rack where you will install the UPS. 2 Detach and remove the outer carton. 6 | Installation and Startup 3 Remove the two accessory boxes tucked into the channels in the top Styrofoam section. 4 Open the accessory boxes and set them on a flat, stable surface nearby. NOTE: The Dell Online Rack UPS 10 kW User's Guide provides unpacking and installation procedures. To refer to it, remove it from the accessory box before you set the accessory boxes aside. 5 Remove the top Styrofoam section and set it on a flat, stable surface nearby. Installation and Startup | 7 NOTE: The battery retaining brackets are labeled L (Left) and R (Right) to indicate where they must be installed. 6 Remove both retaining brackets from the UPS: Locate the left (labeled L) retaining bracket. On the left side of the chassis, turn the thumbscrew counter-clockwise to release the left retaining bracket. Push the bracket toward the center post to disengage it from the chassis. Swing the bracket toward you and pull the bracket to the left to remove it. Set the bracket aside. Locate the right (labeled R) retaining bracket. On the right side of the chassis, turn the thumbscrew counter-clockwise to release the right retaining bracket. Push the bracket toward the center post to disengage it from the chassis. Swing the bracket toward you and pull the bracket to the right to remove it. Set the bracket aside. 7 Ensure all battery connectors are disconnected. 8 | Installation and Startup CAUTION: The batteries are heavy (32 kg/71 lb). Use proper lifting techniques when removing the batteries. 8 Remove the battery trays from the UPS: Move the disconnected UPS battery connectors at the top of the battery compartment out of the way. Grip the two plastic loop tabs on the front of the battery tray. Pull the tray toward you to remove. NOTE: The orange PULL HERE labels indicate where to grasp the loop tabs. Set the battery tray on the Styrofoam section you removed from the top of the UPS. Repeat with the second battery tray. Installation and Startup | 9 CAUTION: The cabinet is heavy (46 kg/101 lb) with the batteries removed. Lifting the cabinet from the shipping carton requires a minimum of two people. 9 With one person on each side, carefully lift the cabinet out of the styrofoam using the handles on the cardboard. 10 Place the cabinet on a flat, stable surface in a protected area near the rack where you will install it. NOTE: Ensure that the area has adequate airflow and is free of humidity, flammable gas, and corrosion. 10 | Installation and Startup Rackmount Setup CAUTION: The cabinet is heavy (99 kg/218 lb). Always remove both battery trays from the UPS before lifting the cabinet and installing the UPS on the rails in the rack. Lifting the cabinets into the rack requires a minimum of two people. CAUTION: Installing or removing the batteries should be performed or supervised by personnel knowledgeable about batteries and the required precautions. Keep unauthorized personnel away from batteries. CAUTION: The batteries are heavy (32 kg/71 lb). Use proper lifting techniques when removing the batteries. CAUTION: If installing an optional EBM, the EBM must be located below the UPS with no U space between the UPS and EBM. This provides better weight distribution in the rack, easier access to the UPS control panel, and easier routing for the battery cable connections. This also prevents strain between the EBM cord and the UPS connection and possible connection failure. WARNING: For Rack-Mounted Systems: When installing multiple systems in a rack, complete all of the procedures for the current system before attempting to install the next system. NOTE: Mounting rails are required for each individual cabinet. NOTE: The cabinet is shipped without the front cover bezel attached. NOTE: The following instructions are the same for square-hole racks and unthreaded, round-hole racks. The rails fit both rack styles. To install the UPS in a rack: 1 Ensure that the following are placed on a flat, stable surface near the rack where you will install the UPS: S cabinet S two UPS accessory boxes S two battery trays (UPS only) S two battery retaining brackets (UPS only) Installation and Startup | 11 Installing the Rails 2 Remove the rails from the rail kit accessory box. 3 Select the proper holes in the rail for positioning the cabinet in the desired location in the rack. Locate the rails at the bottom of the 5U space allocated for the UPS. CAUTION: If installing an optional EBM, make provision for installing the EBM directly below the UPS with no U space between the UPS and EBM. NOTE: Observe the labels on the rails for right front (labeled RIGHT FRONT) and left front (labeled LEFT FRONT). This is the way the rails should be positioned for installation. 4 Position the left and right rails as illustrated. Attach the the left and right rails to the rack: Engage the back end of the rail until it fully seats on the vertical rack flange and the hook latch locks in place. Pull the rail just past the front of the rack. Push the front end of the rail until it fully seats on the vertical rack flange and the hook latch locks in place. 12 | Installation and Startup Installing and Securing the Cabinet CAUTION: The cabinet is heavy (46 kg/101 lb) with the batteries removed. Lifting the cabinet into the rack requires a minimum of two people. 5 Slide the cabinet onto the rails and into the rack. 6 Secure the front of the cabinet to the rack using the four thumbscrews on the mounting brackets. Tighten the thumbscrews clockwise by hand; do not use power tools. Installing the Battery Trays 7 Locate the battery trays you placed near the rack. Installation and Startup | 13 CAUTION: The batteries are heavy (32 kg/71 lb). Use proper lifting techniques when installing the batteries. NOTE: The battery trays can be installed in either battery compartment. NOTE: Insert the tray with the caution label arrow pointing upward. 8 Install the battery trays: Move the UPS battery connectors at the top of the battery compartment out of the way. Slide the battery tray into the battery compartment completely. Repeat to install the second battery tray. 9 Tuck the loop tabs into the plastic sleeve on the front of each battery tray to move them out of the way. Connecting Internal Battery Connectors 10 Connect the internal battery connectors: Connect the far-left battery tray connector to the fixed UPS connector. Connect the far-right battery tray connector to the fixed UPS connector. NOTE: A small amount of arcing may occur when connecting the batteries. This is normal and does not damage the unit or present any safety concern. Locate and connect the battery jumpers located on either side of the center post. Place the connectors on the small shelf at the top of the center post. NOTE: Connecting the center battery jumpers connects the two battery trays serially. 14 | Installation and Startup Replacing the Battery Retaining Brackets Chassis Side Channel Center Post Side Channel NOTE: The battery retaining brackets are labeled L (Left) and R (Right) to indicate where they must be installed. 11 Replace the left (L)and right (R) battery retaining brackets: For the first battery retaining bracket, insert the bracket tab into the channel on the side of the center post. Fit the connected battery cables snugly behind the retaining bracket. Align the end of the battery retaining bracket with the channel on the side of the chassis. Push the bracket until it is firmly seated into the side channel. Turn the thumbscrew clockwise to secure the bracket. Repeat to replace the second battery retaining bracket. Installing the UPS Front Cover 12 Remove the front cover from the accessory box. Installation and Startup | 15 NOTE: Keep the software CD, communication cable, and (if needed) REPO connectors in the accessory box until you install the UPS. 1 2 13 Install the UPS front cover: Align the front cover with the front of the chassis. Insert the right-side tabs on the front cover into tab openings on the right-side chassis. Push the left side of the cover forward and snap it to the chassis. NOTE: Ensure that the LCD panel on the UPS chassis aligns with the LCD window on the front cover before securing the cover to the chassis. 14 Discard or recycle the packaging in a responsible manner, or store it for future use. 16 | Installation and Startup Connecting the Equipment To install the UPS: 1 If you plan to use Dell MUMC and Dell ULNM software, establish communication in one of the following ways: S using the Dell Network Management Card (if installed) S using the supplied cable to connect your computer to the USB port NOTE: For more information about communication options, refer to the Dell Online Rack UPS 10 kW User's Guide. 2 If your rack has conductors for grounding or bonding of ungrounded metal parts, connect the ground cable (not supplied) to the ground bonding screw. See âUPS Rear Panelsâ on page 24 for the location of the ground bonding screw for each of the three models. 3 If an emergency power-off (disconnect) switch is required by local codes, refer to âInstalling Remote Emergency Power-offâ in the Dell Online Rack UPS 10 kW User's Guide. 4 If you are installing an optional EBM, refer to the Dell Online Rack EBM 10 kW Getting Started Guide for installation instructions. CAUTION: If the UPS is stored or used without an EBM, the battery connector cover on the rear panel of the UPS must be installed as a safety precaution. 5 Plug the equipment to be protected into the UPS output receptacles, but do not turn on the protected equipment. 6 Make any necessary provisions for cord retention and strain relief. NOTE: Verify that the total equipment ratings do not exceed the UPS capacity to prevent an overload alarm. Installation and Startup | 17 Hardwiring the UPS Input WARNING: Risk of electrical shock. Only qualified service personnel (such as a licensed electrician) shall perform the electrical installation. The Dell Online Rack hardwired models require a dedicated branch circuit that meets the following requirements: S Protection device requires a two-pole disconnection device between the UPS input and the mains S Breaker must be wall-mounted and be readily accessible to the operator S For Europe. Breaker must meet the IEC/EN 60934 standard and at least 3 mm contact air gap S 200â240 Vac S Single-phase S 50/60 Hz S Flexible metal conduit (recommended for ease of service and maintenance) Wall 2-pole Breaker Line AC Mains UPS Neutral/L2 18 | Installation and Startup Removing the Terminal Block Cover Knock-out Hole Terminal Block Cover 1 Switch off utility power at the distribution point where the UPS will be connected. Be absolutely sure there is no power. 2 Remove the terminal block cover (two screws) and retain. 3 Remove the knock-out hole in the terminal block cover for the input conduit. The hole must accommodate 1â or 1.5â (25.4 mm or 38.1 mm) Intermediate Metal Conduit (IMC). Installation and Startup | 19 CAUTION: If the UPS does not have an automatic protection device against current backfeed, install an external isolating device. After the device is installed, you must add a warning label with the following wording or the equivalent on the external AC contactor: RISK OF VOLTAGE BACKFEED. Isolate the UPS before operating on this circuit, then check for hazardous voltage between all terminals. External Distribution Panel UPS Legend Q T L/L1 L/L1 N/L2 N/L2 B Q T N/L2 L/L1 Coil Remote Switch Magneto-Thermal Input Main Switch AC Contactor Neutral/L2 L1 Line Input B The following table lists backfeed protection devices (AC contactors) that can be used as an external isolating device for backfeed protection. Only use AC contactors listed in the table. Manufacturer Type Rating A75-30 220â240 Vac, 105A 25 HP at 208V, 30HP at 240V Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (alternative) GSC1(CJX4-d)-6511 220â240 Vac, 68A 25 HP Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (alternative) GSC1(CJX4-d)-8011 220â240 Vac, 80A 30 HP ABB France (E12527) NOTE: Although the UPS does not contain anti-backfeed (ABF) relays, some backfeed protection is provided. For example, if some components are damaged in battery mode, the output voltage may feed back to the input. In this case, a current transformer (CT) is used to detect the bypass current feedback voltage. If a current backfeed fault condition is detected, the UPS will terminate the inverter output to avoid the personal injury. 20 | Installation and Startup Installing the Input and Ground Wires 2 1 3 4 Pull the input wire through the conduit, leaving approximately 2 ft (0.5m) of exposed wire. Attach a flexible metal fitting to the end of the conduit. 5 Insert the conduit through the wiring access entry and attach the conduit fitting to the panel. Strip 0.5â (1.5 cm) of insulation from the end of each incoming wire. 6 Connect the input and ground wires to the terminal block according to the UPS Wiring Specifications in the following table. Wire Function Input Terminal Position UPS Wire Function 1 Input Ground 2 L2/Neutral In 3 L1 In Terminal Wire Size Rating* Tightening Torque 16â35 mm2 (8â2 AWG) 1.7 Nm (15 lb-in) * Use a minimum: S 8 AWG for equipment grounding wire, 75_C copper wire minimum S 4 AWG for input line and neutral wires, 75_C copper wire minimum 7 Replace the terminal block cover. Installation and Startup | 21 Starting the UPS On/Off Button To start up the UPS: 1 Verify that the internal batteries are connected. 2 If an optional EBM is installed, verify that the EBM is connected to the UPS. Refer to the Dell Online Rack EBM 10 kW Getting Started Guide for more information. 3 Verify that all load segment circuit breakers are in the ON position. 4 Switch the main utility breaker on. The UPS LCD panel display illuminates. The Dell startup screen changes to the UPS status summary screen. The UPS front panel display shows the flashing Standby icon . 5 Press the On/Off button on the UPS front panel. After the startup is complete, the status changes according to the UPS operating mode. 22 | Installation and Startup 6 On the UPS status summary screen, press the button to check for active alarms or notices. Resolve any active alarms before continuing. See âTroubleshootingâ in the Dell Online Rack UPS 10 kW User's Guide. If there are no active alarms, a âNo Active Alarmsâ message appears. 7 Verify that the Normal icon appears on the UPS status summary screen, indicating that the UPS is operating normally and any loads are powered. 8 Refer to the Dell Online Rack UPS 10 kW User's Guide for the following: S For configuration procedures if an optional extended battery module (EBM) is installed S To set the date and time and to change other factory-set defaults 9 If you installed an optional REPO, test the REPO function: Activate the external REPO switch. Verify the status change on the UPS display. Deactivate the external REPO switch and restart the UPS. 10 Charge the batteries. NOTE: The internal batteries charge to 90% capacity in less than three hours. However, you must charge the batteries for 48 hours after installation or long-term storage. CAUTION: To prevent an UPS overload condition, connect one load at a time and make sure that each protected device starts up completely before you connect the next load. NOTE: Dell recommends setting the date and time for troubleshooting or warranty purposes. NOTE: At initial startup, the UPS sets system frequency according to input line frequency (input frequency auto sensing is enabled by default). After initial startup, auto sensing is disabled until you manually enable it by using the output frequency setting. Installation and Startup | 23 NOTE: At initial startup, input voltage auto sensing is enabled by default. After the subsequent startup, auto sensing is disabled until you manually enable it by using the output voltage setting. Identifying the UPS Rear Panels This section illustrates the rear panels of the three Dell Online Rack 10 kW UPS model options. 10 kW 208V UPS (DELL10KWOLHVUS) UPS Communication Bay One NEMA L6-30R Outlet RS-232 USB Port Port Two IEC 320-C19 Outlets Two Output Circuit Breakers Load Segment 1 (LS1) 24 | Installation and Startup REPO Ports Ground Screw EBM Connector One NEMA L6-30R Outlet Two IEC 320-C19 Outlets Two Output Circuit Breakers Load Segment 2 (LS2) Input Terminal Block 10 kW 230V UPS (DELL10KWOLHV) UPS Communication Bay RS-232 USB Port Port Two Output Two IEC 320-C19 Circuit Receptacles Breakers One IEC 60309 332R6S Receptacle Load Segment 1 (LS1) EBM Connector REPO Ports One Output Circuit Breaker Ground Screw One IEC 60309 332R6S Receptacle Input Terminal Block Load Segment 2 (LS2) Installation and Startup | 25 10 kW 230V UPS (DELL10KWOLHVB) UPS Communication Bay Two Output Circuit Breakers RS-232 USB Port Port Four IEC 320-C19 Receptacles Load Segment 1 (LS1) 26 | Installation and Startup REPO Ports EBM Connector Two Output Circuit Breakers Four IEC 320-C19 Receptacles Load Segment 2 (LS2) Ground Screw Input Terminal Block Onduleur en baie en ligne Dellt 10 kW Démarrer Avec Votre Système DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com Remarques et avertissements REMARQUE : Une REMARQUE signale des informations importantes qui vous aident à mieux utiliser le logiciel. DANGER : Un DANGER indique une situation dangereuse imminente qui, si elle n'est pas évitée, provoquera la mort ou une blessure grave. AVERTISSEMENT : Un AVERTISSEMENT signale une situation dangereuse potentielle qui risque de provoquer la mort ou une blessure si elle n'est pas évitée. ATTENTION : Une MISE EN GARDE signale une situation dangereuse potentielle susceptible de provoquer une blessure mineure ou modérée ou des dommages matériels si elle n'est pas évitée. DANGER : Respectez l'instruction suivante visant à empêcher toute situation dangereuse qui, si elle n'est pas évitée, peut provoquer la mort ou des blessures graves : S Ce SAI contient des TENSIONS MORTELLES. Toute tâche concernant une réparation ou lâentretien doit UNIQUEMENT ÊTRE EFFECTUÉE PAR UN PERSONNEL DâENTRETIEN AGRÉÉ. Aucune pièce à lâintérieur de cet onduleur ou EBM NE PEUT ÊTRE ENTRETENUE PAR LâUTILISATEUR. Les informations contenues dans ce document sont susceptibles dâêtre modifiées sans préavis. E 2012 Dell Inc. Tous droits réservés. La reproduction de ce document de quelque manière que ce soit est strictement interdite sans lâautorisation écrite de Dell Inc. Marques commerciales utilisées dans ce texte : Dell et le logo DELL sont des marques commerciales de Dell Inc. ENERGY STAR est une marque déposée de lâU.S. Environmental Protection Agency. Dâautres marques et appellations commerciales peuvent être utilisées dans le présent document en référence à des entités qui revendiquent ces marques et appellations, ou leurs produits. Dell Inc. dément tout intérêt de propriété industrielle pour les marques déposées et les appellations commerciales autres que celles lui appartenant. Décembre 2012 Caractéristiques du système Offrant une fiabilité et des performances remarquables, les avantages uniques de lâonduleur comprennent : S Conception en ligne avec sortie sinusoïdale pure. S Véritable technologie en ligne double--conversion avec haute densité de puissance, indépendance de la fréquence du secteur, et compatibilité avec groupe électrogène. S La régulation de tension Buck et Boost qui assure une tension régulée à votre charge en corrigeant les fluctuations de tension. S Lâonduleur filtre et régule le courant CA entrant et fournit un courant constant à votre équipement sans épuiser la batterie. S Mode de fonctionnement haute performance sélectionnable. S Hauteur de lâonduleur 5U. S Capacité de démarrage sur batterie pour alimenter lâonduleur même si le courant du secteur nâest pas disponible. S Lâentretien est simplifié en permettant le remplacement sans danger des batteries sans mettre lâonduleur hors tension. S Les informations de la plaque de service Dell sont consultables sur lâécran LCD du panneau avant. S Autonomie étendue avec un Extended Battery Module (EBM) en option. S Commande dâarrêt dâurgence par les ports dâarrêt dâurgence à distance (REPO). S Deux ports de communication standard (port série RS--232 etUSB). S Dell Network Management Card en option (également appelée NMC) avec des capacités de communication renforcées pour une protection et un contrôle accrus de lâalimentation électrique. S Environmental Monitoring Probe (EMP) en option, pour collecter les mesures de température et dâhumidité dans lâenvironnement du châssis et surveiller les données environnementales à distance. Vous pouvez également collecter et extraire lâétat de deux dispositifs de contact fournis par lâutilisateur. S Gestion avancée de lâalimentation électrique avec les applications logicielles Web Dellt Multi--UPS Management Console (MUMC) and Dellt UPS Local Node Manager (ULNM) pour des coupures progressives et la surveillance de lâalimentation. S Arrêt séquentiel et gestion de charge par des groupes de prises séparés appelés « segments de charge ». S Micrologiciel qui peut être facilement mis à niveau sans appeler le service technique. S Certifié par des approbations dâorganismes mondiaux. S ENERGY STAR® certifié UPS. Caractéristiques du système | 29 Recherche d'informations ATTENTION : Le document Informations relatives à la sécurité, à l'environnement et à la réglementation fournit des informations importantes sur la sécurité et la réglementation. Que recherchez-vous ? S Le guide de lâutilisateur de mon onduleur Trouvez-le ici Disque de l'onduleur Dell S Le guide de lâutilisateur de la Dell Network Management Card S Guide de lâutilisateur de Dell MUMC and Dell ULNM REMARQUE : La documentation et les mises à jour des logiciels sont disponibles sur www.support.dell.com et www.dellups.com. S Spécifications Guide d'utilisateur de l'onduleur Dell S Comment configurer les paramètres de lâonduleur Le guide de lâutilisateur est disponible sur le disque de lâonduleur Dell et sur www.support.dell.com. S Comment identifier et résoudre des problèmes S Comment installer un contrôle REPO S Instructions relatives à la sécurit S Informations sur la réglementation Informations relatives à la sécurité, à l'environnement et à la réglementation S Informations sur le recyclage S Informations sur la garantie Informations sur l'assistance et la garantie Dell S Termes et conditions (États--Unis uniquement) S Contrat de licence de lâutilisateur final S Informations sur lâassistance Site Internet d'assistance Dell â www.support.dell.com REMARQUE : sélectionnez votre région ou votre secteur dâactivité pour localiser le site dâassistance approprié. 30 | Recherche d'informations Installation et démarrage ATTENTION : Avant de réaliser les opérations mentionnés dans le présent document, veuillez lire et restecter les instructions de sécurité et les normes en vigueur spécifiées dans votre document Informations relatives à la sécurité, à l'environnement et à la réglementation. ATTENTION : Déballer l'armoire dans un environnement à basse température risque de produire de la condensation à l'intérieur et sur le module. N'installez pas l'armoire tant que l'intérieur et l'extérieur n'en sont pas absolument secs (risque de choc électrique). ATTENTION : L'installation ou le retrait des plateaux de batteries doivent être réalisés ou supervisés par du personnel qualifié en matière de batteries et des précautions requises. Maintenir le personnel non autorisé loin des batteries. Installation et démarrage | 31 ATTENTION : Le module est lourd (99 kg/218 lb) : Retirez toujours les deux plateaux de batteries de l'onduleur avant de soulever le module. Soulever e module dans la baie exige deux personnes au minimum. ATTENTION : Les batteries sont lourdes (32 kg/71 lb). Utilisez les méthodes de levage appropriées lors du retrait des batteries. REMARQUE : Veillez à déplacer et à ouvrir le carton avec précaution. Laissez les composants dans leurs emballages jusqu'à ce que tout soit prêt pour l'installation. Cette section décrit les étapes de configuration de votre système pour la première fois. Déballage du module Pour déballer le système : 1 À lâaide dâun chariot élévateur ou dâune transpalette électrique,déplacez le carton dâexpédition et la palette près de la baie où vous allez installer lâonduleur. 2 Dégagez et retirez le carton extérieur. 32 | Installation et démarrage 3 Retirez les deux boîtes dâaccessoires installées dans la partie principale en mousse de polystyrène. 4 Ouvrez les boîtes dâaccessoires et posez--les à proximité, sur une surface plane. REMARQUE : Le Guide de l'utilisateur de l'onduleur en baie en ligne Dell 10 kW décrit les procédures de déballage et d'installation. Pour le consulter, ôtez-le de la boîte d'accessoires avant de poser les boîtes d'accessoires à côté. 5 Retirez la partie principale en mousse de polystyrène, puis posez--la sur une surface plane et stable à proximité. Installation et démarrage | 33 REMARQUE : Les supports de fixation de batterie sont marqués L (gauche) et R (droit) pour désigner leurs emplacements respectifs. 6 Retirez les deux supports de fixation de lâonduleur : Repérez le support de fixation gauche (marqué L). Du côté gauche du châssis, faites pivoter la vis à oreilles dans le sens inverse des aiguilles dâune montre pour libérer le support de fixation gauche. Poussez le support vers la tige centrale pour lâextraire du châssis. Orientez le support vers vous, puis tirez--le vers la gauche pour lâextraire. Posez le support sur le côté. Repérez le support de fixation droit (marqué R). Du côté droit du châssis, faites pivoter la vis à oreilles dans le sens inverse des aiguilles dâune montre pour libérer le support de fixation droit. Poussez le support vers la tige centrale pour lâextraire du châssis. Orientez le support vers vous, puis tirez--le vers la droite pour lâextraire. Posez le support sur le côté. 7 Veillez à débrancher tous les connecteurs de batterie. 34 | Installation et démarrage ATTENTION : Les batteries sont lourdes (32 kg/71 lb). Utilisez les méthodes de levage appropriées lors du retrait des batteries. 8 Retirez les plateaux des batteries de lâonduleur : Enlevez les connecteurs de batterie de lâonduleur débranchés vers le haut du compartiment afin quâils ne gènent pas. Saisissez les deux languettes en plastique sur la partie avant du plateau. Tirez le plateau vers vous pour lâextraire. REMARQUE : Les étiquettes orange TIRER ICI indiquent où saisir les languettes. Posez le plateau sur la partie en mousse de polystyrène retirée de la partie supérieure de lâonduleur. Répétez cette opération pour le deuxième plateau. Installation et démarrage | 35 ATTENTION : le module est lourd (46 kg/101lb) lorsque les batteries sont retirées. Le retrait du module du carton d'expédition requiert au moins deux personnes. 9 Avec une personne de chaque côté, levez soigneusement le module hors de la mousse de polystyrène en utilisant les poignées du carton. 10 Posez le module sur une surface plane et stable dans une zone protégée près de la baie où vous allez lâinstaller. REMARQUE : Assurez-vous que cette zone est bien aérée et exempte d'humidité, de gaz inflammable et de corrosion. 36 | Installation et démarrage Configuration en baie ATTENTION : Le module est lourd (99 kg/218 lb). Retirez toujours les deux plateaux de batteries de l'onduleur avant de soulever le module et d'installer l'onduleur sur les rails de la baie. Le levage des modules pour les positionner dans la baie exige deux personnes au minimum. ATTENTION : L'installation ou le retrait des batteries doivent être réalisés ou supervisés par du personnel qualifié en matière de batteries et des précautions requises. Maintenir le personnel non autorisé loin des batteries. ATTENTION : Les batteries sont lourdes (32 kg/71 lb). Utilisez les méthodes de levage appropriées lors du retrait des batteries. ATTENTION : Si vous installez un EBM en option, le EBM doit être placé sous l'onduleur sans espace U entre l'onduleur et le EBM. Cette opération offre une meilleure répartition du poids dans la baie, simplifie l'accès au panneau de commande de l'onduleur et l'acheminement des connexions des câbles de batterie. Cela empêche également l'introduction d'un câble entre le cordon du EBM et la connexion de l'onduleur et les éventuelles pannes de raccordement. AVERTISSEMENT : Pour les systèmes montés en baie : Lorsque plusieurs systèmes sont montés dans une baie, complétez toutes les procédures du système actuel avant d'essayer d'installer le système suivant. REMARQUE : Des rails de fixation sont exigés pour chaque module individuel. REMARQUE : Le module est fourni sans le panneau du couvercle avant fixé. REMARQUE : Les instructions suivantes sont les mêmes pour les baies à trous carrés et les baies à trous ronds non filetés. Les rails s'adaptent aux deux types de baies. Pour installer lâonduleur dans une baie : 1 Veillez à poser les éléments suivants sur une surface plane et stable à proximité de la baie où vous allez installer lâonduleur : S le module S les deux boîtes dâaccessoires de lâonduleur S les deux plateaux de batterie (onduleur seulement) S les deux supports de fixation de batterie (onduleur seulement) Installation et démarrage | 37 Installation des rails 2 Enlevez les rails de la boîte dâaccessoires du kit de rails. 3 Sélectionnez les trous appropriés dans le rail pour positionner le module à lâemplacement souhaité dans la baie. Placez les rails en bas de lâespace 5U destiné à lâonduleur. ATTENTION : Si vous installez un EBM en option, prenez les dispositions pour installer directement le EBM sous l'onduleur sans espace U entre l'onduleur et le EBM. REMARQUE : Repérez les étiquettes correspondant au rail droit (RIGHT FRONT) et au rail gauche (LEFT FRONT). Les rails devraient être placés ainsi pour l'installation. 4 Positionnez les rails gauche et droit comme sur le schéma. Reliez les rails gauche et droit à la baie : Emboîtez lâextrémité arrière du rail jusquâà ce quâil soit totalement en place sur le bord vertical de la baie et que le loquet du crochet soit en place. Tirez le rail en position juste après lâavant de la baie. Poussez lâextrémité avant du rail jusquâà ce quâil soit totalement en place sur le bord vertical de la baie et que le loquet du crochet soit enclenché. 38 | Installation et démarrage Installation et Fixation du Module ATTENTION : le module est lourd (46 kg/101lb) lorsque les batteries sont retirées. Soulever e module dans la baie exige deux personnes au minimum. 5 Faites glisser le module sur les rails et dans la baie. 6 Fixez lâavant du module sur la baie en utilisant les quatre vis à oreilles sur les supports de montage. Serrez manuellement les vis à oreilles dans le sens des aiguilles dâune montre. Nâutilisez pas dâoutils mécaniques. Installation et démarrage | 39 Installation des Plateaux de Batteries 7 Repérez les plateaux des batteries que vous avez placés à côté de la baie. ATTENTION : Les batteries sont lourdes (32 kg/71 lb). Utilisez les méthodes de levage appropriées lors de l'installation des batteries. REMARQUE : Les plateaux des batteries peuvent être installés dans l'un des deux compartiments correspondants. REMARQUE : Insérez le plateau avec la flèche d'avertissement vers le haut. 8 Installez les plateaux de batteries : Enlevez les connecteurs de batterie de lâonduleur vers le haut du compartiment afin quâils ne gènent pas. Faites complètement glisser le plateaux de batteries dans le compartiment. Répétez cette procédure pour installer le deuxième plateau. 9 Insérez les languettes dans la gaine en plastique à lâavant de chaque plateau de manière à les dégager. 40 | Installation et démarrage Branchement des connecteurs de batterie interne 10 Branchez les connecteurs internes des batteries : Branchez les connecteurs du plateau à lâextrémité gauche au connecteur fixe de lâonduleur. Branchez les connecteurs du plateau à lâextrémité droite au connecteur fixe de lâonduleur. REMARQUE : Un petit arc électrique peut survenir lors du branchement des batteries. Ceci est normal, n'endommage pas l'unité et ne pose aucun problème de sécurité. Repérez et connectez les cavaliers de batterie sur chaque côté de la tige centrale. Placez les connecteurs sur le petit support en haut de la tige centrale. REMARQUE : La connexion des cavaliers de batterie centraux permet la connexion en série des deux plateaux. Installation et démarrage | 41 Remplacement du support de fixation des batteries Fente latérale du châssis Fente latérale de la tige centrale REMARQUE : Les supports de fixation de batterie sont marqués L (gauche) et R (droit) pour désigner leurs emplacements respectifs. 11 Remettez en place les supports de fixation de batterie gauche (L) et droit (R) : Pour le premier support de fixation des batteries, insérez la languette du support dans la fente située sur le côté de la tige centrale. Installez soigneusement les câbles de batterie connectés derrière le support de fixation. Alignez lâextrémité du support de fixation de batterie avec la fente située sur le côté du châssis. Poussez le support jusquâà ce quâil sâenclenche bien dans la fente latérale. Faites pivoter la vis à oreilles dans le sens des aiguilles dâune montre pour fixer le support. Répétez cette opération pour le deuxième support de fixation de batterie. 42 | Installation et démarrage Installation du couvercle avant de l'onduleur 12 Retirez le couvercle avant de la boîte dâaccessoires. REMARQUE : Conservez le CD du logiciel, le câble de communication et (si nécessaire) les connecteurs REPO dans la boîte d'accessoires jusqu'à l'installation de l'onduleur. 1 2 Installation et démarrage | 43 13 Installez le couvercle avant de lâonduleur : Alignez le couvercle avant sur la partie avant du châssis. Insérez les languettes droites du couvercle avant dans les trous des languettes situés sur le côté droit du châssis. Poussez la partie gauche du couvercle vers lâavant, puis insérez--la dans le châssis. REMARQUE : Veillez à aligner le panneau LCD du châssis de l'onduleur sur la fenêtre LCD du couvercle avant de le fixer. 14 Jetez ou recyclez lâemballage de manière responsable, ou conservez--le pour une utilisation ultérieure. Connexion de l'Equipement Pour installer lâonduleur : 1 Si vous envisagez dâutiliser le logiciel Dell MUMC and Dell ULNM, établissez la communication de lâune des manières suivantes : S via la Dell Network Management Card (si elle est installée), S via le câble fourni pour relier votre ordinateur au port USB. REMARQUE : Pour de plus amples informations sur les options de communication, référez-vous au Guide de l'utilisateur de l'onduleur en baie en ligne Dell 10 kW. 2 Si votre châssis a des conducteurs pour la mise à la terre ou des soudures de pièces métalliques non reliées à la masse, connectez le câble de masse (non fourni) à la vis de connexion à la masse. Voir « Panneaux arrière de lâonduleur » page 51 pour lâemplacement de la vis de mise à la terre pour chacun des trois modèles. 3 Si un interrupteur dâarrêt (disjoncteur) dâurgence est requis par les réglementations locales, référez--vous à « Installation dâun arrêt dâurgence à distance » dans le Guide de lâutilisateur de lâonduleur en baie en ligne Dell 10 kW. 4 Si vous installez un EBM en option, référez--vous au Guide de mise en route de lâEBM en baie en ligne Dell 10 kW pour les instructions dâinstallation. ATTENTION : If the UPS is stored or used without an EBM, the battery connector cover on the rear panel of the UPS must be installed as a safety precaution. 5 Branchez lâéquipement à protéger sur les prises de sortie de lâonduleur, mais ne mettez pas lâéquipement à protéger sous tension. 6 Prenez toutes les dispositions nécessaires pour le maintien et la protection du cordon. REMARQUE : Pour éviter une alarme de surcharge, vérifiez que les valeurs nominales totales de l'équipement ne dépassent pas la capacité de l'onduleur. 44 | Installation et démarrage Câblage de l'entrée de l'onduleur AVERTISSEMENT : Risque de choc électrique. Seul un personnel qualifié (comme un électricien agréé) peut réaliser le branchement électrique. Les modèles Baie En Ligne Dell câblés requièrent un circuit de branchement spécifique conforme aux spécifications suivantes : S Le système de protection demande un dispositif de déconnexion bipolaire entre la sortie de lâonduleur et la charge S Le disjoncteur doit être fixé au mur et facilement accessible pour lâopérateur S Pour lâEurope. Le disjoncteur doit répondre à la norme IEC/EN 60934 et avoir un entrefer par contact dâau moins 3 mm S 200â240 V CA S Monophasée S 50/60 Hz S Conduit métallique flexible (recommandé pour la facilité de service et dâentretien) Mur Disjoncteur bipolaire Ligne Secteur CA SAI Neutre/L2 Installation et démarrage | 45 Retrait du couvercle cache-bornes Trou défonçable Cache du bornier 1 Éteignez lâalimentation au point de distribution où lâonduleur sera connecté. Soyez absolument sûr quâil nây a pas dâalimentation. 2 Retirez le couvercle cache--bornes (deux vis) et mettez--le de côté. 3 Percez le trou défonçable dans le cache du bornier pour faire passer le conduit dâentrée. Le trou doit convenir à un conduit métallique flexible (IMC) de 1â ou 1,5â (25,4 mm ou 38,1 mm). 46 | Installation et démarrage ATTENTION : Si l'onduleur ne dispose pas d'un dispositif de protection contre les renvois de tension, installez un dispositif isolant externe. Après l'installation du dispositif, il vous faudra apposer sur le contacteur CA externe un message d'avertissement dans les termes suivants ou leur équivalent : RISQUE DE RETOUR DE TENSION. Isolez l'onduleur avant d'intervenir sur ce circuit, puis vérifiez l'absence de tension dangereuse entre toutes les bornes. Panneau de distribution externe SAI Légende Q T L/L1 L/L1 N/L2 N/L2 B Q T N/L2 L/L1 Interrupteur de bobine à distance Alimentation magnéto-thermique Interrupteur principal Contacteur CA Neutre/L2 Entrée de ligne L1 B Le tableau ci--dessous énumère les dispositifs de protection contre les renvois de tension (contacteurs CA) qui peuvent être utilisés comme un dispositif isolant externe de protection contre les renvois de tension. Utilisez uniquement les contacteurs CA énumérés dans le tableau. Fabricant Type Valeur nominale A75--30 220â240 VCA, 105 A 25 HP à 208 V, 30 HP à 240 V Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (alternative) GSC1(CJX4--d)--6511 220â240 VCA, 68 A 25 HP Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (alternative) GSC1(CJX4--d)--8011 220â240 VCA, 80 A 30 HP ABB France (E12527) REMARQUE : Une protection contre les renvois de tension est fournie même si l'onduleur n'offre aucun relais anti-renvoi de tension. Par exemple, si certains composants s'avèrent altérés en mode batterie, la tension de sortie peut revenir vers l'entrée par rétroaction. Dans ce cas, un transformateur de courant permet de détecter la tension de rétroaction parallèle. Si une erreur de rétroaction électrique est détectée, l'onduleur désactive la sortie de l'inverseur pour éviter tout risque de blessure corporelle. Installation et démarrage | 47 Installation des Câbles d'Entrée et de Terre 1 2 3 4 Tirez le câble dâentrée par le conduit, en laissant environ 60,96 cm (0.5m) de câble exposé. Fixez une attache métallique flexible à lâextrémité du conduit. 5 Insérez le tuyau dans lâentrée des fils et attachez la fixation du tuyau au panneau. Dénudez 0.5â (1,5 cm) dâisolation à lâextrémité de chaque câble dâarrivée. 6 Connectez les fils dâentrée et de masse au bornier dâentrée conformément aux spécifications du câblage de lâonduleur dans le tableau suivant. Fonction du câble Position de la Borne Fonction du fil de l'onduleur 1 Terre dâentrée 2 L2/Neutre In 3 L1 In Entrée Valeur nominale de la taille du fil du terminal* Couple de serrage 16--35 mm2 (8--2 AWG) 1.7 Nm (15 lb--in) * Utilisez un minimum : S 8 AWG pour un fil de terre de lâéquipement, fil de cuivre minimum 75_C S 4 AWG pour fils neutres et de ligne dâentrée, fil de cuivre minimum 75_C 7 Replacez le couvercle cache--bornes. 48 | Installation et démarrage Démarrage de l'onduleur Bouton Marche/Arrêt Pour démarrer lâonduleur : 1 Vérifiez que les batteries internes sont connectées. 2 Si un EBM en option est installé, vérifiez quâil EBM est connecté à lâonduleur. Reportez--vous au Guide de mise en route de lâEBM en baie en ligne Dell 10 kW pour plus dâinformations. 3 Vérifiez que tous les disjoncteurs des segments de charge sont en position ON. 4 Allumez le disjoncteur du secteur. Lâécran du panneau LCD de lâonduleur sâallume. Lâécran de démarrage Dell passe à lâécran de résumé dâétat de lâonduleur. Lâécran du panneau avant de lâonduleur affiche lâicône Veille . clignotante 5 Appuyez sur le bouton Marche/Arrêt sur le panneau avant de lâonduleur. Une fois le démarrage terminé, lâétat change en fonction du mode opérationnel de lâonduleur. Installation et démarrage | 49 6 Sur lâécran de résumé dâétat de lâonduleur, appuyez sur le bouton pour vérifier les notifications et les alarmes actives. Traitez toutes les alarmes actives avant de continuer. Voir « Dépannage » dans le Guide de lâutilisateur de lâonduleur en baie en ligne Dell 10 kW. Si aucune alarme nâest activée, un message « Aucune alarme active » apparaîtra. 7 Vérifiez que lâicône Normal apparaisse sur lâécran de résumé dâétat de lâonduleur, indiquant que lâonduleur fonctionne normalement et que toutes les charges sont alimentées. 8 Reportez--vous au Guide de lâutilisateur de lâonduleur en baie en ligne Dell 10 kW pour ce qui suit : S Pour les procédures de configuration si un module dâextension de batterie en option (EBM) est install S Pour définir la date et lâheure et changer dâautres paramètres dâusine par défaut 9 Si vous aviez installé un REPO en option, vérifiez la fonction REPO : Activez lâinterrupteur externe REPO. Vérifiez le changement dâétat sur lâafficheur de lâonduleur. Désactivez lâinterrupteur externe REPO et redémarrez lâonduleur. 10 Chargez les batteries. REMARQUE : Les batteries internes se chargent à 90% de leur capacité en moins de trois heures. Cependant, vous devez recharger les batteries pendant 48 heures après l'installation ou un stockage de longue durée. ATTENTION : Pour éviter des conditions de surcharge de l'onduleur, connectez une seule charge à la fois et vérifiez que chaque dispositif protégé démarre complètement avant de connecter la charge suivante. REMARQUE : Dell recommande de régler la date et l'heure à des fins de dépannage ou de garantie. 50 | Installation et démarrage REMARQUE : Au démarrage initial, l'onduleur règle la fréquence du système selon la fréquence de la ligne d'entrée (la détection automatique de la fréquence d'entrée est activée par défaut). Après le démarrage initial, la détection automatique est désactivée jusqu'à ce qu'elle soit réactivée manuellement par paramétrage de la fréquence de sortie. REMARQUE : Au démarrage initial, la détection automatique de la tension d'entrée est activée par défaut. Après le démarrage suivant, la détection automatique est désactivée jusqu'à ce qu'elle soit réactivée manuellement par paramétrage de la tension de sortie. Identification des Panneaux arrières de l'onduleur Cette section illustre les panneaux arrières des trois options de modèles dâonduleurs Baie En Ligne Dell 10 kW. Onduleur 10 kW 208 V (DELL10KWOLHVUS) Baie de communication de l'onduleur Une prise NEMA L6-30R Port Port RS-232 USB Deux prises CEI 320-C19 Deux coupe-circuits de sortie Segment de charge 1 (LS1) Ports REPO Vis de mise à la terre Connecteu r de l'EBM Une prise NEMA L6-30R Deux prises CEI 320-C19 Bornier d'entrée Deux coupe-circuits de sortie Segment de charge 2 (LS2) Installation et démarrage | 51 Onduleur 10 kW 230 V (DELL10KWOLHV) Baie de communication de l'onduleur Deux Deux Prises coupe-circuits CEI 320-C19 de sortie Port Port RS-232 USB Une prise CEI 60309 332R6S Segment de charge 1 (LS1) 52 | Installation et démarrage Ports REPO Connecteur de l'EBM Un coupe-circuit de sortie Une prise CEI 60309 332R6S Segment de charge 2 (LS2) Vis de mise à la terre Bornier d'entrée Onduleur 10 kW 230 V (DELL10KWOLHVB) Baie de communication de l'onduleur Port Port RS-232 USB Deux coupe-circuits Quatre prises CEI 320-C19 de sortie Segment de charge 1 (LS1) Ports REPO Connecteur de l'EBM Deux coupe-circuits de sortie Quatre prises CEI 320-C19 Vis de mise à la terre Bornier d'entrée Segment de charge 2 (LS2) Installation et démarrage | 53 54 | Installation et démarrage Dellt Online-Rack-USV 10 kW Erste Schritte mit Ihrem System DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com Hinweise und Warnungen HINWEIS: Ein HINWEIS macht auf eine wichtige Information aufmerksam, mit deren Hilfe Sie Ihre Software optimal nutzen können. GEFAHR: GEFAHR macht auf eine unmittelbar gefährliche Situation aufmerksam, die zum Tod oder schweren Verletzungen führt, wenn sie nicht vermieden wird. WARNUNG: WARNUNG macht auf eine potenziell gefährliche Situation aufmerksam, die zum Tod oder zu Verletzungen führt, wenn sie nicht vermieden wird. ACHTUNG: ACHTUNG macht auf eine potenziell gefährliche Situation aufmerksam, die zu geringen oder mäßigen Verletzungen oder Sachschäden führen kann, wenn sie nicht vermieden wird. GEFAHR: Beachten Sie den folgenden Hinweis, um eine unmittelbar gefährliche Situation zu vermeiden, die zum Tod oder zu schweren Verletzungen führen könnte: S Diese USV enthält LEBENSGEFÄHRLICHE SPANNUNG. Sämtliche Reparatur-- und Wartungsarbeiten dürfen NUR VON BEFUGTEM WARTUNGSPERSONAL durchgeführt werden. Im Inneren der USV oder des EBM sind KEINE VOM BENUTZER ZU WARTENDEN TEILE vorhanden. Die Angaben in diesem Dokument unterliegen unangekündigten Änderungen. E 2012 Dell Inc. Alle Rechte vorbehalten. Eine Vervielfältigung gleich welcher Art ist ohne schriftliche Genehmigung von Dell Inc. strengstens untersagt. In diesem Text verwendete Marken: Dell und dem DELL Logo handelt es sich um Marken von Dell Inc. Die Bezeichnung ENERGY STAR ist eine eingetragene Marke der US-amerikanischen Umweltbehörde EPA (Environmental Protection Agency). In diesem Dokument können weitere Marken und eingetragene Marken verwendet werden, die sich entweder auf die Personen beziehen, die diese Marken und Namen für sich beanspruchen, oder auf deren Produkte. Dell Inc. verzichtet auf sämtliche gewerblichen Eigentumsrechte an Marken und eingetragenen Marken, bei denen es sich nicht um eigene Marken und eingetragene Marken handelt. Dezember 2012 Systemmerkmale Mit ihrer herausragenden Leistung und Zuverlässigkeit bietet die USV--Anlage die folgenden einzigartigen Vorteile: S Online USV--Design mit reinem Sinusausgang S Echte Online--Doppelwandlertechnologie mit hoher Leistungsdichte, Unabhängigkeit der Netzfrequenz und Generatorkompatibilität S Spannungsregulierung durch das Buck and Boost --Verfahren. Dieses gewährleistet durch die Korrektur von Unregelmäßigkeiten einen gleich bleibenden Spannungswert für Ihre Anlagen. S Die USV filtert und regelt eingehenden Wechselstrom und sorgt für eine gleichförmige Versorgung Ihrer Anlagen mit Strom, ohne Energie vom Akku zu ziehen. S Auswählbarer Hocheffizienzbetrieb S Höhe der USV 5 HE S Starten der Anlage im Batteriebetrieb zum Versorgen der USV mit Strom, selbst wenn kein Netzstrom zur Verfügung steht S Durch die Möglichkeit, die Akkus sicher auszutauschen, ohne die USV auszuschalten, wird die Wartung des Gerätes erleichtert. S S S S S Informationen zum Dell Service Tag können am LCD--Display der Frontplatte abgelesen werden. Verlängerte Laufzeit mit einem optionalen Batterieerweiterungsmodul (EBM) Notausschaltungssteuerung über die REPO--Schnittstelle (Remote Emergency Power--off) Zwei Standard--Kommunikationsschnittstellen (USV--Schnittstelle und serielle RS--232 Schnittstelle) Optionale Dell Network Management Card (auch unter der Bezeichnung NMK bekannt) mit zusätzlichen Kommunikationsfunktionen für ein besseres Stromversorgungs--Management S Optionale Environmental Monitoring Probe (EMP) zum Erfassen von Messwerten zu Temperatur und Luftfeuchtigkeit in der Rahmenumgebung und ortsferne Überwachung der Umgebungsdaten. Sie können ebenso den Status von zwei vom Kunden bereitgestellten Kontaktgeräten erfassen und abrufen. S Erweiterte Stromüberwachung mit den webbasierten Software--Anwendungen Dellt Multi--UPS Management Console (MUMC) and Dellt UPS Local Node Manager (ULNM) für ordnungsgemäßes Herunterfahren und Stromüberwachung S Sequenzielle Abschaltung und Lastenmanagement durch separate Anschlussgruppen (so genannte Lastsegmente) S Firmware, die sich einfach und ohne Wartungsdienst aktualisieren lässt S Entspricht einschlägigen weltweit gültigen Normen. S ENERGY STAR®-zertifizierte USV-Anlagen. Systemmerkmale | 57 Auffinden von Informationen ACHTUNG: Das Dokument Informationen zu Sicherheit, Umwelt und gesetzlichen Vorschriften enthält wichtige Informationen zu Sicherheit und Vorschriften. Wonach suchen Sie? S Die Benutzeranleitung für die USV Hier finden Sie es. Disk der Dell USV S Die Benutzeranleitung für die Dell Network Management Card S Dell MUMC and Dell ULNM Benutzeranleitungen HINWEIS: Dokumentation und Softwareaktualisierungen finden Sie unter www.support.dell.com und www.dellups.com. S Spezifikationen Benutzeranleitung der Dell USV S Konfigurieren der USV--Einstellungen Die Benutzeranleitung finden Sie auf der Disk der Dell USV und unter www.support.dell.com. S Fehlerbehebung und Problemlösung S Installation der REPO--Steuerung S Sicherheitshinweise S Gesetze und Vorschriften Informationen zu Sicherheit, Umwelt und gesetzlichen Vorschriften S Recycling--Informationen S Garantieinformation Dell Garantie- und Supportinformation S Nutzungsbedingungen (nur USA) S Lizenzvereinbarung für Endbenutzer S Supportinformationen Dell Support Website â www.support.dell.com HINWEIS: Wählen Sie Ihre Region oder Ihre Sparte, um die passende Support--Site aufzurufen. 58 | Auffinden von Informationen Installation und Inbetriebnahme ACHTUNG: Vor der Ausführung der Verfahren in diesem Dokument lesen und befolgen Sie bitte die Sicherheitshinweise und wichtigen Informationen zu gesetzlichen Vorschriften in Ihrem Dokument Informationen zu Sicherheit, Umwelt und gesetzlichen Vorschriften. ACHTUNG: Beim Auspacken des Gehäuses bei niedriger Umgebungstemperatur kann sich in oder am Gehäuse Kondenswasser bilden. Das Gehäuse erst installieren, wenn die Innen- und Außenseite des Gehäuses vollkommen trocken ist (Gefahr eines elektrischen Schlages). ACHTUNG: Der Einbau bzw. das Entfernen der Akkuträger sollte von Personal mit Kenntnissen über Akkus unter Beachtung der erforderlichen Sicherheitsvorkehrungen durchgeführt oder beaufsichtigt werden. Nicht ausreichend geschultem Personal ist der Zugang zu den Akkus zu verwehren. Installation und Inbetriebnahme | 59 ACHTUNG: Das Gehäuse ist schwer (99 kg): Entfernen Sie grundsätzlich beide Akkufächer aus der USV, bevor Sie das Gehäuse anheben. Zum Heben des Gehäuses in das Rack sind mindestens zwei Personen erforderlich. ACHTUNG: Die Akkus sind schwer (32 kg). Verwenden Sie beim Entfernen der Akkus angemessene Hebetechniken. HINWEIS: Transportieren und öffnen Sie den Karton mit Sorgfalt. Die Komponenten sollten in der Verpackung verbleiben, bis alles für die Installation bereit ist. In diesem Abschnitt werden die Schritte für die Erstkonfiguration Ihres Systems beschrieben. Auspacken des Gehäuses So packen Sie das System aus: 1 Setzen Sie den Versandkarton auf der Palette mit einem Gabelstapler oder Hubwagen in der Nähe des Racks ab, in dem die USV eingebaut werden soll. 2 Trennen Sie den Außenkarton ab und entfernen Sie ihn. 60 | Installation und Inbetriebnahme 3 Entnehmen Sie die beiden Zubehörkartons aus den Vertiefungen im oberen Styropordeckel. 4 Öffnen Sie die Kisten für Zubehör und setzen Sie diese auf eine flache, stabile Unterlage in der Nähe ab. HINWEIS: Die Benutzeranleitung für die Dell Online-Rack-USV 10 kW beschreibt, wie beim Auspacken und bei der Installation vorzugehen ist. Nehmen Sie sie dazu aus dem Zubehörkarton, bevor Sie die Zubehörkartons beiseite legen. 5 Entfernen Sie den oberen Styropordeckel und setzen Sie ihn auf einer flachen, stabilen Unterlage in der Nähe ab. Installation und Inbetriebnahme | 61 HINWEIS: Die Akkuhalterungen sind mit L (Links) und R (Rechts) beschriftet, um anzugeben, wo sie installiert werden müssen. 6 Entfernen Sie beide Halterungen von der USV: Suchen Sie die linke Halterung (mit der Bezeichnung L). Auf der linken Gehäuseseite die Rändelschraube gegen den Uhrzeigersinn drehen, um die linke Halterung zu lösen. Schieben Sie die Halterung zum Lösen vom Gehäuse in Richtung Mittelsteg. Klappen Sie die Halterung auf Sie zu und ziehen Sie die Halterung zum Entfernen nach links. Legen Sie die Halterung beiseite. Suchen Sie die rechte Halterung (mit der Bezeichnung R). Auf der rechten Gehäuseseite die Rändelschraube gegen den Uhrzeigersinn drehen, um die rechte Halterung zu lösen. Schieben Sie die Halterung zum Lösen vom Gehäuse in Richtung Mittelsteg. Klappen Sie die Halterung auf Sie zu und ziehen Sie die Halterung zum Entfernen nach rechts. Legen Sie die Halterung beiseite. 7 Stellen Sie sicher, dass alle Akkuanschlüsse abgezogen sind. 62 | Installation und Inbetriebnahme ACHTUNG: Die Akkus sind schwer (32 kg). Verwenden Sie beim Entfernen der Akkus angemessene Hebetechniken. 8 Entfernen Sie die Akkufächer aus der USV: Schieben Sie die freien USV--Akkustecker nach oben in das Akkufach, damit diese nicht im Weg sind. Greifen Sie in die beiden Ringlaschen aus Kunststoff an der Vorderseite des Akkuträgers. Ziehen Sie den Träger zu sich heraus. HINWEIS: Die orange Beschriftung mit PULL HERE (HIER ZIEHEN) zeigt an, wo Sie die beiden Ringlaschen greifen müssen. Setzen Sie den Akkuträger auf den Styropordeckel, den Sie von der Oberseite der USV abgehoben haben. Wiederholen Sie den Vorgang mit dem zweiten Akkuträger. Installation und Inbetriebnahme | 63 ACHTUNG: Das Gehäuse ist trotz entfernter Akkus schwer (46 kg). Zum Heben des Gehäuses aus dem Versandkarton sind mindestens zwei Personen erforderlich. 9 Heben Sie das Gehäuse mit einer Person auf jeder Seite mit den Griffen am Karton vorsichtig aus dem Styropor heraus. 10 Setzen Sie das Gehäuse auf einer flachen, stabilen Unterlage in einem geschützten Bereich in der Nähe des Racks ab, in der es eingebaut werden soll. HINWEIS: Stellen Sie sicher, dass der Ort ausreichend belüftet und frei von Feuchtigkeit, entzündlichen Gasen und Korrosion ist. 64 | Installation und Inbetriebnahme Rackmontage ACHTUNG: Das Gehäuse ist schwer (99 kg): Entfernen Sie immer beide Akkuträger, bevor Sie das Gehäuse anheben und die USV in die Schienen im Rack einbauen. Zum Heben des Gehäuses in das Rack sind mindestens zwei Personen erforderlich. ACHTUNG: Der Ein- bzw. Ausbau der Akkus sollte unter Befolgung der erforderlichen Sicherheitsvorkehrungen durch fachkundiges Personal durchgeführt oder beaufsichtigt werden. Nicht ausreichend geschultem Personal ist der Zugang zu den Akkus zu verwehren. ACHTUNG: Die Akkus sind schwer (32 kg). Verwenden Sie beim Entfernen der Akkus angemessene Hebetechniken. ACHTUNG: Wenn Sie ein optionales EBM installieren, muss dies unterhalb der USV und ohne HE-Raum zwischen USV und EBM positioniert werden. Dadurch wird das Gewicht besser im Rack verteilt, der Zugriff auf das USV-Bedienfeld vereinfacht und die Kabelführung für die Akkukabelanschlüsse erleichtert. Dies verhindert auch einen Zug zwischen dem EBM-Kabel und dem USV-Anschluss und mögliche Verbindungsfehler. WARNUNG: Für rackmontierte Systeme: Beim Installieren von mehreren Systemen in einem Rack, schließen Sie zunächst sämtliche Abläufe für das aktuelle System ab, bevor Sie versuchen, das nächste System zu installieren. HINWEIS: Für jedes Gehäuse sind eigene Montageschienen erforderlich. HINWEIS: Das Gehäuse wird ohne angebaute Frontblende geliefert. HINWEIS: Die folgenden Anweisungen gelten sowohl für Racks mit quadratischen Öffnungen als auch für Racks mit runden Öffnungen ohne Gewinde. Die Schienen passen zu beiden Rackarten. So installieren Sie die USV in einem Rack: 1 Stellen Sie sicher, dass folgende Elemente auf einer flachen, stabilen Unterlage in der Nähe des Racks bereit liegen, in dem die USV eingebaut werden soll: S Gehäuse S zwei Zubehörkartons für die USV S zwei Akkuträger (nur USV) S zwei Akkuhalterungen (nur USV) Installation und Inbetriebnahme | 65 Montage der Schienen 2 Entnehmen Sie die Schienen aus dem Zubehörkarton für den Schienensatz. 3 Wählen Sie die korrekten Öffnungen in der Schiene aus, um das Gehäuse wie gewünscht im Rack zu positionieren. Suchen Sie die Schienen an der Unterseite des für die USV vorgesehenen 5 HE--Platzes. ACHTUNG: Wenn Sie ein optionales EBM installieren, treffen Sie Vorkehrungen zum Einbau des EBMs direkt unterhalb der USV und ohne HE-Raum zwischen der USV und dem EBM. HINWEIS: Achten Sie auf die Beschriftungen auf den Schienen für rechte Vorderseite (mit der Bezeichnung RIGHT FRONT) und für linke Vorderseite (mit der Bezeichnung LEFT FRONT). Die Schienen sind wie folgt zur Installation zu positionieren. 4 Positionieren Sie die linke und rechte Schiene wie dargestellt. Bringen Sie die linke und die rechte Schiene am Rack an: Schieben Sie das hintere Ende der Schiene hinein, bis es vollständig auf dem vertikalen Gestellflansch sitzt und der Haken einrastet. Ziehen Sie die Schiene ein wenig über die Vorderseite des Racks hinaus. Schieben Sie das vordere Ende der Schiene hinein, bis es vollständig auf dem vertikalen Rackflansch sitzt und der Haken einrastet. 66 | Installation und Inbetriebnahme Installation und Sicherung des Gehäuses ACHTUNG: Das Gehäuse ist trotz entfernter Akkus schwer (46 kg). Zum Heben des Gehäuses in das Rack sind mindestens zwei Personen erforderlich. 5 Schieben Sie das Gehäuse auf die Schienen und in das Rack. 6 Befestigen Sie die Vorderseite des Gehäuses mit den vier Rändelschrauben auf den Halterungen am Gestell. Ziehen Sie die Rändelschrauben im Uhrzeigersinn von Hand fest. Verwenden Sie keine Elektrowerkzeuge. Installation der Batterieträger 7 Suchen Sie nach den Akkuträgern, die Sie sich in der Nähe des Racks zurechtgelegt haben. Installation und Inbetriebnahme | 67 ACHTUNG: Die Akkus sind schwer (32 kg). Verwenden Sie beim Einbau der Akkus angemessene Hebetechniken. HINWEIS: Die Akkuträger können in beide Akkuschächte eingebaut werden. HINWEIS: Schieben Sie den Träger hinein, wobei der Pfeil des Warnschildes nach oben weisen muss. 8 Installation der Akkuträger: Schieben Sie die USV--Akkustecker nach oben in das Akkufach, damit diese nicht im Weg sind. Schieben Sie den Akkuträger vollständig in das Akkufach. Wiederholen Sie den Vorgang mit dem zweiten Akkuträger. 9 Klemmen Sie die Ringlaschen in die Kunststofftülle an der Vorderseite jedes Akkuträgers, damit diese nicht im Weg sind. Anschließen der Anschlüsse des internen Akkus 10 Den Anschluss des internen Akkus anklemmen: Schließen Sie den Akkuträgerstecker hinten links an den festen USV--Anschluss. Schließen Sie den Akkuträgerstecker hinten rechts an den festen USV--Anschluss. HINWEIS: Beim Verbinden der Akkus kann es zu einem kleinen Lichtbogen kommen. Das ist normal und schadet weder der Anlage noch stellt es ein Sicherheitsrisiko dar. Suchen und verbinden Sie die Akkubrücken auf jeder Seite des Mittelstegs. Setzen Sie die Anschlüsse auf die kleine Ablage oben auf dem Mittelsteg. HINWEIS: Durch das Verbinden der Brücken in der Mitte der Akkus werden die beiden Akkuträger seriell verbunden. 68 | Installation und Inbetriebnahme Auswechseln der Akkuhalterungen Gehäuse-Seitenkanal Mittelsteg-Seitenkanal HINWEIS: Die Akkuhalterungen sind mit L (Links) und R (Rechts) beschriftet, um anzugeben, wo sie installiert werden müssen. 11 Setzen Sie die linke (L) und rechte (R) Akkuhalterung wieder ein: Schieben Sie für die erste Akkuhalterung die Halterungslasche in den Kanal auf der Seite des Mittelstegs ein. Verbergen Sie die verbundenen Akkukabel ordentlich hinter der Halterung. Richten Sie das Ende der Akkuhalterung am Kanal auf der Gehäuseseite aus. Drücken Sie die Halterung, bis diese fest in dem Seitenkanal sitzt. Drehen Sie die Rändelschraube im Uhrzeigersinn ein, um die Halterung zu sichern. Wiederholen Sie den Vorgang mit der Halterung für den zweiten Akku. Installation der vorderen USV-Abdeckung 12 Nehmen Sie die Frontplatte aus dem Zubehörkarton. Installation und Inbetriebnahme | 69 HINWEIS: Lassen Sie die Software-CD, Kommunikationskabel und (gegebenenfalls) die REPO-Anschlüsse im Zubehörkarton, bis Sie die USV installieren. 1 2 13 Installieren Sie die vordere USV--Abdeckung: Richten Sie die Frontblende an der Vorderseite des Gehäuses aus. Schieben Sie die rechten Laschen auf der Frontplatte in die Laschenöffnungen auf der rechten Gehäuseseite. Drücken Sie die linke Seite der Blende nach vorne und rasten Sie sie am Gehäuse ein. HINWEIS: Stellen Sie sicher, dass die LCD-Anzeige am USV-Gehäuse mit dem LCD-Fenster an der Frontblende übereinstimmt, bevor Sie die Blende am Gehäuse fixieren. 14 Entsorgen oder recyceln Sie die Verpackung auf umweltbewusste Weise oder bewahren Sie sie für späteren Gebrauch auf. 70 | Installation und Inbetriebnahme Anschließen der Anlage So installieren Sie die USV: 1 Falls Sie planen, Dell MUMC and Dell ULNM--Software zu verwenden, stellen Sie auf eine der folgenden Arten und Weisen eine Kommunikationsverbindung her: S über die Dell Network Management Card (falls installiert) S über das mitgelieferte Kabel zum Anschluss Ihres Rechners an die USB--Schnittstelle HINWEIS: Weitere Informationen zu Optionen für die Datenkommunikation erhalten Sie in der Benutzeranleitung für die Dell Online-Rack-USV 10 kW. 2 Falls Ihr Rack über Erdungsleitungen oder Leitungen zum Erden nicht geerdeter Metallteile verfügt, schließen Sie das Erdungskabel (nicht enthalten) an die Erdungsschraube an. Zur Position der Erdungsschraube für die einzelnen Gerätetypen siehe Rückseitige Anschlussleisten der USV auf Seite 78. 3 Falls die örtliche Gesetzgebung einen Not--Aus--Schalter (Sicherung) vorschreibt, schlagen Sie unter âInstallieren der Notausschaltsteuerungâ in der Benutzeranleitung für die Dell Online--Rack--USV 10 kW nach. 4 Wenn Sie ein optionales EBM einbauen, finden in der Erste Schritte mit dem Dell Online Rack EBM 10 kW Installationsanweisungen. ACHTUNG: Sollte die USV ohne ein EBM gelagert oder verwendet werden, muss die Akkuanschlussabdeckung auf der Geräterückseite der USV aus Sicherheitsgründen installiert sein. 5 Stecken âSie Stecker der zu schützendenâ Geräte in die Anschlussbuchsen der USV ein, aber schalten Sie die geschützten Geräte noch nicht ein. 6 Treffen Sie alle nötigen Vorkehrungen zum Verlegen und Entlasten der Kabel. HINWEIS: Vergewissern Sie sich, dass die Gesamtnennleistungen aller angeschlossenen Geräte die Kapazität der USV nicht überschreiten, um einen Überlastalarm zu vermeiden. Installation und Inbetriebnahme | 71 Feste Verdrahtung des USV-Eingangs WARNUNG: Gefahr eines Stromschlages. Arbeiten im Zusammenhang mit Elektroinstallation dürfen nur von qualifiziertem technischen Personal (Elektrofachbetrieb / Elektromeister) vorgenommen werden. Für die festverdrahteten Dell Online--Rack--Gerätetypen ist eine geeignete Abzweigleitung erforderlich. Diese muss die folgenden Anforderungen erfüllen: S Für das Schutzgerät muss ein zweipoliges Ausschaltgerät zwischen dem USV--Eingang und dem Netzstrom geschaltet werden. S Die Sicherung muss in die Wand eingebaut und für den Betreiber leicht zugänglich sein. S Für Europa: Die Sicherung muss die Norm IEC/EN 60934 erfüllen und einen Kontakt--Luftspalt von mindestens 3 mm aufweisen. S 200â240 V AC S Einphasig S 50/60 Hz S Flexibles Metallkabelrohr (empfohlen für einfache Reparatur und Wartung) Wand 2-poliger Überlastschalter Außenleiter Hauptnetz USV Neutral/L2 72 | Installation und Inbetriebnahme Entfernen der Klemmenabdeckung Durchschlagloch Klemmenabdeckung 1 Schalten Sie den Netzstrom an dem Verteilerpunkt ab, an dem die USV angeschlossen wird. Überzeugen Sie sich davon, dass der Strom völlig abgeschaltet ist. 2 Entfernen Sie die Klemmenabdeckung (zwei Schrauben) und legen Sie sie zur Seite. 3 Entfernen Sie das Durchschlagloch aus der Klemmenabdeckung für das Eingangskabelrohr. Das Loch muss ein mittleres Leitungsrohr der Größe 1â bzw. 1.5â (25,4 mm bzw. 38,1 mm) aufnehmen können. Installation und Inbetriebnahme | 73 ACHTUNG: Falls die USV keine automatische Schutzvorrichtung gegen Stromrückkopplung aufweist, installieren Sie eine externe Isolationsvorrichtung. Nach Installation einer solchen Vorrichtung müssen Sie auf dem externen AC-Schütz ein Warnetikett mit dem folgenden Wortlaut oder einem entsprechenden Wortlaut anbringen: RISIKO DER SPANNUNGSRÜCKKOPPLUNG. Isolieren Sie die USV, bevor Sie diesen Schaltkreis ansteuern, und prüfen Sie, ob keine gefährliche Spannung zwischen den Klemmen vorliegt. Externes Verteilerfeld USV Legende Q T L/L1 L/L1 N/L2 N/L2 B Q T N/L2 L/L1 Spulenfernschalter Magnetothermischer Eingangshauptschalter AC-Schütz Neutral/L2 L1 Leitungseingang B Die folgende Tabelle listet die Rückkopplungsschutzgeräte (AC--Schütze) auf, die als externe Isolationsgeräte zum Rückkopplungsschutz verwendet werden können. Verwenden Sie nur die in der Tabelle aufgeführten AC--Schütze. Hersteller Typ Nennstrom A75--30 220â240 VAC, 105 A 25 PS bei 208 V, 30 PS bei 240 V Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (alternativ) GSC1(CJX4--d)--6511 220â240 VAC, 68A 25 PS Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (alternativ) GSC1(CJX4--d)--8011 220â240 VAC, 80A 30 PS ABB France (E12527) HINWEIS: Auch wenn die USV über keine Anti-Rückkopplungs-Relais (ABF-Relais) verfügt, ist ein gewisser Rückkopplungsschutz implementiert. Wenn beispielsweise Komponenten im Akkumodus beschädigt werden, kann die Ausgangsspannung in den Eingang zurückgeführt werden. In diesem Fall wird ein Stromwandler verwendet, um die Rückkopplungsspannung des Bypass-Stroms zu erkennen. Falls ein Fehlerzustand bei der Stromrückkopplung festgestellt wird, unterbricht die USV den Umrichterausgang, um Personenschaden zu vermeiden. 74 | Installation und Inbetriebnahme Installieren der Eingangs- und Erdungsdrähte 1 2 3 4 Ziehen Sie das Eingangskabel durch die Leitung und lassen Sie dabei etwa 0,5 m Kabel heraushängen. Befestigen Sie einen Metall--Anschlussstutzen am Kabelrohrende. 5 Führen Sie das Kabelrohr durch den Verdrahtungszugang ein und befestigen Sie den Kabelrohr--Anschlussstutzen an der Platte. Isolieren jeden Eingangsdraht 1,5 cm ab. 6 Schließen Sie die Eingangs-- und Erdungskabel gemäß den USV--Verdrahtungsspezifikationen der folgenden Tabelle an die Klemmenabdeckung an. Leiterfunktion Position der Klemmen USV-Kabelfunktion 1 Eingangserde 2 L2/Neutral Ein 3 L1 Ein Eingang Nenngröße des An schlussleiters* Anzugsmoment 16â35 mm2 (8--2 American Wire Gauge) 1,7 Nm (15 lb--in) * Mindestanforderung: S 8 AWG als Geräte--Erdungsdraht, Kupferdraht min. 75_C verwenden S 4 AWG als Netz-- und Nullleiterdraht, Kupferdraht min. 75_C verwenden 7 Bringen Sie die Klemmenabdeckung wieder an. Installation und Inbetriebnahme | 75 Starten der USV Ein/Aus-Schalter Inbetriebnahme der USV: 1 Stellen Sie sicher, dass die internen Akkus angeschlossen sind. 2 Sollte ein optionales EBM installiert sein, stellen Sie sicher, dass es an die USV angeschlossen ist. Weitere Informationen finden Sie in der Erste Schritte mit dem Dell Online Rack EBM 10 kW. 3 Prüfen Sie nach, ob alle Lastsegment--Überlastschalter eingeschaltet sind (ON). 4 Schalten Sie den Netzstromschalter ein. Das LCD--Display der USV leuchtet auf. Der Dell--Startbildschirm wechselt zum Statusübersichtsbildschirm der USV. Die Display--Anzeige auf der Vorderseite der USV zeigt das an. blinkende Standby--Symbol 5 Drücken Sie den Ein--/Ausschalter auf der Frontplatte. Nach Abschluss des Hochfahrens wechselt der Status je nach Betriebsmodus der USV. 76 | Installation und Inbetriebnahme 6 Wählen Sie auf dem Bildschirm mit der USV--Statusübersicht die Schaltfläche , um zu prüfen, ob eine aktive Warnmeldung oder ein aktiver Hinweis vorliegt. Beheben Sie alle aktiven Warnmeldungen, bevor Sie den Vorgang fortsetzen. Siehe âFehlerbehebungâ in der Benutzeranleitung für die Dell Online--Rack--USV 10 kW. Falls keine Warnmeldungen aktiv sind, wird die Meldung âKeine aktiven Warnmeldungenâ angezeigt. 7 Vergewissern Sie sich, dass das Symbol für âNormalâ auf dem Bildschirm mit der USV--Statusübersicht angezeigt wird. Hierdurch wird angezeigt, dass die USV ordnungsgemäß funktioniert und alle angeschlossenen Lasten mit Strom versorgt werden. 8 In der Benutzeranleitung für die Dell Online--Rack--USV 10 kW stehen Informationen zu Folgendem: S Konfigurationsabläufe, wenn ein optionales erweitertes Akkumodul (EBM) installiert wurde S Einstellen von Datum und Uhrzeit und Ändern anderer werkseitig eingestellter Standardwerte 9 Im Falle der Installation eines optionalen REPO muss der REPO--Betrieb getestet werden: Externen REPO--Schalter aktivieren. Den Statuswechsel auf dem Display der USV überprüfen. Den externen REPO--Schalter deaktivieren und die USV neu starten. 10 Laden Sie die Akkus. HINWEIS: Die internen Akkus laden sich in weniger als drei Stunden auf bis zu 90 % Kapazität auf. Allerdings müssen Sie die Akkus nach der Installation oder nachdem das Gerät längere Zeit nicht in Gebrauch war, 48 Stunden lang aufladen. ACHTUNG: Schließen Sie als Überladungsschutz für die USV jeweils eine Last an und vergewissern Sie sich, dass jedes geschützte Gerät vollständig hochgefahren wurde, bevor Sie die nächste Last anschließen. HINWEIS: Dell empfiehlt das Einstellen von Datum und Uhrzeit zur Fehlerbehebung oder aus Garantiegründen. Installation und Inbetriebnahme | 77 HINWEIS: Beim ersten Starten stellt die USV die Systemfrequenz in Übereinstimmung mit der Eingangsleitungsfrequenz ein (die automatische Messung der Eingangsfrequenz ist standardmäßig aktiviert). Nach dem ersten Starten wird die automatische Messung deaktiviert, bis Sie diese manuell aktivieren, indem Sie die Ausgangsfrequenzeinstellung verwenden. HINWEIS: Beim ersten Starten ist die automatische Messung der Eingangsspannung standardmäßig aktiviert. Danach wird nach dem Hochfahren die automatische Messung deaktiviert, bis Sie diese manuell aktivieren, indem Sie die Ausgangsspannungseinstellung verwenden. Identifizieren der rückwärtigen Anschlussleisten der USV In diesem Abschnitt sind die rückseitigen Anschlussleisten der drei Dell Online--Rack 10 kW USV--Modelloptionen dargestellt. 10 kW 208V USV (DELL10KWOLHVUS) Kommunikationsschacht der USV RS-232- USBAnschluss Anschluss Eine NEMA L6-30R- Zwei IEC 320-C19Anschlussbuchsen Anschlussbuchse Zwei Ausgangsüberlastschalter Lastsegment 1 (LS1) 78 | Installation und Inbetriebnahme REPOSchnittstellen EBM-Anschluss Eine NEMA L6-30RAnschlussbuchse Zwei IEC 320-C19Anschlussbuchsen Zwei Ausgangsüberlastschalter Lastsegment 2 (LS2) Erdungsschraube Eingangsklemmen 10 kW 230V USV (DELL10KWOLHV) Kommunikationsschacht der USV RS-232- USBAnschluss Anschluss Erdungsschraube REPO-Schnittstellen EBM-Anschluss Zwei Ausgangsüber lastschalter Zwei IEC 320-C19Steckdosen Ein AusgangsüberEine IEC 60309 332R6S-Steckdose lastschalter Lastsegment 1 (LS1) Eine IEC 60309 332R6S-Steckdose Eingangsklemmen Lastsegment 2 (LS2) Installation und Inbetriebnahme | 79 10 kW 230V USV (DELL10KWOLHVB) Kommunikationsschacht der USV RS-232USB- REPOAnschluss Anschluss Schnittstellen Erdungsschraube EBM-Anschluss Zwei Ausgangsüberlastschalter Vier IEC 320-C19Vier IEC 320-C19- Zwei Anschlussdosen Ausgangsüberlastschalter Anschlussdosen Lastsegment 1 (LS1) 80 | Installation und Inbetriebnahme Lastsegment 2 (LS2) Eingangsklemmen ÐМлайМПвÑй ÐÐÐ Dellt ÑÑÑаМавлОваеЌÑй в ÑÑПйке 10 kW ÐаÑалП ÑабПÑÑ c ÑОÑÑеЌПй DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com ÐÑОЌеÑÐ°ÐœÐžÑ Ðž пÑеЎÑпÑÐµÐ¶ÐŽÐµÐœÐžÑ ÐÐ ÐÐÐЧÐÐÐÐ: ÐПЌеÑка «ÐÐ ÐÐÐЧÐÐÐл ÑказÑÐ²Ð°ÐµÑ ÐœÐ° важМÑÑ ÐžÐœÑПÑЌаÑОÑ, кПÑПÑÐ°Ñ Ð¿ÐŸÐŒÐŸÐ¶ÐµÑ Ð¿ÐŸÐ»ÑзПваÑÐµÐ»Ñ Ð±ÐŸÐ»ÐµÐµ ÑÑÑекÑОвМП ОÑпПлÑзПваÑÑ Ð¿ÑПгÑаЌЌМПе ПбеÑпеÑеМОе. ÐÐÐСÐÐ: ÐПЌеÑка «ÐÐÐСÐÐСТЬ» ÑказÑÐ²Ð°ÐµÑ ÐœÐ° ÑОÑÑаÑОО, ÑÑеваÑÑе МепПÑÑеЎÑÑвеММПй ÑгÑПзПй, кПÑПÑаÑ, Ме бÑÐŽÑÑО МейÑÑалОзПваММПй, ÐŒÐŸÐ¶ÐµÑ Ð¿ÑОвеÑÑО к ÑеÑÑезМПй ÑÑавЌе, в Ñ.Ñ. Ñ Ð»ÐµÑалÑМÑÐŒ ОÑÑ ÐŸÐŽÐŸÐŒ. ÐÐ ÐÐУÐÐ ÐÐÐÐÐÐÐ: ÐПЌеÑка «ÐÐ ÐÐУÐÐ ÐÐÐÐÐÐл ÑказÑÐ²Ð°ÐµÑ ÐœÐ° пПÑеМÑОалÑМП ПпаÑМÑÑ ÑОÑÑаÑОÑ, кПÑПÑаÑ, Ме бÑÐŽÑÑО МейÑÑалОзПваММПй, ÐŒÐŸÐ¶ÐµÑ Ð¿ÑОвеÑÑО к ÑÑавЌе, в Ñ.Ñ. Ñ Ð»ÐµÑалÑМÑÐŒ ОÑÑ ÐŸÐŽÐŸÐŒ. ÐÐÐÐÐÐÐÐ: ÐПЌеÑка «ÐÐÐÐÐÐÐл ÑказÑÐ²Ð°ÐµÑ ÐœÐ° пПÑеМÑОалÑМП ПпаÑМÑÑ ÑОÑÑаÑОÑ, кПÑПÑаÑ, Ме бÑÐŽÑÑО МейÑÑалОзПваММПй, ÐŒÐŸÐ¶ÐµÑ Ð¿ÑОвеÑÑО к ÑÑавЌаЌ легкПй О ÑÑеЎМей ÑÑепеМО ÑÑжеÑÑО ОлО к пПвÑÐµÐ¶ÐŽÐµÐœÐžÑ ÐžÐŒÑÑеÑÑва. ÐÐÐСÐÐ: СлеЎÑйÑе пÑОвеЎеММÑÐŒ МОже ОМÑÑÑÑкÑОÑÐŒ, пПзвПлÑÑÑОЌ пÑеЎÑпÑеЎОÑÑ ÐœÐµÐ¿ÐŸÑÑеЎÑÑвеММÑÑ ÑгÑПзÑ, кПÑПÑаÑ, Ме бÑÐŽÑÑО МейÑÑалОзПваММПй, ÐŒÐŸÐ¶ÐµÑ Ð¿ÑОвеÑÑО к ÑеÑÑезМПй ÑÑавЌе, в Ñ.Ñ. Ñ Ð»ÐµÑалÑМÑÐŒ ОÑÑ ÐŸÐŽÐŸÐŒ: S Ð ÑÑÑÑПйÑÑве ÐÐРМекПÑПÑÑе ÑÐ·Ð»Ñ ÐœÐ°Ñ ÐŸÐŽÑÑÑÑ Ð¿ÐŸÐŽ СÐÐРТÐÐЬÐÐ ÐÐÐСÐЫРÐÐÐРЯÐÐÐÐÐÐ. ÐÑе ÑабПÑÑ Ð¿ÐŸ ÑеЌПМÑÑ Ðž ПбÑлÑÐ¶ÐžÐ²Ð°ÐœÐžÑ ÐŽÐŸÐ»Ð¶ÐœÑ Ð²ÑпПлМÑÑÑÑÑ Ð¢ÐÐЬÐРУÐÐÐÐÐÐÐЧÐÐÐЫРÐÐСÐУÐÐÐÐЮЩÐÐ ÐÐРСÐÐÐÐÐÐ. Ð ÐÐРОлО ÐÐÐ ÐÐТ УÐÐÐÐ, ÐÐСÐУÐÐÐÐÐÐЫХ ÐÐÐЬÐÐÐÐТÐÐÐÐ. ÐМÑПÑЌаÑÐžÑ Ð² МаÑÑПÑÑеЌ ЎПкÑЌеМÑе ÐŒÐŸÐ¶ÐµÑ Ð±ÑÑÑ ÐžÐ·ÐŒÐµÐœÐµÐœÐ° без пÑеЎваÑОÑелÑМПгП ÑвеЎПЌлеМОÑ. E 2012 г., Dell Inc. ÐÑе пÑава заÑОÑеМÑ. ÐПÑпÑПОзвеЎеМОе ЎаММПгП ЎПкÑЌеМÑа лÑбÑÐŒ ÑпПÑПбПЌ без пОÑÑЌеММПгП ÑазÑеÑÐµÐœÐžÑ ÐºÐŸÐŒÐ¿Ð°ÐœÐžÐž Dell Inc. каÑегПÑОÑеÑкО запÑеÑеМП. ТПваÑМÑе зМакО, ОÑпПлÑзÑеЌÑе в ЎаММПЌ ÑекÑÑе: Dell О лПгПÑОп DELL lÑвлÑÑÑÑÑ ÑПваÑМÑЌО зМакаЌО кПЌпаМОО Dell Inc. ÐаОЌеМПваМОе ENERGY STAR ÑвлÑеÑÑÑ Ð·Ð°ÑегОÑÑÑОÑПваММÑÐŒ ÑПваÑМÑÐŒ зМакПЌ ÐгеМÑÑÑва заÑОÑÑ ÐŸÐºÑÑжаÑÑей ÑÑÐµÐŽÑ Ð¡ÐšÐ. ÐÑÑалÑМÑе ÑПваÑМÑе зМакО О ÑПÑгПвÑе ЌаÑкО ЌПгÑÑ ÐžÑпПлÑзПваÑÑÑÑ Ð² ÑÑПЌ ÑÑкПвПЎÑÑве ÐŽÐ»Ñ ÐŸÐ±ÐŸÐ·ÐœÐ°ÑÐµÐœÐžÑ ÑОÑÐŒ, заÑвлÑÑÑÐžÑ ÑвПО пÑава Ма ÑПваÑМÑе зМакО О МазваМОÑ, ОлО пÑПЎÑкÑПв ÑÑÐžÑ ÑОÑÐŒ. ÐÐŸÐŒÐ¿Ð°ÐœÐžÑ Dell Inc. ПÑказÑваеÑÑÑ ÐŸÑ Ð»ÑбПгП пÑава ÑПбÑÑвеММПÑÑО Ма какОе-лОбП ÑПваÑМÑе зМакО ОлО кПЌЌеÑÑеÑкОе МазваМОÑ, кÑПЌе ÑÐ²ÐŸÐžÑ ÑПбÑÑвеММÑÑ . ÐекабÑÑ 2012 ЀÑМкÑОО ÑОÑÑÐµÐŒÑ Ð£ÐœÐžÐºÐ°Ð»ÑМÑе пÑеОЌÑÑеÑÑва, ПбеÑпеÑОваÑÑОе ОÑклÑÑОÑелÑМÑÑ ÑÑÑекÑОвМПÑÑÑ Ðž МаЎежМПÑÑÑ ÐÐÐ: S ÐМлайМ ÐÐÐ Ñ ÑОÑÑПй ÑОМÑÑПОЎПй Ма вÑÑ ÐŸÐŽÐµ. S Ð¢ÐµÑ ÐœÐŸÐ»ÐŸÐ³ÐžÑ ÐŽÐ²ÐŸÐ¹ÐœÐŸÐ³ÐŸ пÑеПбÑÐ°Ð·ÐŸÐ²Ð°ÐœÐžÑ Ñ Ð²ÑÑПкПй ÑЎелÑМПй ЌПÑМПÑÑÑÑ, МезавОÑОЌПй ÐŸÑ ÑеÑО ÑаÑÑПÑПй пОÑÐ°ÐœÐžÑ Ðž вПзЌПжМПÑÑÑÑ ÑПвЌеÑÑМПй ÑабПÑÑ Ñ Ð³ÐµÐœÐµÑаÑПÑПЌ. S ÐПМОжаÑÑÐ°Ñ Ðž пПвÑÑаÑÑÐ°Ñ ÑегÑлОÑПвка МапÑÑÐ¶ÐµÐœÐžÑ ÐŸÐ±ÐµÑпеÑÐžÐ²Ð°ÐµÑ Ð¿ÐŸÐŽÐ°ÑÑ ÑÑабОлÑМПгП S S S S S S S S S S S S S S S S МапÑÑÐ¶ÐµÐœÐžÑ ÐœÐ° МагÑÑÐ·ÐºÑ Ð¿ÑÑеЌ кПÑÑекÑОО кПлебаМОй МапÑÑжеМОÑ. ÐÐÐ ÑОлÑÑÑÑÐµÑ Ð²Ñ ÐŸÐŽÐœÐŸÐ¹ пеÑеЌеММÑй ÑПк, кПМÑÑПлОÑÑÐµÑ ÐµÐ³ÐŸ паÑаЌеÑÑÑ Ðž ПбеÑпеÑÐžÐ²Ð°ÐµÑ ÑÑабОлÑМПе пОÑаМОе ПбПÑÑЎПваМОÑ, Ме ÑазÑÑÐ¶Ð°Ñ Ð±Ð°ÑаÑеÑ. ÐÑбОÑаеЌÑй пПлÑзПваÑелеЌ ÑежОЌ вÑÑПкПй ÑÑÑекÑОвМПÑÑО. ÐÑÑПÑа СÐÐ 5U . ЀÑМкÑÐžÑ Ð·Ð°Ð¿ÑÑка ÐŸÑ Ð±Ð°ÑаÑеО ОÑпПлÑзÑеÑÑÑ ÐŽÐ»Ñ Ð¿ÐžÑÐ°ÐœÐžÑ ÐÐРЎаже пÑО ПÑÑÑÑÑÑвОО пОÑÐ°ÐœÐžÑ ÐŸÑ ÑлекÑÑПÑеÑО. ÐПзЌПжМПÑÑÑ Ð±ÐµÐ·ÐŸÐ¿Ð°ÑМПй Ð·Ð°ÐŒÐµÐœÑ Ð°ÐºÐºÑÐŒÑлÑÑПÑПв без ПÑклÑÑÐµÐœÐžÑ ÐÐÐ ÐŸÑ ÑеÑО ÑпÑПÑÐ°ÐµÑ Ð¿ÑПÑеЎÑÑÑ ÑÐµÑ ÐœÐžÑеÑкПгП ПбÑлÑжОваМОÑ. СеÑвОÑÐœÐ°Ñ ÐžÐœÑПÑЌаÑÐžÑ Dell вÑвПЎОÑÑÑ ÐœÐ° ÐÐ-ЎОÑплей пеÑеЎМей паМелО. ÐлОÑелÑМПе вÑÐµÐŒÑ ÑабПÑÑ Ñ ÐŽÐŸÐ¿ÐŸÐ»ÐœÐžÑелÑМÑÐŒ ЌПЎÑлеЌ External Battery Module (EBM). УпÑавлеМОе аваÑОйМÑÐŒ вÑклÑÑеМОеЌ ÑеÑез пПÑÑÑ ÐŽÐžÑÑаМÑОПММПгП аваÑОйМПгП вÑклÑÑÐµÐœÐžÑ Ð¿ÐžÑÐ°ÐœÐžÑ (REPO). Ðва ÑÑаМЎаÑÑМÑÑ ÐºÐŸÐŒÐŒÑМОкаÑОПММÑÑ Ð¿ÐŸÑÑПв (USB О пПÑлеЎПваÑелÑМÑй пПÑÑ RS-232). ÐПпПлМОÑелÑÐœÐ°Ñ ÐºÐ°ÑÑа Dell Network Management Card (Ñакже ОзвеÑÑÐœÐ°Ñ ÐºÐ°Ðº NMC) Ñ ÑÑПвеÑÑеМÑÑвПваММÑЌО кПЌЌÑМОкаÑОПММÑЌО вПзЌПжМПÑÑÑЌО ÑлÑÑÑÐ°ÐµÑ Ð·Ð°ÑОÑÑ Ð¿ÐŸ пОÑÐ°ÐœÐžÑ Ðž егП ЌПМОÑПÑОМг. ÐпÑОПМалÑМÑй Powerware Environmental Monitoring Probe (EMP) ÐŽÐ»Ñ ÑбПÑа ОМÑПÑЌаÑОО П ÑеЌпеÑаÑÑÑе О влажМПÑÑО в ÑÐ°ÐŒÐºÐ°Ñ ÑЎалеММПгП ЌПМОÑПÑОМга ПкÑÑжаÑÑей ÑÑÐµÐŽÑ Ðž ÑкПлПгОО. ÐÑ ÐŒÐŸÐ¶ÐµÑе Ñакже пПлÑÑаÑÑ ÐžÐœÑПÑЌаÑÐžÑ ÐŸ ÑÑаÑÑÑе ЎвÑÑ , пÑеЎПÑÑавлеММÑÑ Ð¿ÐŸÐ»ÑзПваÑелеЌ, кПМÑакÑМÑÑ ÑÑÑÑПйÑÑÐ²Ð°Ñ . УÑПвеÑÑеМÑÑвПваММПе ÑпÑавлеМОе пОÑаМОеЌ пÑО пПЌПÑО ÐÐDellt Multi-UPS Management Console (MUMC) and Dellt UPS Local Node Manager (ULNM) ПбеÑпеÑÐžÐ²Ð°ÐµÑ ÐœÐ°ÐŽÐ»ÐµÐ¶Ð°Ñее вÑклÑÑеМОе МагÑÑзкО О ЌПМОÑПÑОМг ÑлекÑÑПпОÑаМОÑ. ÐПÑлеЎПваÑелÑМПе вÑклÑÑеМОе О ÑпÑавлеМОе МагÑÑзкПй пÑО пПЌПÑО ÑазЎелÑМÑÑ Ð³ÑÑпп ÑазÑеЌПв, МазÑваеЌÑÑ ÑегЌеМÑаЌО МагÑÑзкО. ÐегкП ПбМПвлÑеЌПе вÑÑÑПеММПе ÐÐ: ÐŽÐ»Ñ ÐµÐ³ÐŸ ÐŸÐ±ÐœÐŸÐ²Ð»ÐµÐœÐžÑ ÐœÐµÑ ÐœÐµÐŸÐ±Ñ ÐŸÐŽÐžÐŒÐŸÑÑО ПбÑаÑаÑÑÑÑ Ð² ÑлÑÐ¶Ð±Ñ ÑÐµÑ ÐœÐžÑеÑкПй пПЎЎеÑжкО. ÐЌееÑÑÑ Ð°ÑÑеÑÑаÑÐžÑ ÐŒÐµÐ¶ÐŽÑМаÑПЎМÑÑ ÐŸÑгаМОзаÑОй. ÐÐÐ ÑеÑÑОÑОÑОÑПваММÑе ENERGY STAR®. ЀÑМкÑОО ÑОÑÑÐµÐŒÑ | 83 ÐПлÑÑеМОе ОМÑПÑЌаÑОО ÐÐÐÐÐÐÐÐ! ÐПкÑÐŒÐµÐœÑ ÐМÑПÑЌаÑÐžÑ ÐŸ ÑÐµÑ ÐœÐžÐºÐµ безПпаÑМПÑÑО, ÐŸÑ ÑаМе ПкÑÑжаÑÑей ÑÑÐµÐŽÑ Ðž МПÑЌаÑÐžÐ²ÐœÐ°Ñ ÐžÐœÑПÑЌаÑÐžÑ ÑПЎеÑÐ¶ÐžÑ Ð²Ð°Ð¶ÐœÑе ЎаММÑе пП безПпаÑМПÑÑО. ЧÑП Ð²Ñ ÐžÑОÑе? S Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐŽÐ»Ñ ÐŒÐŸÐµÐ³ÐŸ ÐÐÐ ÐайЎОÑе зЎеÑÑ ÐОÑк ÐÐÐ Dell S Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐŽÐ»Ñ Dell Network Management Card S Dell MUMC and Dell ULNM Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐÐ ÐÐÐЧÐÐÐÐ: ÐПкÑЌеМÑаÑÐžÑ Ðž ÐŸÐ±ÐœÐŸÐ²Ð»ÐµÐœÐžÑ Ð¿ÑПгÑаЌЌМПгП ПбеÑпеÑÐµÐœÐžÑ ÐŒÐŸÐ¶ÐœÐŸ МайÑО пП аЎÑеÑÑ www.support.dell.com О www.dellups.com. S УÑПÑÐœÐµÐœÐžÑ Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐÐÐ Dell S Ðак заЎаваÑÑ ÐœÐ°ÑÑÑПйкО ÐÐÐ Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐŽÐŸÑÑÑпМП Ма ЎОÑке ÐÐÐ S ÐПОÑк О ÑÑÑÑаМеМОе МеОÑпÑавМПÑÑей О ÑазÑеÑеМОе Dell О Ма www.support.dell.com. пÑПблеЌ S Ðак ÑÑÑаМПвОÑÑ ÑпÑавлеМОе пПÑÑеЎÑÑвПЌ REPO S ÐМÑÑÑÑкÑОО пП ÑÐµÑ ÐœÐžÐºÐµ безПпаÑМПÑÑО S ÐПÑЌаÑОвМÑе ЎПкÑЌеМÑÑ S ÐМÑПÑЌаÑÐžÑ ÐŸÐ± ÑÑОлОзаÑОО S ÐМÑПÑЌаÑÐžÑ ÐŸ гаÑаМÑОО ÐМÑПÑЌаÑÐžÑ Ð¿ÐŸ ÑÐµÑ ÐœÐžÐºÐµ безПпаÑМПÑÑО, ÑПблÑЎе ÐœÐžÑ ÑÑебПваМОй ÐŸÑ ÑÐ°ÐœÑ ÐŸÐºÑÑжаÑÑей ÑÑÐµÐŽÑ Ðž МПÑЌаÑОвМÑе ÑÐ²ÐµÐŽÐµÐœÐžÑ ÐМÑПÑЌаÑÐžÑ ÐŸ гаÑаМÑОО О пПЎЎеÑжке Dell S ÐПÑÑÐ°ÐœÐŸÐ²Ð»ÐµÐœÐžÑ Ðž ÑÑÐ»ÐŸÐ²ÐžÑ (ÑПлÑкП ÐŽÐ»Ñ Ð¡ÐšÐ) S лОÑеМзОПММПе ÑПглаÑеМОе ÐŽÐ»Ñ ÐºÐŸÐœÐµÑМПгП пПлÑзПваÑÐµÐ»Ñ S ÐМÑПÑЌаÑÐžÑ ÐŸ пПЎЎеÑжке Ð¡Ð°Ð¹Ñ Ð¿ÐŸÐŽÐŽÐµÑжкО Dell Ä www.support.dell.com ÐÐ ÐÐÐЧÐÐÐÐ: ÐÑбеÑОÑе ÑвПй ÑегОПМ ОлО ÑÐµÐ³ÐŒÐµÐœÑ Ð±ÐžÐ·ÐœÐµÑа ÐŽÐ»Ñ ÐŸÑПбÑÐ°Ð¶ÐµÐœÐžÑ ÑППÑвеÑÑÑвÑÑÑегП ÑайÑа пПЎЎеÑжкО. 84 | ÐПлÑÑеМОе ОМÑПÑЌаÑОО УÑÑаМПвка О запÑÑк ÐÐÐÐÐÐÐÐ! ÐеÑеЎ вÑпПлМеМОеЌ пÑПÑеЎÑÑÑ, ПпОÑаММПй в ЎаММПй ЎПкÑЌеМÑаÑОО, пÑПÑÑОÑе О вÑпПлМОÑе ОМÑÑÑÑкÑОО пП ÑÐµÑ ÐœÐžÐºÐµ безПпаÑМПÑÑО О ПзМакПЌÑÑеÑÑ Ñ Ð²Ð°Ð¶ÐœÑÐŒ МПÑЌаÑОвМÑÐŒ ЎПкÑЌеМÑПЌÐМÑПÑЌаÑÐžÑ ÐŸ ÑÐµÑ ÐœÐžÐºÐµ безПпаÑМПÑÑО, ÐŸÑ ÑаМе ПкÑÑжаÑÑей ÑÑÐµÐŽÑ Ðž МПÑЌаÑÐžÐ²ÐœÐ°Ñ ÐžÐœÑПÑЌаÑОÑ. ÐÐÐÐÐÐÐÐ! РаÑпакПвка кПÑпÑÑа пÑО МОзкПй ÑеЌпеÑаÑÑÑе ÐŒÐŸÐ¶ÐµÑ Ð¿ÑОвеÑÑО к кПМЎеМÑаÑОО влагО Ма вМÑÑÑÐµÐœÐœÐžÑ Ðž МаÑÑжМÑÑ Ð¿ÐŸÐ²ÐµÑÑ ÐœÐŸÑÑÑÑ ÐºÐŸÑпÑÑа. Ðе ÑÑÑаМавлОвайÑе кПÑпÑÑ ÐŽÐŸ пПлМПгП вÑÑÑÑ Ð°ÐœÐžÑ ÐµÐ³ÐŸ вМÑÑÑÐµÐœÐœÐžÑ Ðž МаÑÑжМÑÑ Ð¿ÐŸÐ²ÐµÑÑ ÐœÐŸÑÑей (вП ОзбежаМОе пПÑÐ°Ð¶ÐµÐœÐžÑ ÑлекÑÑОÑеÑкОЌ ÑПкПЌ). УÑÑаМПвка О запÑÑк | 85 ÐÐÐÐÐÐÐÐ! УÑÑаМПвка О ОзвлеÑеМОе баÑаÑей ЎПлжМП ПÑÑÑеÑÑвлÑÑÑÑÑ ÐžÐ»Ðž кПМÑÑПлОÑПваÑÑÑÑ Ð¿ÐµÑÑПМалПЌ, Ñ ÐŸÑПÑП зМаÑÑОЌ баÑаÑеО О ÑÑÐµÐ±ÐŸÐ²Ð°ÐœÐžÑ ÑÐµÑ ÐœÐžÐºÐž безПпаÑМПÑÑО. Ðе ЎПпÑÑкайÑе к аккÑÐŒÑлÑÑПÑМÑÐŒ баÑаÑеÑÐŒ пПÑÑПÑÐŸÐœÐœÐžÑ . ÐÐÐÐÐÐÐÐ! ÐПÑпÑÑ ÑÑжелÑй (99 кг/218 ÑÑМÑ): ÐеÑеЎ пПЎÑеЌПЌ кПÑпÑÑа вÑегЎа ОзвлекайÑе лПÑкО баÑаÑеО Оз ÐÐÐ. ÐÐ»Ñ Ð¿ÐŸÐŽÑеЌа кПÑпÑÑа в ÑÑÐŸÐ¹ÐºÑ ÑÑебÑеÑÑÑ ÐœÐµ ЌеМее ЎвÑÑ ÑелПвек. ÐÐÐÐÐÐÐÐ! ÐаÑаÑеО ÑÑжелÑе (32 кг/71 ÑÑМÑ). ÐÑавОлÑМП ОзвлекайÑе баÑаÑеО. ÐÐ ÐÐÐЧÐÐÐÐ. ÐÑПÑвлÑйÑе ПÑÑПÑПжМПÑÑÑ Ð¿ÑО пеÑеЌеÑеМОО О ПÑкÑÑÑОО ÑпакПвПÑМПй ÑаÑÑ. ÐÑÑавлÑйÑе ЎеÑалО в ÑпакПвке вплПÑÑ ÐŽÐŸ ЌПЌеМÑа ÑÑÑаМПвкО. РЎаММПЌ ÑазЎеле ПпОÑÑваÑÑÑÑ ÑÑÐ°Ð¿Ñ ÐœÐ°ÑÑÑПйкО ÑОÑÑеЌÑ, еÑлО МаÑÑПйка вÑпПлМÑеÑÑÑ Ð²Ð¿ÐµÑвÑе. РаÑпакПвка кПÑпÑÑа ÐÐ»Ñ ÑаÑпакПвкО ÑОÑÑеЌÑ: 1 ÐÑпПлÑзÑйÑе вОлПÑМÑй пПгÑÑзÑОк ОлО ÑÐŸÑ Ð»Ñ, пеÑеЌеÑÑОÑе кПÑÐŸÐ±ÐºÑ Ðž пПЎЎПМ к ÑÑПйке, Ма кПÑПÑÑÑ Ð²Ñ Ð±ÑЎеÑе ÑÑÑаМавлОваÑÑ ÐÐÐ. 2 СМОЌОÑе О ÑЎалОÑе вМеÑМÑÑ ÑпакПвкÑ. 86 | УÑÑаМПвка О запÑÑк 3 ÐÑМÑÑе Ўва ÑÑОка Ñ Ð¿ÑОМаЎлежМПÑÑÑЌО, ÐœÐ°Ñ ÐŸÐŽÑÑОеÑÑ Ð² ÑелÑеÑМÑÑ ÐºÐ°ÐœÐ°Ð»Ð°Ñ Ð² веÑÑ ÐœÐµÐ¹ ÑаÑÑО пеМПплаÑÑа. 4 ÐÑкÑПйÑе ÑÑОкО Ñ Ð¿ÑОМаЎлежМПÑÑÑЌО О ÑÑÑаМПвОÑе ÐžÑ ÐœÐ° ÑПвМÑÑ ÑÑÑПйÑОвÑÑ Ð¿ÐŸÐ²ÐµÑÑ ÐœÐŸÑÑÑ ÐœÐµÐ¿ÐŸÐŽÐ°Ð»ÐµÐºÑ. ÐÐ ÐÐÐЧÐÐÐÐ. Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐŸÐœÐ»Ð°Ð¹ÐœÐŸÐ²ÐŸÐ³ÐŸ 10 кÐÑ ÐÐÐ Dell пÑО ÑÑÑаМПвке в ÑÑПйке пÑеЎПÑÑавлÑÐµÑ ÐžÐœÑПÑЌаÑÐžÑ Ð¿ÐŸ ÑаÑпакПвке О ÑÑÑаМПвке. ÐПÑÑаМÑÑе егП Оз ÑÑОка Ñ Ð¿ÑОМаЎлежМПÑÑÑЌО. 5 СМОЌОÑе веÑÑ ÐœÑÑ ÑаÑÑÑ Ð¿ÐµÐœÐŸÐ¿Ð»Ð°ÑÑа О ÑÑÑаМПвОÑе егП Ма ÑПвМÑÑ ÑÑÑПйÑОвÑÑ Ð¿ÐŸÐ²ÐµÑÑ ÐœÐŸÑÑÑ ÐœÐµÐ¿ÐŸÐŽÐ°Ð»ÐµÐºÑ. УÑÑаМПвка О запÑÑк | 87 ÐÐ ÐÐÐЧÐÐÐÐ. ÐбПзМаÑÐµÐœÐžÑ L (ÐевП) О R (ÐÑавП) Ма кÑепежМÑÑ ÐºÐŸÐœÑейМеÑÐ°Ñ ÑказÑваÑÑ ÐœÐ° ÑП, гЎе ПМО ÐŽÐŸÐ»Ð¶ÐœÑ Ð±ÑÑÑ ÑÑÑаМПвлеМÑ. 6 СМОЌОÑе кÑПМÑÑÐµÐ¹ÐœÑ ÐºÑÐµÐ¿Ð»ÐµÐœÐžÑ Ð±Ð°ÑаÑеО Ñ ÐÐÐ: ÐайЎОÑе левÑй (пПЌеÑеМ бÑквПйL) кÑПМÑÑейМ кÑеплеМОÑ. Ðа левПй ÑÑПÑПМе кПÑпÑÑа пПвеÑМОÑе вОМÑ-баÑаÑек пÑПÑОв ÑаÑПвПй ÑÑÑелкО, ÑÑÐŸÐ±Ñ ÐŸÑвПбПЎОÑÑ Ð»ÐµÐ²Ñй кÑПМÑÑейМ кÑеплеМОÑ. ÐÑПЎвОМÑÑе кÑПМÑÑейМ к ÑеМÑÑалÑМПй ÑÑПйке, ÑÑÐŸÐ±Ñ ÐŸÑвПбПЎОÑÑ ÐµÐ³ÐŸ Оз кПÑпÑÑа. ÐПвеÑМОÑе кÑПМÑÑейМ кÑÐµÐ¿Ð»ÐµÐœÐžÑ Ðº Ñебе О пПÑÑМОÑе егП влевП, ÑÑÐŸÐ±Ñ ÑбÑаÑÑ ÐµÐ³ÐŸ. УбеÑОÑе кÑПМÑÑейМ кÑÐµÐ¿Ð»ÐµÐœÐžÑ Ð² ÑÑПÑПМÑ. ÐайЎОÑе пÑавÑй (ПбПзМаÑеММÑй бÑквПй R) кÑПМÑÑейМ кÑеплеМОÑ. Ðа пÑавПй ÑÑПÑПМе кПÑпÑÑа пПвеÑМОÑе вОМÑ-баÑаÑек пÑПÑОв ÑаÑПвПй ÑÑÑелкО, ÑÑÐŸÐ±Ñ ÐŸÑвПбПЎОÑÑ Ð¿ÑавÑй кÑПМÑÑейМ кÑеплеМОÑ. ÐÑПЎвОМÑÑе кÑПМÑÑейМ к ÑеМÑÑалÑМПй ÑÑПйке, ÑÑÐŸÐ±Ñ ÐŸÑвПбПЎОÑÑ ÐµÐ³ÐŸ Оз кПÑпÑÑа. ÐПвеÑМОÑе кÑПМÑÑейМ кÑÐµÐ¿Ð»ÐµÐœÐžÑ Ðº Ñебе О пПÑÑМОÑе егП впÑавП, ÑÑÐŸÐ±Ñ ÑбÑаÑÑ ÐµÐ³ÐŸ. УбеÑОÑе кÑПМÑÑейМ кÑÐµÐ¿Ð»ÐµÐœÐžÑ Ð² ÑÑПÑПМÑ. 7 УбеЎОÑеÑÑ, ÑÑП вÑе ÑазÑÐµÐŒÑ Ð±Ð°ÑаÑеО ПÑклÑÑеМÑ. 88 | УÑÑаМПвка О запÑÑк ÐÐÐÐÐÐÐÐ! ÐаÑаÑеО ÑÑжелÑе (32 кг/71 ÑÑМÑ). ÐÑавОлÑМП ОзвлекайÑе баÑаÑеО. 8 ÐзвлекОÑе кПÑÐŸÐ±ÐºÑ Ñ Ð±Ð°ÑаÑеÑЌО Оз ÐÐÐ: ÐÑÑПеЎОМОÑе ÑазÑÐµÐŒÑ Ð±Ð°ÑаÑеО ÐÐРО пПЌеÑÑОÑе ÐžÑ ÐœÐ° баÑаÑейМÑй ПÑÑек, ÑÑÐŸÐ±Ñ ÐŸÐœÐž Ме ЌеÑалО. ÐПзÑЌОÑеÑÑ Ð·Ð° Ўва плаÑÑОкПвÑÑ Ð¿ÐµÑлевÑÑ ÑÑка Ма пеÑеЎМей паМелО баÑаÑеО. ÐПÑÑМОÑе лПÑПк Ма ÑебÑ, ÑÑÐŸÐ±Ñ ÐŸÑвПбПЎОÑÑ ÐµÐ³ÐŸ. ÐÐ ÐÐÐЧÐÐÐÐ. ÐÑÐ°ÐœÐ¶ÐµÐ²Ð°Ñ ÐŒÐµÑка ÐÐТЯÐУТЬ ÐÐÐСЬ ÑказÑваеÑ, гЎе МÑжМП взÑÑÑÑÑ Ð·Ð° пеÑлевÑе ÑÑкО. УÑÑаМПвОÑе баÑаÑейМÑй ПÑÑек Ма ÑÑаÑÑке пеМПплаÑÑа, кПÑПÑÑй Ð²Ñ ÑМÑлО Ñ Ð²ÐµÑÑ ÐœÐµÐ¹ ÑаÑÑО ÐÐÐ. ÐПвÑПÑОÑе пÑПÑеЎÑÑÑ ÐŽÐ»Ñ Ð²ÑПÑПгП лПÑка баÑаÑеО. УÑÑаМПвка О запÑÑк | 89 ÐÐÐÐÐÐÐÐ! ÐПÑпÑÑ ÑÑжелÑй (46 кг/101 ÑÑМÑ), Ўаже еÑлО баÑаÑеО ÑМÑÑÑ. ÐÐ»Ñ ÐžÐ·Ð²Ð»ÐµÑÐµÐœÐžÑ ÐºÐŸÑпÑÑа Оз каÑÑПММПгП пПЎЎПМа ÐŽÐ»Ñ ÑÑаМÑпПÑÑОÑПвкО ÑÑебÑеÑÑÑ ÐœÐµ ЌеМее ЎвÑÑ ÑелПвек. 9 Ðва ÑелПвека (пП ÐŸÐŽÐœÐŸÐŒÑ ÑÐµÐ»ÐŸÐ²ÐµÐºÑ Ñ ÐºÐ°Ð¶ÐŽÐŸÐ¹ ÑÑПÑПМÑ) ÐŽÐŸÐ»Ð¶ÐœÑ ÐŸÑÑПÑПжМП вÑМÑÑÑ ÐºÐŸÑпÑÑ ÐžÐ· пеМПплаÑÑа за ÑÑÑкО Ма каÑÑПМе. 10 УÑÑаМПвОÑе кПÑпÑÑ ÐœÐ° ÑПвМÑÑ ÑÑÑПйÑОвÑÑ Ð¿ÐŸÐ²ÐµÑÑ ÐœÐŸÑÑÑ ÐœÐ° заÑОÑеММПй ÑеÑÑОÑПÑОО вПзле ÑÑПйкО, в кПÑПÑÑÑ Ð²Ñ ÑПбОÑаеÑеÑÑ ÐµÐ³ÐŸ ÑÑÑаМПвОÑÑ. ÐÐ ÐÐÐЧÐÐÐÐ. ÐПЌеÑÑОÑе в Ñ ÐŸÑПÑП пÑПвеÑÑОваеЌПе заÑОÑеММПе ЌеÑÑП, гЎе ПÑÑÑÑÑÑвÑÐµÑ Ð²Ð»Ð°Ð³Ð°, вПÑплаЌеМÑÑÑОеÑÑ Ð³Ð°Ð·Ñ Ðž кПÑÑПзОÑ. 90 | УÑÑаМПвка О запÑÑк ÐаÑÐžÐ°ÐœÑ ÑÑÑаМПвкО в ÑÑПйке ÐÐÐÐÐÐÐÐ! ÐПÑпÑÑ ÑÑжелÑй (99 кг/218 ÑÑМÑ). ÐÑегЎа вÑМОЌайÑе Оз ÐÐРПба лПÑка пеÑеЎ пПЎÑеЌПЌ кПÑпÑÑа О ÑÑÑаМПвкПй ÐÐРМа ÑÐ°Ð»Ð°Ð·ÐºÐ°Ñ Ð² ÑÑПйкÑ. ÐÐ»Ñ Ð¿ÐŸÐŽÑеЌа кПÑпÑÑПв Ма ÑÑÐŸÐ¹ÐºÑ ÑÑебÑеÑÑÑ ÐœÐµ ЌеМее ЎвÑÑ ÑелПвек. ÐÐÐÐÐÐÐÐ! УÑÑаМПвка ОлО ОзвлеÑеМОе баÑаÑей ЎПлжМП ПÑÑÑеÑÑвлÑÑÑÑÑ ÐžÐ»Ðž кПМÑÑПлОÑПваÑÑÑÑ Ð¿ÐµÑÑПМалПЌ, Ñ ÐŸÑПÑП зМаÑÑОЌ баÑаÑеО О ÑÑÐµÐ±ÐŸÐ²Ð°ÐœÐžÑ ÑÐµÑ ÐœÐžÐºÐž безПпаÑМПÑÑО. Ðе ЎПпÑÑкайÑе к аккÑÐŒÑлÑÑПÑМÑÐŒ баÑаÑеÑÐŒ пПÑÑПÑÐŸÐœÐœÐžÑ . ÐÐÐÐÐÐÐÐ! ÐаÑаÑеО ÑÑжелÑе (32 кг/71 ÑÑМÑ). ÐÑавОлÑМП ОзвлекайÑе баÑаÑеО. ÐÐÐÐÐÐÐÐ! ÐÑО ÑÑÑаМПвке ЎПпПлМОÑелÑМПгП EBM, EBM ЎПлжеМ бÑÑÑ ÑаÑпПлПжеМ пПЎ ÐÐРбез пÑПÑÑÑаМÑÑва ÐŒÐµÐ¶ÐŽÑ ÐÐРО EBM. ÐÑП ПбеÑпеÑÐžÐ²Ð°ÐµÑ Ð»ÑÑÑее ÑаÑпÑеЎелеМОе веÑа в ÑÑПйке, бПлее легкОй ЎПÑÑÑп к паМелО ÑпÑÐ°Ð²Ð»ÐµÐœÐžÑ ÐÐÐ, О бПлее легкПе ÑазЌеÑеМОе кабелÑМÑÑ ÑПеЎОМеМОй баÑаÑеО. ÐÑП Ñакже пПзвПлÑÐµÑ ÐžÐ·Ð±ÐµÐ¶Ð°ÑÑ ÐœÐ°ÑÑÐ¶ÐµÐœÐžÑ ÐŒÐµÐ¶ÐŽÑ ÐºÐ°Ð±ÐµÐ»ÐµÐŒ EBM О ÑПеЎОМеМОеЌ ÐÐÐ, а Ñакже вПзЌПжМПгП МаÑÑÑÐµÐœÐžÑ ÑПеЎОМеМОÑ. ÐÐ ÐÐУÐÐ ÐÐÐÐÐÐÐ. РПÑМПÑеМОО ÑОÑÑеЌ, ЌПМÑОÑÑеЌÑÑ ÐœÐ° ÑÑПйке: ÐÑО ÑÑÑаМПвке МеÑкПлÑÐºÐžÑ ÑОÑÑеЌ Ма ÑÑПйке завеÑÑОÑе вÑе ЎейÑÑÐ²ÐžÑ Ñ ÐŸÐŽÐœÐŸÐ¹ ÑОÑÑеЌПй, пеÑеЎ ÑеЌ как пÑОÑÑÑпОÑÑ Ðº ÑÑÑаМПвке ÑлеЎÑÑÑей. ÐÐ ÐÐÐЧÐÐÐÐ. ÐапÑавлÑÑÑОе ÐœÐµÐŸÐ±Ñ ÐŸÐŽÐžÐŒÑ ÐŽÐ»Ñ ÑÑÑаМПвкО кажЎПгП кПÑпÑÑа. ÐÐ ÐÐÐЧÐÐÐÐ. ÐПÑпÑÑ Ð¿ÐŸÑÑавлÑеÑÑÑ ÑП ÑМÑÑÑÐŒ гМезЎПЌ пеÑеЎМей кÑÑÑкО. ÐÐ ÐÐÐЧÐÐÐÐ. СлеЎÑÑÑОе ОМÑÑÑÑкÑОО ÑвлÑÑÑÑÑ ÐŸÐŽÐžÐœÐ°ÐºÐŸÐ²ÑЌО как ÐŽÐ»Ñ ÑÑПек Ñ ÐºÐ²Ð°ÐŽÑаÑМÑЌО ПÑвеÑÑÑОÑЌО, Ñак О ÐŽÐ»Ñ ÑÑПек Ñ ÐºÑÑглÑЌО ПÑвеÑÑÑОÑЌО без ÑезÑбÑ. ÐапÑавлÑÑÑОе Ð¿ÐŸÐŽÑ ÐŸÐŽÑÑ ÐŽÐ»Ñ ÐŸÐ±ÐŸÐžÑ Ð²ÐžÐŽÐŸÐ² ÑÑПек. ÐÐ»Ñ ÑÑÑаМПвкО ÐÐРМа МапÑавлÑÑÑОе: 1 УбеЎОÑеÑÑ, ÑÑП ÑлеЎÑÑÑее ÑазЌеÑеМП Ма ÑПвМÑÑ ÑÑÑПйÑОвÑÑ Ð¿ÐŸÐ²ÐµÑÑ ÐœÐŸÑÑÑ Ñ ÑÑПйкО, гЎе Ð²Ñ Ð±ÑЎеÑе ÑÑÑаМавлОваÑÑ ÐÐÐ: S кПÑпÑÑ S Ўва ÑÑОка Ñ Ð¿ÑОМаЎлежМПÑÑÑЌО ÐÐÐ S Ўва лПÑка (ÑПлÑкП ÐÐÐ) S Ўва кÑПМÑÑейМа кÑÐµÐ¿Ð»ÐµÐœÐžÑ (ÑПлÑкП ÐÐÐ) УÑÑаМПвка О запÑÑк | 91 УÑÑаМПвка МапÑавлÑÑÑÐžÑ 2 ÐПÑÑаМÑÑе ÑалазкО Оз ПÑÑека ÐŽÐ»Ñ ÑалазПк, ÑÑП в ÑÑОке Ñ Ð¿ÑОМаЎлежМПÑÑÑЌО. 3 ÐÑбеÑОÑе МаЎлежаÑОе ПÑвеÑÑÑÐžÑ Ð² МапÑавлÑÑÑÐžÑ ÐŽÐ»Ñ ÑазЌеÑÐµÐœÐžÑ ÐºÐŸÑпÑÑа в желаеЌПЌ ЌеÑÑе ÑÑПйкО. ÐайЎОÑе МапÑавлÑÑÑОе в МОжМей ÑаÑÑО Ð·ÐŸÐœÑ 5U, вÑЎелеММПй ÐŽÐ»Ñ ÐÐÐ. ÐÐÐÐÐÐÐÐ! ÐÑО ÑÑÑаМПвке ЎПпПлМОÑелÑМПгП EBM, ÑбеЎОÑеÑÑ, ÑÑП EBM ÑаÑпПлПжеМ ÑÑÐ°Ð·Ñ Ð¿ÐŸÐŽ ÐÐРбез пÑПÑÑÑаМÑÑва ÐŒÐµÐ¶ÐŽÑ ÐÐРО EBM. ÐÐ ÐÐÐЧÐÐÐÐ. ÐбÑаÑОÑе вМОЌаМОе Ма МаЎпОÑО Ма МапÑавлÑÑÑÐžÑ ÐŽÐ»Ñ Ð¿ÑавПй пеÑеЎМей (МаЎпОÑÑ RIGHT FRONT )) О ÐŽÐ»Ñ Ð»ÐµÐ²ÐŸÐ¹ пеÑеЎМей (МаЎпОÑÑ LEFT FRONT). ÐапÑавлÑÑÑОе ÐŽÐŸÐ»Ð¶ÐœÑ Ð±ÑÑÑ ÑÑÑÐ°ÐœÐŸÐ²Ð»ÐµÐœÑ ÐžÐŒÐµÐœÐœÐŸ ÑакОЌ ПбÑазПЌ. 4 УÑÑаМПвОÑе левÑÑ Ðž пÑавÑÑ ÑалазкО как пПказаМП Ма ÑОÑÑМке. ÐÑОкÑепОÑе левÑÑ Ðž пÑавÑÑ ÐœÐ°Ð¿ÑавлÑÑÑОе к ÑÑПйке: ÐаÑепОÑе заЎМОй ÐºÐŸÐœÐµÑ ÐœÐ°Ð¿ÑавлÑÑÑей ÑакОЌ ПбÑазПЌ, ÑÑÐŸÐ±Ñ ÐŸÐœ пПлМПÑÑÑÑ Ñел Ма ÑÐ»Ð°ÐœÐµÑ Ð²ÐµÑÑОкалÑМПй ÑÑПйкО, а заЌПк закÑÑлÑÑ ÑП ÑелÑкПЌ. ÐПÑÑМОÑе за МапÑавлÑÑÑОе Ñак, ÑÑÐŸÐ±Ñ ÐŸÐœÐž Ñлегка вÑÑÑÑпалО за пеÑеЎМÑÑ Ð¿Ð°ÐœÐµÐ»Ñ ÑÑПйкО. ÐаЎавОÑе Ма пеÑеЎМОй ÐºÐŸÐœÐµÑ ÐœÐ°Ð¿ÑавлÑÑÑей ÑакОЌ ПбÑазПЌ, ÑÑÐŸÐ±Ñ ÐŸÐœ пПлМПÑÑÑÑ Ñел Ма ÑÐ»Ð°ÐœÐµÑ Ð²ÐµÑÑОкалÑМПй ÑÑПйкО, а заЌПк закÑÑлÑÑ ÑП ÑелÑкПЌ. 92 | УÑÑаМПвка О запÑÑк УÑÑаМПвка О ÑОкÑаÑÐžÑ ÐºÐŸÑпÑÑа ÐÐÐÐÐÐÐÐ! ÐПÑпÑÑ ÑÑжелÑй (46 кг/101 ÑÑМÑ), Ўаже еÑлО баÑаÑеО ÑМÑÑÑ. ÐÐ»Ñ Ð¿ÐŸÐŽÑеЌа кПÑпÑÑа в ÑÑÐŸÐ¹ÐºÑ ÑÑебÑеÑÑÑ ÐœÐµ ЌеМее ЎвÑÑ ÑелПвек. 5 УÑÑаМПвОÑе кПÑпÑÑ ÐœÐ° МапÑавлÑÑÑОе О заЎвОМÑÑе в ÑÑПйкÑ. 6 ÐакÑепОÑе пеÑеЎМÑÑ ÑаÑÑÑ ÐºÐŸÑпÑÑа Ма ÑÑПйке пÑО пПЌПÑО ÑеÑÑÑÐµÑ Ð²ÐžÐœÑПв Ñ ÐœÐ°ÐºÐ°ÑаММПй гПлПвкПй Ма ЌПМÑажМÑÑ ÐºÑПМÑÑÐµÐ¹ÐœÐ°Ñ . ÐаÑÑМОÑе вОМÑÑ Ð¿ÐŸ ÑаÑПвПй ÑÑÑелке вÑÑÑМÑÑ, без ОÑпПлÑÐ·ÐŸÐ²Ð°ÐœÐžÑ ÑОлПвПгП ОМÑÑÑÑЌеМÑа. УÑÑаМПвка пПлПк ÐŽÐ»Ñ Ð±Ð°ÑаÑей 7 ÐайЎОÑе лПÑкО баÑаÑеО, кПÑПÑÑе Ð²Ñ Ð¿ÐŸÐ»ÐŸÐ¶ÐžÐ»Ðž вПзле ÑÑПйкО. УÑÑаМПвка О запÑÑк | 93 ÐÐÐÐÐÐÐÐ! ÐаÑаÑеО ÑÑжелÑе (32 кг/71 ÑÑМÑ). ÐÑавОлÑМП пПЎМОЌайÑе баÑаÑеО пÑО ÑÑÑаМПвке. ÐÐ ÐÐÐЧÐÐÐÐ. ÐПÑкО баÑаÑеО ЌПгÑÑ Ð±ÑÑÑ ÑÑÑÐ°ÐœÐŸÐ²Ð»ÐµÐœÑ Ð² лÑбПй Оз баÑаÑейМÑÑ ÐŸÑÑекПв. ÐÐ ÐÐÐЧÐÐÐÐ. ÐÑÑавÑÑе лПÑПк Ñак, ÑÑÐŸÐ±Ñ Ð¿ÑеЎÑпÑежЎаÑÑÐ°Ñ ÑÑÑелка ÑказÑвала ввеÑÑ . 8 УÑÑаМПвка пПлПк ÐŽÐ»Ñ Ð±Ð°ÑаÑей: ÐПЌеÑÑОÑе ÑазÑÐµÐŒÑ Ð±Ð°ÑаÑеО ÐÐРМа баÑаÑейМÑй ПÑÑек, ÑÑÐŸÐ±Ñ ÐŸÐœÐž Ме ЌеÑалО. ÐПлМПÑÑÑÑ Ð²ÐŽÐ²ÐžÐœÑÑе блПк баÑаÑеО в баÑаÑейМÑй ПÑÑек. ÐПвÑПÑОÑе пÑПÑеЎÑÑÑ ÐŽÐ»Ñ Ð²ÑПÑПгП лПÑка баÑаÑеО. 9 ÐапÑавÑÑе пеÑлевÑе ÑÑкО в плаÑÑОкПвÑй ÑÑкав Ма пеÑеЎМей паМелО кажЎПгП баÑаÑейМÑй ПÑÑека, ÑÑÐŸÐ±Ñ ÐŸÐœÐž ваЌ Ме ЌеÑалО. ÐПЎклÑÑеМОе ÑазÑеЌПв вМÑÑÑÐµÐœÐœÐžÑ Ð±Ð°ÑаÑей 10 ÐПЎклÑÑОÑе ÑазÑÐµÐŒÑ Ð²ÐœÑÑÑеММей баÑаÑеО: ÐПЎÑПеЎОМОÑе ЎалÑМОй левÑй ÑазÑеЌ лПÑка баÑаÑеО к ÑОкÑОÑÑÐµÐŒÐŸÐŒÑ ÑазÑÐµÐŒÑ ÐÐÐ. ÐПЎÑПеЎОМОÑе ЎалÑМОй пÑавÑй ÑазÑеЌ лПÑка баÑаÑеО к ÑОкÑОÑÑÐµÐŒÐŸÐŒÑ ÑазÑÐµÐŒÑ ÐÐÐ. ÐÐ ÐÐÐЧÐÐÐÐ. ÐÑО пПЎклÑÑеМОО баÑаÑей вПзЌПжМП МезМаÑОÑелÑМПе ОÑкÑеМОе. ÐÑП МПÑЌалÑМПе ÑвлеМОе; ПМП Ме пПвÑÐµÐ¶ÐŽÐ°ÐµÑ ÐÐРО Ме ПпаÑМП. ÐайЎОÑе О пПЎклÑÑОÑе пеÑеЌÑÑкО баÑаÑеО, ÑаÑпПлПжеММÑе Ма ÐŸÐ±ÐµÐžÑ ÐºÑÐŸÐŒÐºÐ°Ñ ÑÑеЎМей ÑÑПйкО. ÐПЌеÑÑОÑе ÑазÑÐµÐŒÑ ÐœÐ° МебПлÑÑПй пПлке в веÑÑ ÐœÐµÐ¹ ÑаÑÑО ÑÑеЎМей ÑÑПйкО. ÐÐ ÐÐÐЧÐÐÐÐ. ÐПЎклÑÑÐ°Ñ Ð¿ÐµÑеЌÑÑкО ÑеМÑÑалÑМПй баÑаÑеО, Ð²Ñ Ð¿ÐŸÑлеЎПваÑелÑМП ÑПеЎОМÑеÑе Ўва лПÑка баÑаÑей. 94 | УÑÑаМПвка О запÑÑк ÐаЌеМа кÑПМÑÑейМа кÑÐµÐ¿Ð»ÐµÐœÐžÑ Ð±Ð°ÑаÑеО ÐПкПвПй паз кПÑпÑÑа ÐПкПвПй паз ÑÑеЎМей ÑÑПйкО ÐÐ ÐÐÐЧÐÐÐÐ. ÐбПзМаÑÐµÐœÐžÑ L (ÐевП) О R (ÐÑавП) Ма кÑепежМÑÑ ÐºÐŸÐœÑейМеÑÐ°Ñ ÑказÑваÑÑ ÐœÐ° ÑП, гЎе ПМО ÐŽÐŸÐ»Ð¶ÐœÑ Ð±ÑÑÑ ÑÑÑаМПвлеМÑ. 11 СМОЌОÑе левÑй (L) О пÑавÑй (R) кÑепежМÑе кÑПМÑÑÐµÐ¹ÐœÑ Ð±Ð°ÑаÑей: ÐÐ»Ñ Ð¿ÐµÑвПй ÑÐºÐŸÐ±Ñ Ð±Ð°ÑаÑеО, вÑÑавÑÑе кÑПМÑÑейМ в паз Ма ÑÑеМке ÑÑеЎМей ÑÑПйкО. ÐлПÑМП закÑепОÑе ÑПеЎОМОÑелÑМÑе кабелО баÑаÑеО за кÑПМÑÑейМПЌ. ÐÑÑПвМÑйÑе кÑай ÑÐºÐŸÐ±Ñ Ð±Ð°ÑаÑеО Ñ Ð¿ÐŸÐŒÐŸÑÑÑ ÐºÐ°ÐœÐ°Ð»Ð° Ма кПÑпÑÑе. СЎвОМÑÑе кÑПМÑÑейМ, пПка ПМ пÑПÑМП Ме заÑОкÑОÑÑеÑÑÑ Ð² бПкПвПЌ пазÑ. ÐПвеÑМОÑе вОМÑ-баÑаÑек пП ÑаÑПвПй ÑÑÑелке, ÑÑÐŸÐ±Ñ Ð·Ð°ÐºÑепОÑÑ ÐºÑПМÑÑейМ. ÐПвÑПÑОÑе пÑПÑеЎÑÑÑ ÐŽÐ»Ñ ÐºÑепежМПгП кÑПМÑÑейМа вÑПÑПй баÑаÑеО. УÑÑаМПвка пеÑеЎМей кÑÑÑкО ÐÐÐ 12 СМОЌОÑе пеÑеЎМÑÑ ÐºÑÑÑÐºÑ ÑÑОка Ñ Ð¿ÑОМаЎлежМПÑÑÑЌО. УÑÑаМПвка О запÑÑк | 95 ÐÐ ÐÐÐЧÐÐÐÐ. ÐеÑжОÑе ЎОÑк Ñ Ð¿ÑПгÑаЌЌМÑÐŒ ПбеÑпеÑеМОеЌ, ÐºÐ°Ð±ÐµÐ»Ñ ÑвÑзО, а Ñакже (пÑО ÐœÐµÐŸÐ±Ñ ÐŸÐŽÐžÐŒÐŸÑÑО) ÑазÑÐµÐŒÑ Ð¿ÐµÑеклÑÑаÑÐµÐ»Ñ ÑЎалеММПгП аваÑОйМПгП ПÑклÑÑÐµÐœÐžÑ (REPO) в ÑÑОке Ñ Ð¿ÑОМаЎлежМПÑÑÑЌО, пПка Ме ÑÑÑаМПвОÑе ÐÐÐ. 1 2 13 УÑÑаМПвОÑе пеÑеЎМÑÑ ÐºÑÑÑÐºÑ ÐÐÐ: ÐÑÑПвМÑйÑе пеÑеЎМÑÑ Ð¿Ð°ÐœÐµÐ»Ñ Ñ Ð¿ÐµÑеЎМей ÑаÑÑÑÑ ÐºÐŸÑпÑÑа. ÐÑÑавÑÑе пÑавÑе вÑÑÑÑÐ¿Ñ ÐœÐ° пеÑеЎМей кÑÑÑке в ПÑвеÑÑÑÐžÑ ÐœÐ° пÑавПй ÑÑПÑПМе кПÑпÑÑа. ÐажОЌайÑе Ма левÑÑ ÑÑПÑÐŸÐœÑ ÐºÑÑÑкО, пПка ПМа Ме заÑелкМеÑÑÑ Ð² кПÑпÑÑ. ÐÐ ÐÐÐЧÐÐÐÐ. ÐеÑеЎ закÑеплеМОеЌ кÑÑÑкО кПÑпÑÑа ÐÐÐ, ÑбеЎОÑеÑÑ, ÑÑП ÐÐ-Ð¿Ð°ÐœÐµÐ»Ñ ÐœÐ° кПÑпÑÑе ÑÐŸÐ²Ð¿Ð°ÐŽÐ°ÐµÑ ÐÐ ÑкÑаМПЌ Ма пеÑеЎМей паМелО. 14 УЎалОÑе в ПÑÑ ÐŸÐŽÑ ÐžÐ»Ðž ÑÑОлОзОÑÑйÑе ÑÐ¿Ð°ÐºÐŸÐ²ÐºÑ ÑПглаÑМП ÑÑÑаМПвлеММÑÐŒ пÑавОлаЌ ОлО ÑÐŸÑ ÑаМОÑе ее ÐŽÐ»Ñ Ð±ÑÐŽÑÑегП ОÑпПлÑзПваМОÑ. 96 | УÑÑаМПвка О запÑÑк ÐПЎклÑÑеМОе ПбПÑÑÐŽÐŸÐ²Ð°ÐœÐžÑ ÐПÑÑЎПк ÑÑÑаМПвкО ÐÐÐ 1 ÐÑлО Ð²Ñ Ð¿Ð»Ð°ÐœÐžÑÑеÑе ОÑпПлÑзПваÑÑ Dell MUMC and Dell ULNM пÑПгÑаЌЌМПе ПбеÑпеÑеМОе, ÑÑÑаМПвОÑÑ ÑвÑÐ·Ñ ÐŸÐŽÐœÐžÐŒ Оз ÑлеЎÑÑÑÐžÑ ÑпПÑПбПв: S ОÑпПлÑзÑÑ Dell Network Management Card (еÑлО ПМа ÑÑÑаМПвлеМа) S Ñ Ð¿ÐŸÐŒÐŸÑÑÑ Ð¿ÑОлагаеЌПгП ÐºÐ°Ð±ÐµÐ»Ñ ÐŽÐ»Ñ Ð¿ÐŸÐŽÐºÐ»ÑÑÐµÐœÐžÑ ÐºÐŸÐŒÐ¿ÑÑÑеÑа к USB пПÑÑÑ ÐÐ ÐÐÐЧÐÐÐÐ. ÐÐ»Ñ Ð¿ÐŸÐ»ÑÑÐµÐœÐžÑ ÐŽÐŸÐ¿ÐŸÐ»ÐœÐžÑелÑМПй ОМÑПÑЌаÑОО П ваÑОаМÑÐ°Ñ ÐºÐŸÐŒÐŒÑМОкаÑОПММÑÑ Ð¿ÐŸÐŽÐºÐ»ÑÑеМОй ÑЌПÑÑОÑе Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐŸÐœÐ»Ð°Ð¹ÐœÐŸÐ²ÐŸÐ³ÐŸ 10 кÐÑ ÐÐÐ Dell пÑО ÑÑÑаМПвке в ÑÑПйке. 2 ÐÑлО ÑÑПйка ПÑМаÑеМа пÑПвПЎМОкаЌО ÐŽÐ»Ñ Ð·Ð°Ð·ÐµÐŒÐ»ÐµÐœÐžÑ ÐœÐµÐ·Ð°Ð·ÐµÐŒÐ»ÐµÐœÐœÑÑ ÐŒÐµÑаллОÑеÑÐºÐžÑ ÐŽÐµÑалей, пПЎÑПеЎОМОÑе ÐºÐ°Ð±ÐµÐ»Ñ Ð·Ð°Ð·ÐµÐŒÐ»ÐµÐœÐžÑ (Ме Ð²Ñ ÐŸÐŽÐžÑ Ð² ÐºÐŸÐŒÐ¿Ð»ÐµÐºÑ Ð¿ÐŸÑÑавкО) к вОМÑÑ Ð·Ð°Ð·ÐµÐŒÐ»ÐµÐœÐžÑ. ÐМÑПÑЌаÑÐžÑ ÐŸ ÑаÑпПлПжеМОО зазеЌлÑÑÑегП вОМÑа ÐŽÐ»Ñ ÐºÐ°Ð¶ÐŽÐŸÐ¹ Оз ÑÑÐµÑ ÐŒÐŸÐŽÐµÐ»ÐµÐ¹ ÑÐŒ. в ÑазЎеле «ÐаЎМОе паМелО ÐÐл Ма ÑÑÑаМОÑе 104. 3 ÐÑлО ЌеÑÑМÑе МПÑЌаÑÐžÐ²Ñ ÑÑебÑÑÑ ÐœÐ°Ð»ÐžÑÐžÑ Ð°Ð²Ð°ÑОйМПгП (ПÑклÑÑаÑÑегП) вÑклÑÑаÑÐµÐ»Ñ Ð¿ÐžÑаМОÑ, ÑЌПÑÑОÑе ÑазЎел «Ð£ÑÑаМПвка ЎОÑÑаМÑОПММПгП аваÑОйМПгП вÑклÑÑаÑÐµÐ»Ñ Ð¿ÐžÑаМОѻ в Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐŸÐœÐ»Ð°Ð¹ÐœÐŸÐ²ÐŸÐ³ÐŸ 10 кÐÑ ÐÐÐ Dell пÑО ÑÑÑаМПвке в ÑÑПйке. 4 ÐМÑÑÑÑкÑОО пП ÑÑÑаМПвке ЎПпПлМОÑелÑМПгП EBM ÑЌПÑÑОÑе в ÑазЎеле EBM Dell Ма ÑÑПйке 10 кW ÐаÑалП ÑабПÑÑ c ÑОÑÑеЌПй. ÐÐÐÐÐÐÐÐ! ÐÑлО ÐÐÐ Ñ ÑаМОÑÑÑ ÐžÐ»Ðž ОÑпПлÑзÑеÑÑÑ Ð±ÐµÐ· EBM, кÑÑÑка ÑазÑеЌа баÑаÑей Ма заЎМей паМелО ÐÐРЎПлжМа бÑÑÑ ÑÑÑаМПвлеМа в каÑеÑÑве ЌеÑÑ Ð¿ÑеЎПÑÑПÑПжМПÑÑО. 5 ÐПЎклÑÑОÑе ПбПÑÑЎПваМОе, кПÑПÑПе ÐœÐµÐŸÐ±Ñ ÐŸÐŽÐžÐŒÐŸ пÑÐµÐŽÐŸÑ ÑаМОÑÑ ÐŸÑ ÑкаÑкПв МапÑÑжеМОÑ, к вÑÑ ÐŸÐŽÐœÑÐŒ гМезЎаЌ ÐÐÐ, МП Ме вклÑÑайÑе егП. 6 ÐÑПвеÑÑÑе МаЎежМПÑÑÑ Ð¿ÐŸÐŽÐºÐ»ÑÑÐµÐœÐžÑ Ðž ПÑÑÑÑÑÑвОе МаÑÑÐ¶ÐµÐœÐžÑ ÐºÐ°Ð±ÐµÐ»ÐµÐ¹. ÐÐ ÐÐÐЧÐÐÐÐ. ÐП ОзбежаМОе пеÑегÑÑзкО ÑбеЎОÑеÑÑ Ð² ÑПЌ, ÑÑП ПбÑÐ°Ñ Ð¿Ð°ÑпПÑÑÐœÐ°Ñ ÐŒÐŸÑМПÑÑÑ ÐŸÐ±ÐŸÑÑÐŽÐŸÐ²Ð°ÐœÐžÑ ÐœÐµ пÑевÑÑÐ°ÐµÑ ÐŒÐŸÑМПÑÑÑ ÐÐÐ. УÑÑаМПвка О запÑÑк | 97 ЀОкÑОÑПваММÑй ЌПМÑаж Ма Ð²Ñ ÐŸÐŽÐµ ÐÐÐ ÐÐ ÐÐУÐÐ ÐÐÐÐÐÐÐ. СÑÑеÑÑвÑÐµÑ ÐŸÐ¿Ð°ÑМПÑÑÑ Ð¿ÐŸÑÐ°Ð¶ÐµÐœÐžÑ ÑлекÑÑОÑеÑкОЌ ÑПкПЌ. УÑÑаМПвка ÑлекÑÑППбПÑÑÐŽÐŸÐ²Ð°ÐœÐžÑ ÐŒÐŸÐ¶ÐµÑ Ð²ÑпПлМÑÑÑÑÑ ÑПлÑкП квалОÑОÑОÑПваММÑÐŒ ПбÑлÑжОваÑÑОЌ пеÑÑПМалПЌ (МапÑОЌеÑ, ÑеÑÑОÑОÑОÑПваММÑÐŒ ÑлекÑÑОкПЌ). ÐПЎелО Dell Rack ÑÑебÑÑÑ Ð²ÑЎелеММПй ПÑвеÑвлеММПй ÑепО, ПÑвеÑаÑÑей ÑлеЎÑÑÑОЌ ÑÑебПваМОÑÐŒ: S ÐÑÐµÐŽÐŸÑ ÑаМОÑелÑМПе ÑÑÑÑПйÑÑвП ÑÑебÑÐµÑ ÐœÐ°Ð»ÐžÑÐžÑ ÐŽÐ²ÑÑ Ð¿ÐŸÐ»ÑÑМПгП ÑÑÑÑПйÑÑва ÑаÑÑÐŸÐµÐŽÐžÐœÐµÐœÐžÑ ÐŒÐµÐ¶ÐŽÑ Ð²Ñ ÐŸÐŽÐŸÐŒ ÐÐРО ÑеÑÑÑ S ÐÑклÑÑаÑÐµÐ»Ñ ÐŽÐŸÐ»Ð¶ÐµÐœ бÑÑÑ ÑÑÑаМПвлеМ Ма ÑÑеМе О бÑÑÑ Ð»ÐµÐ³ÐºÐŸ ЎПÑÑÑпМÑÐŒ ÐŽÐ»Ñ ÐŸÐ¿ÐµÑаÑПÑа S ÐÐ»Ñ ÐвÑПпÑ. РазЌÑкаÑÐµÐ»Ñ ÐŽÐŸÐ»Ð¶ÐµÐœ ПÑвеÑаÑÑ ÑÑаМЎаÑÑÑ IEC/EN 60934 О ОЌеÑÑ ÐºÐŸÐœÑакÑМÑй вПзЎÑÑМÑй пÑПÑÐ²ÐµÑ ÐœÐµ ЌеМее 3 ЌЌ. S 200Ä240 РпеÑеЌеММПгП ÑПка S ÐЎМПÑÐ°Ð·ÐœÐ°Ñ S 50/60 ÐÑ S ÐОбкОй ЌеÑаллОÑеÑкОй кабелепÑПвПЎ (ÑекПЌеМЎÑеÑÑÑ ÐŽÐ»Ñ ÐŸÐ±Ð»ÐµÐ³ÑÐµÐœÐžÑ ÐŸÐ±ÑлÑÐ¶ÐžÐ²Ð°ÐœÐžÑ Ðž ÑеЌПМÑа) СÑеМа РПзеÑка пеÑеЌеММПгП ÑПка 98 | УÑÑаМПвка О запÑÑк СÑÑПка 2-пПлÑÑМÑй пÑеÑÑваÑÐµÐ»Ñ ÐÐÐ ÐейÑÑалÑ/L2 СМÑÑОе кÑÑÑкО клеЌЌМПй кПлПЎкО ÐÑбОвМПе ПÑвеÑÑÑОе ÐÑÑÑка клеЌЌМПгП блПка 1 ÐÑклÑÑОÑе пПЎаÑÑ ÑПка Ма ÑПÑке ÑаÑпÑеЎелеМОÑ, гЎе бÑÐŽÐµÑ Ð¿ÐŸÐŽÐºÐ»ÑÑеМ ÐÐÐ. УбеЎОÑеÑÑ ÐœÐ°Ð²ÐµÑМÑка в ПÑÑÑÑÑÑвОО ÑлекÑÑПпОÑаМОÑ. 2 УЎалОÑе кÑÑÑÐºÑ ÐºÐ»ÐµÐŒÐŒÐœÐŸÐ¹ кПлПЎкО (Ўва вОМÑа) О ÑÐŸÑ ÑаМОÑе ее. 3 СЎелайÑе вÑбОвМПе ПÑвеÑÑÑОе в кÑÑÑке клеЌЌМПгП блПка ÐŽÐ»Ñ Ð²Ñ ÐŸÐŽÐœÐŸÐ³ÐŸ кабелепÑПвПЎа. РПÑвеÑÑÑОе ЎПлжеМ Ð²Ñ ÐŸÐŽÐžÑÑ 1 â ОлО 1.5â (25.4 ЌЌ ОлО 38.1 ЌЌ) пÑПЌежÑÑПÑМÑй ЌеÑаллОÑеÑкОй кабелепÑПвПЎПв (IMC). УÑÑаМПвка О запÑÑк | 99 ÐÐÐÐÐÐÐÐ! ÐÑлО Ма ÐÐÐ ÐœÐµÑ Ð°Ð²ÑПЌаÑОÑеÑкПгП ÑÑÑÑПйÑÑва заÑОÑÑ ÐŸÑ ÐŸÐ±ÑаÑМПгП ÑПка, ÑÑÑаМПвОÑе вМеÑМее ОзПлОÑÑÑÑее ÑÑÑÑПйÑÑвП. ÐПÑле ÑÑÑаМПвкО ÑÑÑÑПйÑÑва ÐœÐµÐŸÐ±Ñ ÐŸÐŽÐžÐŒÐŸ пÑОкÑепОÑÑ ÐœÐ° вМеÑМОй заЌÑкаÑÐµÐ»Ñ Ð¿ÐµÑеЌеММПгП ÑПка пÑеЎÑпÑежЎаÑÑÑÑ ÐœÐ°ÐºÐ»ÐµÐ¹ÐºÑ ÑлеЎÑÑÑегП (ОлО ÑквОвалеМÑМПгП) ÑПЎеÑжаМОÑ: Ð ÐСРÐÐÐРЯÐÐÐÐЯ ÐÐÐ ÐТÐÐÐРТÐÐÐ. ÐзПлОÑÑйÑе ÐÐРпеÑеЎ ÑабПÑПй Ма ÑÑПй ÑепО, заÑеЌ пÑПвеÑÑÑе ПÑÑÑÑÑвОе ПпаÑМПгП МапÑÑÐ¶ÐµÐœÐžÑ ÐœÐ° вÑÐµÑ ÐºÐ»ÐµÐŒÐŒÐ°Ñ . ÐМеÑМÑÑ ÑаÑпÑеЎелОÑелÑÐœÐ°Ñ Ð¿Ð°ÐœÐµÐ»Ñ Q ÐÐÐ T L/L1 L/L1 N/L2 N/L2 УÑлПвМÑе ПбПзМаÑÐµÐœÐžÑ B Q ÐОÑÑаМÑОПММÑй вÑклÑÑаÑÐµÐ»Ñ ÐŸÐ±ÐŒÐŸÑкО ÐагМОÑП-ÑеплПвПй Ð²Ñ ÐŸÐŽ ÐлавМÑй вÑклÑÑаÑÐµÐ»Ñ 2-пПлÑÑМÑй пÑеÑÑваÑÐµÐ»Ñ T N/L2 ÐейÑÑалÑ/L2 L/L1 ÐÑ ÐŸÐŽ лОМОО L1 B Ð ÑлеЎÑÑÑей ÑаблОÑе пеÑеÑОÑÐ»ÐµÐœÑ Ð·Ð°ÐŒÑкаÑелО пеÑеЌеММПгП ÑПка, кПÑПÑÑе ЌПгÑÑ ÐžÑпПлÑзПваÑÑÑÑ ÐºÐ°Ðº заÑОÑМÑе ÑÑÑÑПйÑÑва ÐŸÑ ÐŸÐ±ÑаÑМПгП ÑПка. ÐÑпПлÑзÑйÑе ÑПлÑкП ÑказаММÑе в ÑаблОÑе заЌÑкаÑелО пеÑеЌеММПгП ÑПка. ÐÑПОзвПЎОÑÐµÐ»Ñ Ð¢ÐžÐ¿ ÐПЌОМал A75-30 220Ä240 РпеÑ. ÑПка, 105A 25 HP пÑО 208Ð, 30HP пÑО 240Ð Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (ЎПпПлМОÑелÑМÑй) GSC1(CJX4-d)-6511 220Ä240 РпеÑ. ÑПка, 68A 25 HP Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (ЎПпПлМОÑелÑМÑй) GSC1(CJX4-d)-8011 220Ä240 РпеÑ. ÑПка, 80A 30 HP ABB ЀÑаМÑÐžÑ (E12527) ÐÐ ÐÐÐЧÐÐÐÐ. ÐеÑЌПÑÑÑ ÐœÐ° ÑП, ÑÑП ÐÐРМе ÑМабжеМ заÑОÑМÑЌО Ñеле ÐŸÑ ÐŸÐ±ÑаÑМПгП ÑПка (ABF), МекПÑПÑÐ°Ñ Ð·Ð°ÑОÑа ÐŸÑ ÐŸÐ±ÑаÑМПгП ÑПка пÑеЎÑÑЌПÑÑеМа. ÐапÑОЌеÑ, еÑлО МекПÑПÑÑе кПЌпПМеМÑÑ Ð¿ÐŸÐ²ÑÐµÐ¶ÐŽÐµÐœÑ Ð² ÑежОЌе ÑабПÑÑ ÐŸÑ Ð±Ð°ÑаÑеО, вÑÑ ÐŸÐŽÐœÐŸÐµ МапÑÑжеМОе ÐŒÐŸÐ¶ÐµÑ Ð¿ÐŸÐŽÐ°Ð²Ð°ÑÑÑÑ ÐœÐ° Ð²Ñ ÐŸÐŽ. Ð ÑÑПЌ ÑлÑÑае ÑÑаМÑÑПÑЌаÑÐŸÑ ÑПка (ТТ) ОÑпПлÑзÑеÑÑÑ ÐŽÐ»Ñ ÐŸÐ±ÐœÐ°ÑÑÐ¶ÐµÐœÐžÑ Ð±Ð°Ð¹Ð¿Ð°Ñа МапÑÑÐ¶ÐµÐœÐžÑ ÐŸÐ±ÑаÑМПгП ÑПка. ÐÑлО ПбМаÑÑжОваеÑÑÑ ÐœÐ°Ð¿ÑÑжеМОе ПбÑаÑМПгП ÑПка, ÐÐРпÑекÑаÑÐ°ÐµÑ Ð²ÑÑ ÐŸÐŽ Ма ОМвеÑÑПÑе, ÑÑÐŸÐ±Ñ ÐžÐ·Ð±ÐµÐ¶Ð°ÑÑ ÑÑавЌ. 100 | УÑÑаМПвка О запÑÑк УÑÑаМПвка Ð²Ñ ÐŸÐŽÐœÑÑ Ðž зазеЌлÑÑÑÐžÑ Ð¿ÑПвПЎПв 1 2 3 4 ÐÑПÑÑМОÑе Ð²Ñ ÐŸÐŽÐœÐŸÐ¹ пÑПвПЎ ÑеÑез кабелепÑПвПЎ, ПÑÑавОв ПкПлП 0,5 ÐŒ ПÑкÑÑÑПгП пÑПвПЎа. ÐÑОÑПеЎОМОÑе гОбкОй ЌеÑаллОÑеÑкОй паÑÑÑбПк к кПМÑÑ ÐºÐ°Ð±ÐµÐ»ÐµÐ¿ÑПвПЎа. 5 ÐÑÑавÑÑе кабелепÑПвПЎ ÑеÑез ПÑвеÑÑÑОе ÐŽÐ»Ñ Ð²Ð²ÐŸÐŽÐ° пÑПвПЎПв О пÑОÑПеЎОМОÑе паÑÑÑбПк кабелепÑПвПЎа к паМелО. ÐаÑОÑÑОÑеâ ÐºÐŸÐœÐµÑ ÐºÐ°Ð¶ÐŽÐŸÐ³ÐŸ Ð²Ñ ÐŸÐŽÑÑегП пÑПвПЎа Ма 1,5 ÑÐŒ (0,5). 6 ÐПЎклÑÑОÑе Ð²Ñ ÐŸÐŽÐœÐŸÐ¹ О зазеЌлÑÑÑОй пÑПвПЎа к клеЌЌМПй кПлПЎке в ÑППÑвеÑÑÑвОО Ñ Ð¥Ð°ÑакÑеÑОÑÑОкаЌО ÑлекÑÑПпÑПвПЎкО ÐÐÐ, ÑказаММÑЌО в ÑлеЎÑÑÑей ÑаблОÑе. ЀÑМкÑÐžÑ Ð¿ÑПвПЎа УÑÐŸÐ²ÐµÐœÑ Ð²Ñ ÐŸÐŽÐ° ÐПлПжеМОе ÐºÐ»ÐµÐŒÐŒÑ Ð€ÑМкÑÐžÑ Ð¿ÑПвПЎа ÐÐÐ 1 ÐвПЎ, зазеЌлеМОе 2 L2/ÐÑ ÐŸÐŽ, МÑÐ»Ñ 3 ÐÑ ÐŸÐŽ L1 ÐПЌОМалÑМПе ÑеÑеМОе клеЌЌМПгП пÑПвПЎа* ÐÐŸÐŒÐµÐœÑ Ð·Ð°ÑÑжкО 16Ä35 ЌЌ2 (8Ä2 AWG) 1.7 ÐÐŒ (15 ÑÑМÑ-ÐŽÑйЌ) * ÐбеÑпеÑОÑÑ ÐŒÐžÐœÐžÐŒÐ°Ð»ÑМП ЎПпÑÑÑОЌПе зМаÑеМОе: S 8 ХаÑакÑеÑОÑÑОка пÑПвПЎПв Ð·Ð°Ð·ÐµÐŒÐ»ÐµÐœÐžÑ ÐŸÐ±ÐŸÑÑÐŽÐŸÐ²Ð°ÐœÐžÑ Ð¿ÐŸ AWG, 75 _C, ЌеЎМÑй пÑПвПЎ, ЌОМОЌалÑМПе ÑÑебПваМОе S 4 ХаÑакÑеÑОÑÑОка пÑПвПЎПв Ð²Ñ ÐŸÐŽÐœÐŸÐ¹ лОМОО О МейÑÑалО пП AWG, 75_C, ЌеЎМÑй пÑПвПЎ, ЌОМОЌалÑМПе ÑÑебПваМОе 7 СМОЌОÑе кÑÑÑÐºÑ ÐºÐ»ÐµÐŒÐŒÐœÐŸÐ¹ кПлПЎкО. УÑÑаМПвка О запÑÑк | 101 ÐапÑÑк ÐÐÐ ÐМПпка Ðкл./ÐÑкл ÐПÑÑЎПк запÑÑка ÐÐÐ 1 УбеЎОÑеÑÑ Ð² ÑПЌ, ÑÑП вМÑÑÑеММОе баÑаÑеО пПЎклÑÑеМÑ. 2 ÐÑО ПпÑОПМалÑМПй ÑÑÑаМПвке EBM пÑПвеÑÑÑе, ÑÑÐŸÐ±Ñ EBM бÑлП пПЎклÑÑеМП к ÐÐÐ. ÐÐ»Ñ Ð¿ÐŸÐ»ÑÑÐµÐœÐžÑ Ð±ÐŸÐ»ÐµÐµ пПЎÑПбМПй ОМÑПÑЌаÑОО ПбÑаÑОÑеÑÑ Ðº EBM Dell Ма ÑÑПйке 10 кW ÐаÑалП ÑабПÑÑ c ÑОÑÑеЌПй. 3 ÐÑПвеÑÑÑе, ÑÑÐŸÐ±Ñ Ð²Ñе ÑегЌеМÑÑ Ð·Ð°Ð³ÑÑзкО пÑеÑÑваÑÐµÐ»Ñ ÑепО бÑлО в пПлПжеМОО «ÐÐл. 4 ÐклÑÑОÑе главМÑй авÑÐŸÐŒÐ°Ñ Ð·Ð°ÑОÑÑ. ÐагПÑаеÑÑÑ ÐŽÐžÑплей ÐРпаМелО ÐÐÐ. ÐкÑаМ запÑÑка Dell ЌеМÑеÑÑÑ ÐœÐ° ОÑПгПвÑй ÑкÑаМ ÑПÑÑПÑÐœÐžÑ ÐÐÐ. ÐОÑплей пеÑеЎМей паМелО ÐÐРПÑПбÑÐ°Ð¶Ð°ÐµÑ ÐŒÐžÐ³Ð°ÑÑÑÑ Ð¿ÐžÐºÑПгÑÐ°ÐŒÐŒÑ ÑежОЌа ÐŸÐ¶ÐžÐŽÐ°ÐœÐžÑ . 5 ÐажЌОÑе Ма ÐºÐœÐŸÐ¿ÐºÑ Ðкл/ÐÑкл Ма пеÑеЎМей паМелО ÐÐÐ. ÐПÑле завеÑÑÐµÐœÐžÑ Ð·Ð°Ð¿ÑÑка ÑПÑÑПÑМОе ОзЌеМОÑÑÑ Ð² ÑППÑвеÑÑÑвОО Ñ ÑежОЌПЌ ÑабПÑÑ ÐÐÐ. 102 | УÑÑаМПвка О запÑÑк 6 Ðа ОÑПгПвПЌ ÑкÑаМе ÑПÑÑПÑÐœÐžÑ ÐÐРМажЌОÑе ÐºÐœÐŸÐ¿ÐºÑ , ÑÑÐŸÐ±Ñ Ð¿ÑПвеÑОÑÑ ÐœÐ°Ð»ÐžÑОе акÑОвМÑÑ Ð°Ð²Ð°ÑОйМÑÑ ÑОгМалПв ОлО ОзвеÑеМОй. ÐÑОЌОÑе ÑППÑвеÑÑÑвÑÑÑОе ЌеÑÑ Ð² ПÑМПÑеМОО вÑÐµÑ Ð°ÐºÑОвМÑÑ Ð¿ÑеЎÑпÑежЎеМОй, пÑежЎе ÑеЌ пÑПЎПлжОÑÑ ÑабПÑÑ. СЌПÑÑОÑе ÑазЎел «ÐПОÑк О ÑÑÑÑаМеМОе МеОÑпÑавМПÑÑей» в Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐŸÐœÐ»Ð°Ð¹ÐœÐŸÐ²ÐŸÐ³ÐŸ 10 кÐÑ ÐÐÐ Dell пÑО ÑÑÑаМПвке в ÑÑПйке. Ð ÑлÑÑае ПÑÑÑÑÑÑÐ²ÐžÑ Ð°ÐºÑОвМÑÑ Ð°Ð²Ð°ÑОйМÑÑ ÑОгМалПв пПÑвОÑÑÑ ÑППбÑеМОе «ÐкÑОвМÑе аваÑОйМÑе ÑÐžÐ³ÐœÐ°Ð»Ñ ÐŸÑÑÑÑÑÑвÑÑÑ». 7 УбеЎОÑеÑÑ Ð² ÑПЌ, ÑÑП Ма ОÑПгПвПЌ ÑкÑаМе ÑПÑÑПÑÐœÐžÑ ÐÐРпПÑвОлаÑÑ Ð¿ÐžÐºÑПгÑаЌЌа ПбÑÑМПгП ÑежОЌа , ПбПзМаÑаÑÑаÑ, ÑÑП ÐÐÐ ÑабПÑÐ°ÐµÑ ÐœÐŸÑЌалÑМП О Ð¿ÐŸÐŽÐ°ÐµÑ ÑлекÑÑПпОÑаМОе Ма ОЌеÑÑОеÑÑ ÐœÐ°Ð³ÑÑзкО. 8 Ð ÑазЎеле Ð ÑкПвПЎÑÑвП пПлÑзПваÑÐµÐ»Ñ ÐŸÐœÐ»Ð°Ð¹ÐœÐŸÐ²ÐŸÐ³ÐŸ 10 кÐÑ ÐÐÐ Dell пÑО ÑÑÑаМПвке в ÑÑПйке пÑеЎÑÑавлеМа ÑлеЎÑÑÑÐ°Ñ ÐžÐœÑПÑЌаÑОÑ: S ÐÑПÑеЎÑÑа МаÑÑÑПйкО ÑÑÑаМПвлеММПгП ЎПпПлМОÑелÑМПгП вМеÑМегП баÑаÑейМПгП ЌПЎÑÐ»Ñ (EBM) S ÐÐ»Ñ ÑÑÑаМПвкО ЎаÑÑ Ðž вÑеЌеМО, а Ñакже ÐžÐ·ÐŒÐµÐœÐµÐœÐžÑ ÐŽÑÑÐ³ÐžÑ Ð·Ð°Ð²ÐŸÐŽÑÐºÐžÑ ÐœÐ°ÑÑÑПек пП ÑЌПлÑÐ°ÐœÐžÑ 9 ÐÑО ÑÑÑаМПвке ЎПпПлМОÑелÑМПгП ЎОÑÑаМÑОПММПгП аваÑОйМПгП вÑклÑÑаÑÐµÐ»Ñ Ð¿ÐžÑÐ°ÐœÐžÑ Ð¿ÑПвеÑÑÑе ÑÑМкÑÐžÑ ÐŽÐžÑÑаМÑОПММПгП аваÑОйМПгП вÑклÑÑÐµÐœÐžÑ Ð¿ÐžÑаМОÑ: ÐклÑÑОÑе вМеÑМОй ЎОÑÑаМÑОПММÑй аваÑОйМÑй вÑклÑÑаÑÐµÐ»Ñ Ð¿ÐžÑаМОÑ. ÐÑПвеÑÑÑе ОзЌеМеМОе ÑПÑÑПÑÐœÐžÑ ÐœÐ° ÑкÑаМе ÐÐÐ. ÐÑклÑÑОÑе вМеÑМОй ЎОÑÑаМÑОПММÑй аваÑОйМÑй вÑклÑÑаÑÐµÐ»Ñ Ð¿ÐžÑÐ°ÐœÐžÑ Ðž пеÑезапÑÑÑОÑе ÐÐÐ. 10 ÐаÑÑЎОÑе баÑаÑеО. УÑÑаМПвка О запÑÑк | 103 ÐÐ ÐÐÐЧÐÐÐÐ. ÐМÑÑÑеММОе баÑаÑеО ÐÐРзаÑÑжаÑÑÑÑ ÐŽÐŸ 90 % еЌкПÑÑО ЌеМее ÑеЌ за ÑÑО ÑаÑа. ÐЎМакП, пПÑле ÑÑÑаМПвкО ОлО ЎлОÑелÑМПгП Ñ ÑÐ°ÐœÐµÐœÐžÑ ÐœÐµÐŸÐ±Ñ ÐŸÐŽÐžÐŒÐŸ заÑÑжаÑÑ Ð°ÐºÐºÑÐŒÑлÑÑПÑÑ Ð² ÑеÑеМОе 48 ÑаÑПв. ÐÐÐÐÐÐÐÐ! ÐÐ»Ñ Ð¿ÑеЎПÑвÑаÑÐµÐœÐžÑ ÑÑлПвОй пеÑегÑÑзкО ÐÐÐ, еЎОМПвÑеЌеММП пПЎклÑÑайÑе ÐŸÐŽÐœÑ ÐœÐ°Ð³ÑÑÐ·ÐºÑ Ðž пÑежЎе ÑеЌ пПЎклÑÑаÑÑ ÑлеЎÑÑÑОе МагÑÑзкО, ÑбеЎОÑеÑÑ Ð² ÑПЌ, ÑÑП кажЎПе заÑОÑеММПе ÑÑÑÑПйÑÑвП запÑÑÑОлПÑÑ Ð¿ÐŸÐ»ÐœÐŸÑÑÑÑ. ÐÐ ÐÐÐЧÐÐÐÐ. Dell ÑекПЌеМЎÑÐµÑ ÐœÐ°ÑÑÑПОÑÑ ÐŽÐ°ÑÑ Ðž вÑÐµÐŒÑ Ð² ÑелÑÑ ÑÑÑÑÐ°ÐœÐµÐœÐžÑ ÐœÐµÐžÑпÑавМПÑÑей ОлО ПпÑÐµÐŽÐµÐ»ÐµÐœÐžÑ Ð³Ð°ÑаМÑОО. ÐÐ ÐÐÐЧÐÐÐÐ. ÐÑО пеÑвПЌ запÑÑке ÐÐРМаÑÑÑÐ°ÐžÐ²Ð°ÐµÑ ÑаÑÑПÑÑ ÑОÑÑÐµÐŒÑ Ð² ÑППÑвеÑÑÑвОО Ñ ÑаÑÑПÑПй пОÑаÑÑей лОМОО (ÑÑМкÑÐžÑ Ð°Ð²ÑПЌаÑОÑеÑкПгП ПпÑÐµÐŽÐµÐ»ÐµÐœÐžÑ Ð²Ñ ÐŸÐŽÐœÐŸÐ¹ ÑаÑÑПÑÑ Ð²ÐºÐ»ÑÑеМа пП ÑЌПлÑаМОÑ). ÐПÑле пеÑвПМаÑалÑМПгП запÑÑка ÑÑМкÑÐžÑ Ð°Ð²ÑПЌаÑОÑеÑкПгП ПпÑÐµÐŽÐµÐ»ÐµÐœÐžÑ ÐŸÑклÑÑаеÑÑÑ ÐŽÐŸ ÑÐµÑ Ð¿ÐŸÑ, пПка Ð²Ñ ÐœÐµ вклÑÑОÑе ее пПвÑПÑМП вÑÑÑМÑÑ Ð¿ÑО МаÑÑÑПйке вÑÑ ÐŸÐŽÐœÐŸÐ¹ ÑаÑÑПÑÑ. ÐÐ ÐÐÐЧÐÐÐÐ. ÐаÑалÑМÑй запÑÑк, Ð²Ñ ÐŸÐŽÐœÐŸÐµ МапÑÑжеМОе вклÑÑÐµÐœÑ Ð¿ÐŸ ÑЌПлÑаМОÑ. ÐПÑле пПÑлеЎÑÑÑÐžÑ Ð·Ð°Ð¿ÑÑкПв ÑÑМкÑÐžÑ Ð°Ð²ÑПЌаÑОÑеÑкПгП ПпÑÐµÐŽÐµÐ»ÐµÐœÐžÑ ÐŸÑклÑÑаеÑÑÑ ÐŽÐŸ ÑÐµÑ Ð¿ÐŸÑ, пПка Ð²Ñ ÐœÐµ вклÑÑОÑе ее пПвÑПÑМП вÑÑÑМÑÑ Ð¿ÑО МаÑÑÑПйке вÑÑ ÐŸÐŽÐœÐŸÐ³ÐŸ МапÑÑжеМОÑ. ÐЎеМÑОÑОкаÑÐžÑ Ð·Ð°ÐŽÐœÐµÐ¹ паМелО ÐÐÐ Ð ÑÑПЌ ÑазЎеле Ð¿ÐŸÐºÐ°Ð·Ð°ÐœÑ Ð·Ð°ÐŽÐœÐžÐµ паМелО ÑÑÐµÑ Ð²ÐŸÐ·ÐŒÐŸÐ¶ÐœÑÑ ÐŒÐŸÐŽÐµÐ»ÐµÐ¹ ÐÐÐ Dell Rack 10 kW. 104 | УÑÑаМПвка О запÑÑк 10 кÐÑ 208Ð ÐÐÐ (DELL10KWOLHVUS) ÐПЌЌÑМОкаÑОПММÑй ПÑÑек ÐÐÐ ÐЎМа ÑПзеÑка NEMA L6-30R ÐПÑÑ ÐПÑÑ RS-232 USB Ðве ÑПзеÑкО IEC 320-C19 Ðва пÑеÑÑваÑÐµÐ»Ñ Ð²ÑÑ ÐŸÐŽÐœÐŸÐ³ÐŸ кПМÑÑÑа Ð¡ÐµÐ³ÐŒÐµÐœÑ ÐœÐ°Ð³ÑÑзкО 1 (LS1) ÐПÑÑÑ REPO РазÑеЌ вМеÑМегП баÑаÑейМПгП ЌПЎÑÐ»Ñ (ÐÐÐ) ÐЎМа ÑПзеÑка NEMA L6-30R Ðве ÑПзеÑкО IEC 320-C19 Ðва пÑеÑÑваÑÐµÐ»Ñ Ð²ÑÑ ÐŸÐŽÐœÐŸÐ³ÐŸ кПМÑÑÑа ÐПÑÑÑ REPO ÐÑ ÐŸÐŽÐœÐ°Ñ ÐºÐ»ÐµÐŒÐŒÐœÐ°Ñ ÐºÐŸÐ»ÐŸÐŽÐºÐ° Ð¡ÐµÐ³ÐŒÐµÐœÑ ÐœÐ°Ð³ÑÑзкО 2 (LS2) УÑÑаМПвка О запÑÑк | 105 10 кÐÑ 230Ð ÐÐÐ (DELL10KWOLHV) ÐПÑÑ ÐПÑÑ RS-232 USB ÐПЌЌÑМОкаÑОПММÑй ПÑÑек ÐÐÐ Ðва пÑеÑÑваÑÐµÐ»Ñ Ð²ÑÑ ÐŸÐŽÐœÐŸÐ³ÐŸ кПМÑÑÑа Ðве ÑПзеÑкО IEC 320-C19 ÐЎМа ÑПзеÑка IEC 60309 332R6S Ð¡ÐµÐ³ÐŒÐµÐœÑ ÐœÐ°Ð³ÑÑзкО 1 (LS1) 106 | УÑÑаМПвка О запÑÑк ÐПÑÑÑ ÐПÑÑÑ Ð Ð°Ð·ÑеЌ вМеÑМегП REPO баÑаÑейМПгП ЌПЎÑÐ»Ñ (ÐÐÐ) REPO ÐÑеÑÑваÑÐµÐ»Ñ Ð²ÑÑ ÐŸÐŽÐœÐŸÐ³ÐŸ кПМÑÑÑа ÐЎМа ÑПзеÑка IEC 60309 332R6S Ð¡ÐµÐ³ÐŒÐµÐœÑ ÐœÐ°Ð³ÑÑзкО 2 (LS2) ÐÑ ÐŸÐŽÐœÐ°Ñ ÐºÐ»ÐµÐŒÐŒÐœÐ°Ñ ÐºÐŸÐ»ÐŸÐŽÐºÐ° 10 кÐÑ 230Ð ÐÐÐ (DELL10KWOLHVB) ÐПЌЌÑМОкаÑОПММÑй ПÑÑек ÐÐÐ Ðва пÑеÑÑваÑÐµÐ»Ñ Ð²ÑÑ ÐŸÐŽÐœÐŸÐ³ÐŸ кПМÑÑÑа ÐПÑÑ ÐПÑÑ RS-232 USB ЧеÑÑÑе гМезЎа IEC 320-C19 Ð¡ÐµÐ³ÐŒÐµÐœÑ ÐœÐ°Ð³ÑÑзкО 1 (LS1) ÐПÑÑÑ REPO Ðва пÑеÑÑваÑÐµÐ»Ñ Ð²ÑÑ ÐŸÐŽÐœÐŸÐ³ÐŸ кПМÑÑÑа РазÑеЌ вМеÑМегП баÑаÑейМПгП ЌПЎÑÐ»Ñ (ÐÐÐ) ЧеÑÑÑе гМезЎа IEC 320-C19 ÐПÑÑÑ REPO ÐÑ ÐŸÐŽÐœÐ°Ñ ÐºÐ»ÐµÐŒÐŒÐœÐ°Ñ ÐºÐŸÐ»ÐŸÐŽÐºÐ° Ð¡ÐµÐ³ÐŒÐµÐœÑ ÐœÐ°Ð³ÑÑзкО 2 (LS2) УÑÑаМПвка О запÑÑк | 107 108 | УÑÑаМПвка О запÑÑк Dellt UPS de rack en línea 10 kW Cómo empezar con su sistema DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com Notas y Advertencias NOTA: NOTA indica información importante que lo ayudará a utilizar mejor el software. PELIGRO: Un PELIGRO indica una situación inminentemente peligrosa que, si no se evita, dará como resultado la muerte o una lesión grave. ADVERTENCIA: ADVERTENCIA indica una situación posiblemente peligrosa que, si no se evita, puede tener como consecuencia la muerte o una lesión grave. PRECAUCIÓN: PRECAUCIÓN indica una situación potencialmente riesgosa que, si no se evita, puede provocar una lesión moderada o leve, o incidentes de daño a la propiedad. PELIGRO: Siga las siguientes instrucciones para prevenir situaciones inminentemente peligrosas que, si no se evitan, pueden producir la muerte o lesiones graves: S El UPS puede generar VOLTAJES LETALES. Toda reparación y servicio deberá ser realizado EXCLUSIVAMENTE POR PERSONAL DE SERVICIO AUTORIZADO. NO HAY PIEZAS REPARABLES POR EL USUARIO dentro del UPS o del EBM. La información contenida en este documento está sujeta a cambiar sin previo aviso. E 2012 Dell Inc. Todos los derechos reservados. Queda estrictamente prohibida la reproducción, en cualquier tipo de soporte, sin el consentimiento previo por escrito de Dell Inc. Marcas comerciales utilizadas en este texto: Dell y el logotipo de DELL son marcas comerciales de Dell Inc. El nombre ENERGY STAR es una marca comercial registrada propiedad de la Agencia de Protección Ambiental de los Estados Unidos. Es posible que en este documento se utilicen otras marcas y nombres comerciales para hacer referencia a las entidades que reivindican dichas marcas y nombres o a sus productos. Dell Inc. niega cualquier interés en el derecho de propiedad de las marcas y nombres comerciales, a excepción del propio. Diciembre de 2012 Características del sistema Dado que brindan rendimiento y confiabilidad sobresalientes, los beneficios exclusivos del UPS incluyen: S Diseño de UPS en línea con salida de onda senoidal pura. S Tecnología de doble conversión real en línea con densidad de alta energía, independencia de frecuencia de servicio y compatibilidad del generador. S Regulación del aumento y la reducción de voltaje que garantiza un voltaje constante para la carga, al corregir fluctuaciones. S El UPS filtra y regula el voltaje de CA entrante y suministra energía uniforme al equipo sin agotar la batería. S Modo de operación de Alta Eficiencia seleccionable. S Altura del UPS 5U. S Función de encendido en batería para alimentar el UPS aun cuando no haya suministro eléctrico disponible. S El mantenimiento se simplifica al permitir un reemplazo seguro de las baterías sin apagar el UPS. S La información de etiqueta de servicio de Dell puede leerse desde la pantalla LCD del panel delantero. S Tiempo de ejecución extendido con un Extended Battery Module (EBM) opcional. S Control de apagado de emergencia a través de los puertos de apagado remoto de emergencia (REPO). S Dos puertos de comunicación estándar (USB y puerto serie RS--232). S Dell Network Management Card opcional (también conocida como NMC) con capacidades de comunicación mejoradas para aumentar la protección y el control de la energía. S Environmental Monitoring Probe (EMP) opcional para recabar lecturas de temperatura y humedad en el ambiente del bastidor y monitoreo de información ambiental a distancia. Además, puede recabar y recuperar el estado de dos dispositivos con contacto provistos por el usuario. S Administración de energía avanzada con las aplicaciones de software Dellt Multi--UPS Management Console (MUMC) and Dellt UPS Local Node Manager (ULNM) basadas en la red para apagados apropiados y monitoreo de energía. S Apagado secuencial y gestión de carga mediante grupos de receptáculos separados denominados segmentos de carga. S Firmware que se actualiza fácilmente sin necesidad de llamar al servicio técnico. S Respaldado por las aprobaciones de agencias de todo el mundo. S UPS certificados ENERGY STAR®. Características del sistema | 111 Búsqueda de información PRECAUCIÓN: El documento Información ambiental, normativa y de seguridad brinda información de seguridad y regulatoria importante. ¿Qué está buscando? S La guía del usuario para mi UPS Encuéntrelo aqu¨ Disco del UPS de Dell S La guía del usuario para la Dell Network Management Card S Dell MUMC and Dell ULNM Guías del usuario NOTA: Puede encontrar documentación y actualizaciones de software en www.support.dell.com y en www.dellups.com. S Especificaciones Guía del usuario del UPS de Dell S Cómo configurar los valores del UPS La guía del usuario está disponible en el disco Dell UPS y en www.support.dell.com. S Cómo localizar averías y resolver los problemas S Cómo instalar el control REPO S Instrucciones de seguridad Información ambiental, normativa y de seguridad S Información reglamentaria S Información sobre reciclaje S Información sobre garantía Información sobre soporte y garantía de Dell S Términos y condiciones (solo EE.UU.) S Acuerdo de licencia del usuario final S Información sobre soporte Sitio web de soporte de Dell â www.support.dell.com NOTA: Seleccione su región y ramo de la industria para consultar el sitio de soporte apropiado. 112 | Búsqueda de información Instalación y arranque PRECAUCIÓN: Antes de realizar los procedimientos en este documento, lea y observe las instrucciones de seguridad e información regulatoria importante en su documento Información ambiental, normativa y de seguridad. PRECAUCIÓN: Desempacar el gabinete en un ambiente con baja temperatura puede ocasionar la condensación dentro del gabinete o sobre éste. No instale el gabinete hasta que el interior y el exterior del mismo estén completamente secos (existe riesgo de descarga eléctrica). PRECAUCIÓN: La instalación o remoción de las bandejas de baterías deberá ser realizada o supervisada por personal capacitado en el manejo de baterías y las precauciones requeridas para lo mismo. Mantenga las baterías fuera del alcance del personal no autorizado. Instalación y arranque | 113 PRECAUCIÓN: El gabinete es pesado (99 kg/218 lb). Retire siempre ambas bandejas de baterías del UPS antes de elevar el gabinete. Levantar la cabina al bastidor requiere de un mínimo de dos personas. PRECAUCIÓN: Las baterías son pesadas (32 kg/71 lb). Utilice las técnicas de levantamiento apropiadas cuando retire las baterías. NOTA: Tenga mucho cuidado al trasladar y abrir la caja de cartón. Deje los componentes embalados hasta que esté listo para instalarlos. En la presente sección, se describen los pasos para configurar el sistema por primera vez. Cómo desempacar el gabinete Para desempacar el sistema: 1 Con un montacargas o un gato para tarimas, mueva la caja de envío y la tarima cerca del bastidor donde instalará el UPS. 2 Desprenda y quite la caja exterior. 114 | Instalación y arranque 3 Retire las dos cajas con accesorios que se encuentran dentro de los canales en la sección superior de Styrofoam. 4 Abra las cajas de accesorios y colóquelas cerca en una superficie plana y estable. NOTA: La Guía del usuario de UPS 10 kW de rack en línea Dell proporciona procedimientos de desembalaje e instalación. Para consultarla, retírela de la caja de accesorios antes de desechar las cajas. 5 Retire la sección superior de Styrofoam y colóquela cerca en una superficie plana y estable. Instalación y arranque | 115 NOTA: Las escuadras de soporte de la batería están etiquetadas con L (izquierda) y R (derecha) para indicar dónde deben instalarse. 6 Retire ambas escuadras de soporte del UPS: Localice las escuadras de soporte del lado izquierdo (marcado con una L). Del lado izquierdo del chasis, gire el tornillo de mariposa hacia la izquierda para liberar la escuadra de soporte izquierda. Empuje la escuadra hacia el poste central para desengancharla del chasis. Debe balancear la escuadra hacia usted y jalar la escuadra hacia la izquierda para retirarla. Ponga la escuadra a un lado. Localice la escuadra de soporte del lado derecho (marcada con una R). Del lado derecho del chasis, gire el tornillo de mariposa hacia la izquierda para liberar la escuadra de soporte derecha. Empuje la escuadra hacia el poste central para desengancharla del chasis. Debe balancear la escuadra hacia usted y jale la escuadra hacia la derecha para retirarla. Ponga la escuadra a un lado. 7 Asegúrese que todos los conectores de la batería estén desconectados. 116 | Instalación y arranque PRECAUCIÓN: Las baterías son pesadas (32 kg/71 lb). Utilice las técnicas de levantamiento apropiadas cuando retire las baterías. 8 Retire las bandejas de baterías del UPS: Retire los conectores desconectados de la batería UPS que se encuentran en la parte superior del compartimiento de la batería. Sujete las dos lengüetas de aro de plástico al frente de la bandeja para baterías. Jale la bandeja hacia usted para retirarla. NOTA: Las etiquetas naranjas de JALE AQUÍ indican dónde agarrar las lengüetas del aro. Coloque la bandeja para baterías sobre la sección de Styrofoam que retiró de la parte superior del UPS. Repita el proceso con la segunda bandeja para baterías. Instalación y arranque | 117 PRECAUCIÓN: El gabinete es pesado (46 kg/ 101 lb) sin baterías. Para levantar el gabinete desde la caja de embarque se requiere un mínimo de dos personas. 9 Con una persona de cada lado, levante con cuidado el gabinete fuera del Styrofoam utilizando las agarraderas en el cartón. 10 Coloque el gabinete sobre una superficie plana y estable en un área protegida cerca del bastidor donde lo instalará. NOTA: Asegúrese que el área tiene flujo de aire adecuado y que esté libre de humedad, gases inflamables y corrosión. 118 | Instalación y arranque Configuración del montaje en bastidor PRECAUCIÓN: El gabinete es pesado (99 kg/218 lb). Retire siempre ambas bandejas de baterías del UPS antes de elevar el gabinete e instalar el UPS en los rieles del bastidor. Para levantar los gabinetes y colocarlos en el bastidor se necesitan al menos dos personas. PRECAUCIÓN: La instalación o remoción de las baterías deberá ser realizada o supervisada por personal capacitado en el manejo de baterías y en las precauciones requeridas para lo mismo. Mantenga las baterías fuera del alcance del personal no autorizado. PRECAUCIÓN: Las baterías son pesadas (32 kg/71 lb). Utilice las técnicas de levantamiento apropiadas cuando retire las baterías. PRECAUCIÓN: Si instala un EBM opcional, el EBM se debe colocar debajo del UPS sin espacio en U entre el UPS y el EBM. Esto ofrece una mejor distribución de peso en el bastidor, un acceso más fácil al panel de control del UPS y a dirigir más fácilmente las conexiones de cables de las baterías. Esto también evita tensión entre el cable del EBM y la conexión del UPS y una posible falla de conexión. ADVERTENCIA: Para sistemas montados en bastidor: Cuando instale múltiples sistemas en un bastidor, realice todos los procedimientos para el sistema actual antes de intentar instalar el siguiente sistema. NOTA: Cada gabinete requiere rieles de montaje. NOTA: El gabinete se envía sin el bisel de la cubierta delantera incorporado. NOTA: Las siguientes instrucciones son las mismas que para los bastidores de orificios cuadrados y los bastidores de orificios redondos y sin rosca. Los rieles sirven para ambos estilos de bastidores. Para instalar el UPS en un bastidor: 1 Asegúrese que los siguientes elementos sean colocados sobre una superficie plana y estable cerca del bastidor donde instalará el UPS: S gabinete S dos cajas de accesorios del UPS S dos bandejas de baterías (solo de UPS) S dos escuadras de soporte de baterías (solo de UPS) Instalación y arranque | 119 Instalación de los rieles 2 Retire los rieles de la caja de accesorios de juego de rieles. 3 Seleccione los orificios adecuados en el riel para colocar el gabinete en la ubicación deseada en el bastidor. Localice los rieles en la parte inferior del espacio 5U asignado para el UPS. PRECAUCIÓN: Si instala un EBM opcional, asegúrese de instalar el EBM directamente debajo del UPS sin espacio en U entre el UPS y el EBM. NOTA: Observe las etiquetas en los rieles para frente derecho (etiquetado con RIGHT FRONT) y frente izquierdo (etiquetado con LEFT FRONT). Esta es la forma en que se deben colocar los rieles para la instalación. 4 Coloque los rieles izquierdo y derecho como se muestra. Fije los rieles izquierdo y derecho al bastidor: Acople el extremo posterior del riel hasta que se asiente completamente sobre la brida del bastidor vertical y el pestillo del gancho se cierre en el lugar. Tire del riel pasando el frente del bastidor. Empuje el extremo delantero del riel hasta que se asiente completamente sobre la brida del bastidor vertical y el pestillo del gancho se cierre en el lugar. 120 | Instalación y arranque Cómo instalar y asegurar el gabinete PRECAUCIÓN: El gabinete es pesado (46 kg/ 101 lb) sin baterías. Levantar la cabina al bastidor requiere de un mínimo de dos personas. 5 Deslice el gabinete sobre los rieles y en el bastidor. 6 Asegure el frente del gabinete al bastidor con los cuatro tornillos de mariposa de las escuadras de montaje. Apriete los tornillos en el sentido de las manecillas del reloj; no utilice herramientas eléctricas. Instalación de las bandejas de las baterías Instalación y arranque | 121 7 Localice las bandejas de baterías que colocó cerca del bastidor. PRECAUCIÓN: Las baterías son pesadas (32 kg/71 lb). Utilice las técnicas de levantamiento apropiadas cuando instale las baterías. NOTA: Las bandejas para baterías pueden ser instaladas en cualquiera de los compartimientos para baterías. NOTA: Inserte la bandeja con la flecha de etiqueta de precaución apuntando hacia arriba. 8 Instale las bandejas de baterías: Retire los conectores de la batería UPS que se encuentran en la parte superior del compartimiento de la batería. Deslice la bandeja de baterías en el compartimiento de baterías completamente. Repita el proceso para instalar la segunda bandeja para baterías. 9 Meta las lengüetas de aro en la funda de plástico en la parte delantera de cada bandeja para baterías para quitarlas de en medio. Conexión de los conectores internos de la batería 10 Conecte los conectores internos de la batería: Conecte el conector de la bandeja de baterías izquierdo más alejado al conector fijo del UPS. Conecte el conector de la bandeja de baterías derecho más alejado al conector fijo del UPS. NOTA: Al conectar las baterías, es posible que se forme un arco pequeño. Esto es normal y no daña la unidad ni representa ninguna preocupación en cuanto a la seguridad. Localice y conecte los puentes de baterías que se ubican en los lados del poste central. Coloque los conectores en el anaquel pequeño en la parte superior del poste central. 122 | Instalación y arranque NOTA: Al conectar los puentes de la batería central se conectan en serie las dos bandejas para baterías. Cómo reemplazar las escuadras de soporte de las baterías Canal lateral del chasis Canal lateral del poste central NOTA: Las escuadras de soporte de la batería están etiquetadas con L (izquierda) y R (derecha) para indicar dónde deben instalarse. 11 Reemplace las escuadras de soporte de la batería izquierda (L) y derecha (R): Para la primera escuadra de soporte de la batería, inserte la lengüeta de la escuadra en el canal del lado del poste central. Acomode con cuidado los cables de la batería detrás de la escuadra de soporte. Alinee el extremo de la escuadra de soporte de la batería con el canal lateral del chasis. Empuje la escuadra hasta que quede asentada firmemente en el canal lateral. Gire la perilla en el sentido de las manecillas del reloj para asegurar la escuadra. Repita el procedimiento para volver a colocar la segunda escuadra de soporte de la batería. Instalación y arranque | 123 Instalación de la cubierta delantera del UPS 12 Retire la cubierta delantera de la caja de accesorios. NOTA: Conserve el CD del software, el cable de comunicación y (si es necesario) los conectores REPO en la caja de accesorios hasta que instale el UPS. 1 2 13 Instale la cubierta delantera del UPS: Alinee la cubierta delantera con el frente del chasis. Inserte las lengüetas del lado derecho en la cubierta delantera dentro de las aberturas para lengüetas del chasis del lado derecho. Empuje el lado izquierdo de la cubierta hacia delante y presiónela hasta que encaje en el chasis. 124 | Instalación y arranque NOTA: Asegúrese de que el panel de la LCD del chasis del UPS se alinee con la ventana LCD de la cubierta delantera antes de asegurar la cubierta al chasis. 14 Deseche o recicle el embalaje de manera responsable o guárdelo para referencia futura. Conexión del equipo Para instalar el UPS: 1 Si planea usar el software Dell MUMC and Dell ULNM, establezca comunicación de una de las siguientes maneras: S mediante el uso de la Dell Network Management Card (si está instalada) S mediante el uso del cable suministrado para conectar su computadora al puerto USB. NOTA: Para obtener más información sobre las opciones de comunicación, consulte la Guía del usuario de UPS 10 kW de rack en línea Dell. 2 Si el bastidor tiene conductores para la conexión a tierra o puenteo de las piezas de metal, conecte el cable a tierra (no suministrado) al tornillo de puenteo. Consulte âPaneles posteriores del UPSâ en la página 132 para ubicar el tornillo de fijación a tierra de cada uno de los tres modelos. 3 Si los códigos locales solicitan un apagado (desconexión) de emergencia, consulte âInstalación de apagado de emergencia remotoâ en la Guía del usuario de UPS 10 kW de rack en línea Dell. 4 Si está instalando un EBM opcional, consulte las instrucciones de instalación en la Guía de inicio de EBM 10 kW de rack en línea Dell. PRECAUCIÓN: Si el UPS se almacena o usa sin un EBM, la cubierta del conector de batería en el panel posterior del UPS debe estar instalada como medida de precaución. 5 Enchufe el equipo para que esté protegido en los receptáculos exteriores del UPS pero no encienda el equipo protegido. 6 Realice todas las provisiones necesarias para retener los cables y colocar los tubos pasacables. NOTA: Verifique que los regímenes totales del equipo no excedan la capacidad del UPS para prevenir una alarma de sobrecarga. Instalación y arranque | 125 Cableado de entrada al UPS ADVERTENCIA: Riesgo de descargas eléctricas. Solo el personal en servicios de reparación calificado (tales como electricistas con licencia) podrán realizar la conexión eléctrica. Los modelos Dell Rack en línea cableados requieren un circuito derivado dedicado que cumpla con los siguientes requerimientos: S El dispositivo de protección necesita un dispositivo de desconexión de dos polos entre la entrada del UPS y las redes eléctricas S El disyuntor se debe montar en la pared y debe estar accesible para el operador S Para Europa. El disyuntor debe cumplir con la norma IEC/EN 60934 y con el espacio de aire de contacto de al menos 3 mm S 200--240 Vca S Monofásico S 50/60 Hz S Conducto de metal flexible (recomendado para facilitar el servicio y el mantenimiento) Pared Disyuntor de dos polos Línea Red de CA UPS Neutral/L2 126 | Instalación y arranque Extracción de la cubierta del bloque de terminales Orificio ciego Cubierta de bloque de terminales 1 Apague el suministro eléctrico en el punto de distribución donde estará conectado el UPS. Asegúrese bien de que no haya corriente. 2 Retire la cubierta del bloque de terminales (dos tornillos) y consérvela. 3 Abra los orificios ciegos de la cubierta del bloque de terminales para el conducto de entrada. En el orificio debe caber un conducto metálico intermedio (IMC) de 1â o 1.5â (25.4 mm o 38.1 mm). Instalación y arranque | 127 PRECAUCIÓN: Si el UPS no tiene un dispositivo de protección automática contra retroalimentación de corriente, instale un dispositivo de aislamiento externo. Una vez que se instale el dispositivo, debe agregar una etiqueta de advertencia con el siguiente texto o el equivalente en el contactor AC externo. RIESGO DE RETROALIMENTACIÓN DE VOLTAJE. Aísle el UPS antes de poner en funcionamiento este circuito, luego revise el voltaje peligroso entre todas las terminales. Panel de distribución externo Q UPS A L/L1 L/L1 N/L2 N/L2 Leyenda B Q A N/L2 L/L1 Interruptor remoto con bobina Entrada térmica de imán Interruptor principal Contactor de CA Neutral/L2 Entrada de l\xednea L1 B La siguiente tabla enumera los dispositivos de protección de retroalimentación (conectores de AC) que se pueden utilizar como dispositivo de aislamiento externo para la protección de retroalimentación. Utilice solo los contactores de CA enumerados en la tabla. Fabricante Tipo Especificación A75--30 220â240 Vca, 105 A 25 HP a 208 V, 30 HP a 240 V Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (alternativo) GSC1(CJX4--d)--6511 220â240 Vca, 68A 25 HP Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (alternativo) GSC1(CJX4--d)--8011 220â240 Vca, 80A 30 HP ABB France (E12527) NOTA: Aunque el UPS no contiene relevadores de protección contra retroalimentación (ABF), se ofrece cierta medida de protección contra la misma. Por ejemplo, si algunos componentes resultan dañados en el modo de batería, el voltaje de salida puede ser retroalimentado a la entrada. En este caso, se usa un transformador de corriente (CT) para detectar el voltaje de retroalimentación de corriente de derivación. Si se detecta una condición de fallo de retroalimentación de corriente, el UPS terminará la salida del inversor para evitar lesiones personales. 128 | Instalación y arranque Instalación de los cables a tierra y de salida 1 2 3 4 Tire del cable de entrada a través del conducto, dejando unos 2 pies (0.5m) de cable expuesto. Sujete una conexión de metal flexible al extremo del conducto. 5 Introduzca el conducto a través del cableado de entrada de acceso y conecte el conducto adecuado para el panel. Pele 0.5â (1.5 cm) de aislante del extremo de cada cable de acometida. 6 Conecte los cables de entrada y a tierra al bloque de terminales de acuerdo a las Especificaciones de cableado del UPS de la siguiente tabla. Función del Cableado Entrada Posición del terminal Función del cable del UPS 1 Puesta a tierra de entrada 2 En L2/Neutral 3 L1 pulg Valores del tamaño del cable para terminales * Torsión de tensión 16--35 mm2 (8--2 AWG) 1.7 Nm (15 lb--in) * Use un mínimo: S 8 AWG para cable de puesta a tierra de equipo, 75_C mínimo cable de cobre S 4 AWG para cables de línea de entrada y neutro, 75_C mínimo cable de cobre 7 Vuelva a colocar la cubierta del bloque terminal. Instalación y arranque | 129 Arranque del UPS Botón Encendido/Apagado Para iniciar el UPS: 1 Verifique que las baterías internas estén conectadas. 2 Si un EBM opcional está instalado, verifique que el EBM esté conectado al UPS. Consulte la Guía de inicio de EBM 10 kW de rack en línea Dell para más información. 3 Compruebe que todos los interruptores del circuito del segmento de carga se encuentren en la posición de ENCENDIDO. 4 Encienda el interruptor principal del suministro eléctrico. La pantalla del panel LCD del UPS se ilumina. La pantalla de reinicio de Dell cambia a la pantalla de resumen de estado UPS. La pantalla del panel delantero del UPS muestra el icono Standby (espera) . parpadeando 5 Presione el botón On/Off (Encendido/Apagado) del panel delantero del UPS. Después de finalizar el arranque, el estado cambia de acuerdo con el modo operativo del UPS. 130 | Instalación y arranque 6 En la pantalla de resumen de estado del UPS, presione el botón para verificar las alarmas y los avisos activos. Resuelva todas las alarmas activas antes de continuar. Consulte âResolución de problemas en la Guía del usuario de UPS 10 kW de rack en línea Dell. Si no hay ninguna alarma activa, se muestra el mensaje âNo Alarmas Activasâ. 7 Verifique que el icono normal aparezca en la pantalla de resumen de estado del UPS e indique que el UPS está funcionando normalmente y que cualquier carga está energizada. 8 Consulte en la Guía del usuario de UPS 10 kW de rack en línea Dell lo siguiente: S Para procedimientos de configuración si está instalado un módulo de batería extendida opcional (EBM) S Para establecer la hora y la fecha y para cambiar otros valores predeterminados de fábrica: 9 Si instaló un REPO opcional, pruebe la función REPO: Active el interruptor REPO externo. Verifique el cambio de estado en la pantalla del UPS. Desactive el interruptor REPO externo y reinicie el UPS. 10 Cambie las baterías. NOTA: Las baterías internas se cargan al 90% de su capacidad en menos de tres horas. Sin embargo, debe cargarlas durante 48 horas después de la instalación o de un almacenamiento prolongado. PRECAUCIÓN: Conecte una carga a la vez y asegúrese que cada dispositivo protegido arranque por completo antes de que conecte la siguiente carga para evitar una condición de sobrecarga del UPS. NOTA: Dell recomienda establecer la fecha y la hora para la resolución de problemas o para fines de garantía. Instalación y arranque | 131 NOTA: En el arranque inicial, el UPS establece la frecuencia del sistema de acuerdo a la frecuencia de la línea de entrada (la detección automática de frecuencia de entrada está habilitada de forma predeterminada) Después del arranque inicial, la detección automática se desactiva hasta que se active manualmente con la configuración de frecuencia de salida. NOTA: En el arranque inicial, la detección automática de voltaje de entrada se habilita de forma predeterminada. Después del arranque posterior, la detección automática se desactiva hasta que se active manualmente con la configuración de voltaje. Identificación de paneles posteriores del UPS Esta sección ilustra los paneles traseros de las tres opciones de modelo UPS Dell Rack en línea 10 kW. 10 kW 208V UPS (DELL10KWOLHVUS) Compartimiento de comunicación del UPS Una salida NEMA L6-30R Puerto Puerto RS-232 USB Dos salidas IEC 320-C19 Dos interruptores del circuito de salida Segmento de carga 1 (LS1) 132 | Instalación y arranque Tornillo con conexión a tierra Puertos Conector REPO EBM Una salida NEMA L6-30R Dos salidas IEC 320-C19 Dos interruptores del circuito de salida Segmento de carga 2 (LS2) Bloque terminal de entrada 10 kW 230V UPS (DELL10KWOLHV) Compartimiento de comunicación del UPS Puerto Puerto RS-232 USB Dos Dos receptáculos Un receptáculo IEC interruptores IEC 320-C19 60309 332R6S del circuito de salida Segmento de carga 1 (LS1) Puertos REPO Conector EBM Un interruptor del circuito de salida Un recept\xe1culo IEC 60309 332R6S Tornillo con conexión a tierra Bloque terminal de entrada Segmento de carga 2 (LS2) Instalación y arranque | 133 10 kW 230V UPS (DELL10KWOLHVB) Compartimiento de comunicación del UPS Puerto RS-232 Dos interruptores del Cuatro receptáculos IEC 320-C19 circuito de salida Segmento de carga 1 (LS1) 134 | Instalación y arranque Puerto Puertos Conector USB REPO EBM Dos interruptores del Cuatro receptáculos IEC 320-C19 circuito de salida Segmento de carga 2 (LS2) Tornillo con conexión a tierra Bloque terminal de entrada Dellt åšçº¿æºæ¶åŒ UPS 10 kW ç³»ç»äœ¿çš å ¥éšæå DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com 泚æåèŠå 泚æïŒ âæ³šæâ衚瀺å¯åž®å©æšæŽå¥œäœ¿çšæ¬èœ¯ä»¶çéèŠä¿¡æ¯ã å±é©ïŒ âå±é©â衚瀺玧æ¥å±é©æ åµïŒåŠæäžå 以é¿å ïŒå°å¯ŒèŽæ»äº¡æäž¥éç䌀害ã èŠåïŒ âèŠåâ衚瀺æœåšå±é©æ åµïŒåŠæäžå 以é¿å ïŒå¯èœäŒå¯ŒèŽæ»äº¡æäŒ€å®³ã å°å¿ïŒ âå°å¿â衚瀺æœåšå±é©æ åµïŒåŠæäžå 以é¿å ïŒå¯èœå¯ŒèŽèœ»åºŠæäžåºŠäŒ€å®³ïŒæèŽ¢äº§æå€±äºæ ã å±é©ïŒ éµå®äžåé¡»ç¥æå©äºé²æ¢çާæ¥å±é©æ åµåçïŒè¯¥æ åµè¥äžå 以é¿å ïŒå°å¯ŒèŽæ»äº¡æäž¥éçäŒ€å®³ïŒ S æ¬ UPS äžå«æ èŽåœæ§çµå. ææç»Žä¿®åæ£ä¿®å·¥äœéœåªåºç± æææ£ä¿®äººå宿œ. æ¬ UPS äž æ²¡æçšæ·å¯èªè¡ç»Žä¿®çéšä»¶ æ EBMã æ¬æä»¶æå«ä¿¡æ¯åŠææŽæ¹ïŒæäžåŠè¡éç¥ã E 2012 Dell Inc. ä¿çæææå©ã æªç» Dell Inc. 乊é¢è®žå¯ïŒäž¥çŠä»¥ä»»äœåœ¢åŒè¿è¡å€å¶ã æ¬æäžäœ¿çšçåæ ïŒDell å DELL åŸœæ æ¯ Dell Inc. çåæ ã èœæºä¹æ (ENERGY STAR) æ¯çŸåœç¯ä¿çœ²ææ¥æç泚ååæ ã æ¬æä»¶äžå¯èœäŒçšå°å ¶ä»åæ ååååç§°æç§°å¯¹è¿äºåæ ååç§°æå ¶äº§åæ¥ææææçäŒäžå®äœã Dell Inc. 对äžå±äºèªå·±çåæ ååååç§°æåžŠæçäžæå©çïŒäžè¡äœ¿ä»»äœæ¥ææã 2012 幎 12 æ ç³»ç»ç¹æ§ 该 UPS å¯æäŸæ¥è§Šçæ§èœäžå¯é æ§ïŒå æ¬äžäžç¬ç¹çäŒå¿ïŒ S å ·æçº¯æ£åŒŠæ³¢èŸåºçåšçº¿åŒ UPS 讟计ã S çæ£åšçº¿åèœ¬æ¢ææ¯ïŒæäŸé«åçå¯åºŠïŒäžååžçµé¢ç圱åïŒå¯å Œå®¹åç§åçµæºã S éåäžååè°èïŒéè¿çº æ£çµåæ³¢åšç¡®ä¿è°èåççµåèœäžæšççšçµè®Ÿå€çžéåºã S UPS éè¿æ»€æ³¢åè°èèŸå ¥ç亀æµçµïŒä»è䞺æšçè®Ÿå€æäŸçš³å®ççµåïŒæ éæ¶èçµæ± ççµåã S å¯éæ©â髿âå·¥äœæš¡åŒã S 5U UPS é«åºŠã S å³äœ¿æ²¡æå ¬çšçµæºïŒçµæ± å¯åšåèœä¹èœç» UPS äŸçµã S äžå¿ å ³é UPS å³å¯å®å šæŽæ¢çµæ± ïŒå æ€ç»Žæ€æäœéåžžç®äŸ¿ã S Dell æå¡æ çäžçä¿¡æ¯å¯ä»æ£é¢æ§å¶é¢æ¿äžç LCD æŸç€ºå±äžè¯»åå°ã S éè¿å¯éé çExtended Battery Module (EBM) å¯å»¶é¿å ¶å·¥äœæ¶éŽã S éè¿è¿çšçµæºçާæ¥å ³é (REPO) 端å£å¯å®ç°åºæ¥åæºæ§å¶ã S 垊æäž€äžªæ åé信端å£ïŒUSB å RS-232 äž²è¡ç«¯å£ïŒã S å¯éé Dell Network Management CardïŒä¹ç§°äžº NMCïŒïŒè¿æ ·å¯å¢åŒºéä¿¡åèœïŒä»èå¯è·åŸæŽåŒºççµæºä¿æ€åæ§å¶ã S å¯éé Environmental Monitoring Probe (EMP)ïŒçšæ¥ééæ¡æ¶ç¯å¢äžçæž©åºŠåæ¹¿åºŠè¯»æ°ïŒå¹¶è¿çšçæ§ç¯å¢æ°æ®ã æšè¿å¯ä»¥ééåè·å䞀䞪ç±çšæ·æäŸçæ¥è§Šè®Ÿå€çç¶æã S å¯äœ¿çš Dellt Multi-UPS Management Console (MUMC) and Dellt UPS Local Node Manager (ULNM) åºäº Web çåºçšèœ¯ä»¶è¿è¡é«çº§çµæºç®¡çïŒä»èå®ç°å¹³æ»å ³æºåçµæºçæ§ã S å©çšè¢«ç§°äœèŽè·æ®µçåç¬ç«çæåº§ç»å®ç°é¡ºåºå ³æºåèŽèœœç®¡çã S æ éæšææå¡éšéšççµè¯ïŒå³å¯èœ»æŸå¯¹åºä»¶è¿è¡å级ã S æäŸå šç代çè®€è¯æ¯æã S èœæºä¹æ (ENERGY STAR)® 讀è¯ç UPSã ç³»ç»ç¹æ§ | 137 æ¥æŸä¿¡æ¯ å°å¿ïŒ æ¬å®å šãç¯å¢åæ³è§æ§ä¿¡æ¯æä»¶æäŸäºéèŠçå®å šåæ³è§æ§ä¿¡æ¯ã æšèŠæ¥æŸä»ä¹æä»¶ïŒ S UPS çšæ·æå åšæ€æ¥æŸ Dell UPS å ç S Dell Network Management Card çšæ·æå S Dell MUMC and Dell ULNM çšæ·æå 泚æïŒ çžå ³ææ¡£åèœ¯ä»¶æŽæ°ïŒè¯·è®¿é® www.support.dell.com å www.dellups.comã S è§æ Œ Dell UPS çšæ·æå S UPS 讟眮çé çœ®æ¹æ³ çšæ·æåå¯ä» Dell UPS å çå www.support.dell.com äžè·åå°ã S è¯ææ éåè§£å³é®é¢çæ¹æ³ S REPO æ§å¶è£ 眮çå®è£ æ¹æ³ S å®å šæäœé¡»ç¥ å®å šæ§ãç¯ä¿åæ³è§æ§ä¿¡æ¯ S æ³è§æ§ä¿¡æ¯ S åæ¶å©çšä¿¡æ¯ S ä¿ä¿®ä¿¡æ¯ Dell ä¿ä¿®åæ¯æä¿¡æ¯ S æ¡æ¬Ÿåæ¡ä»¶ïŒä» éçŸåœïŒ S æç»çšæ·è®žå¯åè®® S æ¯æä¿¡æ¯ Dell ææ¯æ¯æçœç« â www.support.dell.com 泚æïŒ éæ©æšæå±çå°åºæè¡äžéšéšïŒ 以æ¥çåéçæ¯æçœç«ã 138 | æ¥æŸä¿¡æ¯ å®è£ åå¯åš å°å¿ïŒ åšæ§è¡æ¬æä»¶äžçæ¥éª€ä¹åïŒ è¯·å é 读åéµåŸªå®å šãç¯å¢åæ³è§æ§ä¿¡æ¯æä»¶äžçå®å šæäœè¯ŽæåéèŠçæ³è§æ§ä¿¡æ¯ã å°å¿ïŒ åšäœæž©ç¯å¢äžæåŒæºç®±å è£ å¯èœå¯ŒèŽæºç®±åå ¶å éšåçå·åç°è±¡ã è¯·åšæºç®±å å€å®å šå¹²ç¥ååå®è£ ïŒä»¥é²è§Šçµå±é©ïŒã å°å¿ïŒ çµæ± 座ççå®è£ ææé€åºç±çç¥çµæ± åæé泚æäºé¡¹ç人å宿œææå¯Œã æªç»ææç人åäžåŸæ¥è§Šçµæ± ã å°å¿ïŒ ç±äºæºç®±èŸé (99 kg/218 lb)ïŒ æ¬èµ·æºç®±å请å§ç»æé€äž€äžªçµæ± ç座ã å°æºç®±æ¬èµ·æŸå ¥æºæ¶è³å°éèŠäž€äžªäººã å®è£ åå¯åš | 139 å°å¿ïŒ ç±äºçµæ± èŸé (32 kg/71 lb)ã å æ€å»ºè®®åšæäžçµæ± æ¶äœ¿çšéåœçæ¬æ¬æå·§ã 泚æïŒ æ¬åšåæåŒè¿èŸç®±æ¶è¯·å°å¿è°šæ ã åšåç»ä»¶å¯ä»¥è¿è¡å®è£ ä¹åïŒä¿æå ¶å€äºå è£ ç¶æã æ¬èæè¿°éŠæ¬¡å®è£ ç³»ç»çæ¥éª€ã æºç®±æå æ¬ç³»ç»çå è£ æè§£ïŒ 1 䜿çšåèœŠææ¶²å蜊å°è¿èŸç®±åæçç§»åšå°æšå°èŠå®è£ UPS çå°æ¹éè¿ã 2 æçŠ»å¹¶ç§»èµ°å€è¿èŸç®±ã 140 | å®è£ åå¯åš 3 åäžå¡è¿é¡¶éšæ³¡æ²«èè¯ä¹ç¯æææ®µäžäž€äžªå¹æ§œå çéä»¶çã 4 æåŒéä»¶çå¹¶æŸåšéè¿å¹³æŽãå¹³åŠçå¹³é¢äžã 泚æïŒ Dell åšçº¿æºæ¶åŒ UPS 10 kW çšæ·æåç»åºäºå è£ æè§£åå®è£ çæ¥éª€ã èŠåèæ€æåïŒè¯·åšå°éä»¶çæŸåšäžèŸ¹ä¹åå°è¯¥æåä»éä»¶çäžååºã 5 å°é¡¶éšç泡沫èè¯ä¹ç¯éšååäžïŒæŸåšéè¿å¹³æŽã平皳çå¹³é¢äžã å®è£ åå¯åš | 141 泚æïŒ çµæ± åºå®æ¯æ¶äžåžŠæå·Šå³äŸ§æ è®° LïŒå·ŠïŒå RïŒå³ïŒïŒéè¿æ€ç§æ¹åŒæ 瀺åºäºå®è£ æ¶å®ä»¬å¿ é¡»äœäºçäœçœ®ã 6 ä» UPS äžåäžäž€äžªåºå®æ¯æ¶ïŒ æŸå°å·ŠäŸ§ïŒåžŠæ L æ è®°ïŒçåºå®æ¯æ¶ã åšæºç®±å·ŠäŸ§ïŒéæ¶é蜬åšç¿Œåœ¢èºé以æŸåŒå·Šåºå®æ¯æ¶ã å°æ¯æ¶åäžå€®ç«æ±æ¹åæšç§»ïŒä»¥äœ¿åŸæ¯æ¶äžæºç®±è±çŠ»ã å°æ¯æ¶æåèªå·±çæ¹åæèœ¬ïŒå¹¶åå·ŠæåšïŒä»¥å°å ¶æäžã å°æ¯æ¶æŸåšäžèŸ¹ã æŸå°å³äŸ§ïŒåžŠæ R æ è®°ïŒçåºå®æ¯æ¶ã åšæºç®±å³äŸ§ïŒéæ¶é蜬åšç¿Œåœ¢èºé以æŸåŒå³åºå®æ¯æ¶ã å°æ¯æ¶åäžå€®ç«æ±æ¹åæšç§»ïŒä»¥äœ¿åŸæ¯æ¶äžæºç®±è±çŠ»ã å°æ¯æ¶æåèªå·±çæ¹åæèœ¬ïŒå¹¶å峿åšïŒä»¥å°å ¶æäžã å°æ¯æ¶æŸåšäžèŸ¹ã 7 ç¡®ä¿ææçµæ± æ¥å€Žéœå·²æåŒè¿æ¥ã 142 | å®è£ åå¯åš å°å¿ïŒ ç±äºçµæ± èŸé (32 kg/71 lb)ã å æ€å»ºè®®åšæäžçµæ± æ¶äœ¿çšéåœçæ¬æ¬å·¥å ·ã 8 ä» UPS åäžçµæ± åº§ïŒ å°çµæ± çé¡¶éšå·²æåŒç UPS çµæ± è¿æ¥åšååºã ææ¡äœçµæ± çååéšäžç䞀䞪ç¯åœ¢å¡æçªèµ·ã æçèªå·±çæ¹ååŸå€æïŒå°å ¶ä» UPS äžæåºã 泚æïŒ æ©è²æåšæ€å€æ è®°æç€ºææ¡ç¯åœ¢çªèµ·çäœçœ®ã å°çµæ± çåæŸåšæšä¹åä» UPS é¡¶éšåäžçèè¯ä¹ç¯æ³¡æ²«äžã 对第äºäžªçµæ± ç座éå€ä»¥äžæ¥éª€ã å®è£ åå¯åš | 143 å°å¿ïŒ åäžçµæ± çæºç®±ä»ç¶åŸé (46 kg/101 lb)ã å æ€å°æºç®±æ¬èµ·æŸå ¥æºæ¶äžèŠæ±è³å°æäž€äžªäººå®æœã 9 äžäººäžèŸ¹äœ¿çšçºžæ¿äžçææå°å¿å°æºç®±ä»å€é¢çèè¯ä¹ç¯æ³¡æ²«äžååºïŒå¹¶æŸå°å¹³åŠãçš³å®çå¹³ é¢äžã 10 å°æºç®±æŸåšé è¿å°çšæ¥å®è£ æ¬ UPS çæºæ¶çåä¿æ€åºåå çå¹³åŠãçš³å®çå¹³é¢äžã 泚æïŒ ç¡®ä¿è¯¥åºåéé£è¯å¥œãå¹²ç¥äžäžååšæçæ§æ°äœåæ è èæ åµã 144 | å®è£ åå¯åš æºæ¶çå®è£ å°å¿ïŒ ç±äºæºç®±èŸé (99 kg/218 lb)ïŒ æ¬èµ·æºç®±å¹¶åšæºæ¶å¯Œèœšäžå®è£ UPS åïŒå§ç»å ä» UPS åäžäž€äžªçµæ± ç座ã å°æºç®±æ¬èµ·æŸå ¥æºæ¶è³å°éèŠäž€äžªäººå®æœã å°å¿ïŒ çµæ± çå®è£ ææäžåºç±çç¥çµæ± åæé泚æäºé¡¹ç人å宿œææå¯Œã æªç»ææç人åäžåŸæ¥è§Šçµæ± ã å°å¿ïŒ ç±äºçµæ± èŸé (32 kg/71 lb)ã å æ€å»ºè®®åšæäžçµæ± æ¶äœ¿çšéåœçæ¬æ¬å·¥å ·ã å°å¿ïŒ åŠæå®è£ å¯é EBMïŒEBM å¿ é¡»äœäº UPS äžæ¹ïŒå¹¶äž UPS å EBM ä¹éŽæ²¡æ U 空éŽã è¿æ ·èœç¡®ä¿åæºæ¶äžééååžæŽåçãæ¥è§Š UPS æ§å¶é¢æ¿æŽå®¹æïŒä»¥åæŽå®¹æè®Ÿè®¡çµæ± æ¥çº¿ç线路ã è¿æ ·è¿å¯ä»¥é¿å EBM 线å UPS è¿æ¥ä¹éŽäº§çåºå以åå¯èœçè¿æ¥æ éã èŠåïŒ å¯¹äºæºæ¶å®è£ çç³»ç»ïŒ åšæºæ¶äžå®è£ å€äžªç³»ç»æ¶ïŒå®æåœåç³»ç»çææçšåºç¶åå°è¯å®è£ äžäžäžªç³»ç»ã 泚æïŒ éèŠäžºæ¯äžªæºç®±å®è£ å¯Œèœšã æ³šæïŒ æºç®±æ¯åšåé¢çœ©æ¡æ¿æªå®è£ çç¶æäžè¿è¡è¿èŸçã æ³šæïŒ 以äžè¯Žæå¯¹äºæ¹åæºæ¶åæ èºçº¹ååæºæ¶æ¯çžåçã è¿äºå¯Œèœšå¹é è¿äž€ç§æºæ¶ã åšæºæ¶äžå®è£ UPSïŒ 1 ç¡®ä¿ä»¥äžéšä»¶è¢«æŸçœ®åšçšæ¥å®è£ æ¬ UPS çæºæ¶éè¿çå¹³åŠãçš³å®çå¹³é¢äž: S æºç®± S 䞀䞪 UPS éä»¶ç S äž€äžªçµæ± ç座ïŒä» UPSïŒ S äž€äžªçµæ± åºå®æ¯æ¶ïŒä» UPSïŒ å®è£ åå¯åš | 145 å®è£ 富蜚 2 å°å¯Œèœšä»å¯Œèœšå¥ä»¶çéä»¶çäžæäžã 3 åšå¯Œèœšäžéæ©åéçåå°æºç®±å®äœäºæºæ¶äžé¢å®çäœçœ®ã å°å¯Œèœšå®äœäºåé ç» UPS ç 5U 空éŽçåºéšã å°å¿ïŒ åŠæå®è£ å¯é EBMïŒEBM å¿ é¡»äœäº UPS äžæ¹ïŒå¹¶äž UPS å EBM ä¹éŽæ²¡æ U 空éŽã 泚æïŒ èŠç¡®å®åªæ¯å³åéšïŒæ è®°æå³åéšïŒååªæ¯å·ŠåéšïŒæ è®°æå·ŠåéšïŒïŒå¯è§å¯å¯Œèœšäžçæ çŸã è¿æ¯æŸçœ®å¯Œèœšè¿è¡å®è£ çæ¹æ³ã 4 æç §åŸç€ºçäœçœ®å¯¹å·Šå³å¯Œèœšè¿è¡å®äœã å°å·Šå³å¯Œèœšå®è£ å°æºæ¶äžå»ïŒ å®å富蜚çå端ïŒçŽå°å ¶å®å šå¡åšçºµåæºæ¶æ³å °äžïŒå¹¶äžé©ééå®åšå ¶äœçœ®äžã æåšå¯Œèœšåå¥œè¶ åºæºæ¶åéšã æšåšå¯Œèœšçå端ïŒçŽå°å ¶å®å šå¡åšæºæ¶çºµåæ³å °äžïŒå¹¶äžé©ééå®å°äœäžºæ¢ã 146 | å®è£ åå¯åš å®è£ ååºå®æºç®± å°å¿ïŒ åäžçµæ± çæºç®±ä»ç¶åŸé (46 kg/101 lb)ã å°æºç®±æ¬èµ·æŸå ¥æºæ¶è³å°éèŠäž€äžªäººã 5 å°æºç®±æ»å°å¯ŒèœšäžïŒç¶åæ»è³æºæ¶äžã 6 çšåºå®æ¶äžçå䞪翌圢èºéå°æºç®±å端åºå®å°å®è£ æºæ¶äžã çšæé¡ºæ¶éæ§çŽ§ç¿Œåœ¢èºéïŒäžèŠäœ¿çšçµåšå·¥å ·ã çµæ± ç座çå®è£ 7 å°æšååºççµæ± ç座æŸåšæºæ¶éè¿ã å°å¿ïŒ ç±äºçµæ± èŸé (32 kg/71 lb)ã å æ€å»ºè®®åšå®è£ çµæ± æ¶äœ¿çšéåœçæ¬æ¬å·¥å ·ã 泚æïŒ çµæ± ç座å¯å®è£ åšä»»æäžäžªçµæ± çäžã 泚æïŒ å°ç座æå ¥ïŒèŠåæ çŸç®å€Žæäžã å®è£ åå¯åš | 147 8 å®è£ çµæ± çåº§ïŒ å°çµæ± çé¡¶éšç UPS çµæ± è¿æ¥åšååºã å°çµæ± ç座å®å šæ»å ¥çµæ± çã 对第äºäžªçµæ± ç座éå€ä»¥äžæ¥éª€ã 9 å°ç¯åœ¢çªèµ·å¡å ¥å°æ¯äžªçµæ± ç座æ£é¢äžç塿å¥äžïŒä»¥å°è¿äºç¯åœ¢çªèµ·ç§»åŒïŒç»äžäžæ¥å®è£ è Ÿ åºç©ºéŽã çµæ± æ¥å€Žçè¿æ¥ 10 è¿æ¥å éšçµæ± è¿æ¥åšïŒ å°æå·Šç«¯çç座æ¥å€Žè¿æ¥å°åºå®ç UPS è¿æ¥åšãå°æå³ç«¯çç座æ¥å€Žè¿æ¥å°åºå®ç UPS è¿æ¥åšã 泚æïŒ è¿æ¥çµæ± æ¶å¯èœäŒåºç°å°éçµåŒ§ã è¿æ¯æ£åžžç°è±¡ïŒäžäŒæåæ¬è®Ÿå€æå¯ŒèŽä»»äœå®å šäžçæ å¿§ã æŸå°å¹¶è¿æ¥äžå€®ç«æ±ä»»äžäŸ§ççµæ± 跳线ãå°æ¥å€ŽæŸåšäžå€®ç«æ±é¡¶éšå€çå°ææ¶äžã 泚æïŒ è¿æ¥å¥œäžå€®çµæ± 跳线åïŒä»¥äž²èçæ¹åŒå°äž€äžªçµæ± çåº§è¿æ¥åšäžèµ·ã 148 | å®è£ åå¯åš çµæ± åºå®æ¯æ¶çæŽæ¢ æºç®±äŸ§é¢å¹æ§œ äžå€®ç«æ±äŸ§é¢å¹æ§œ 泚æïŒ çµæ± åºå®æ¯æ¶äžåžŠæå·Šå³äŸ§æ è®° LïŒå·ŠïŒå RïŒå³ïŒïŒéè¿æ€ç§æ¹åŒæ 瀺åºäºå®è£ æ¶å®ä»¬å¿ é¡»äœäºçäœçœ®ã 11 æŽæ¢å·ŠäŸ§ïŒL æ è®°ïŒåå³äŸ§ïŒR æ è®°ïŒçµæ± åºå®æ¯æ¶ïŒ 对äºç¬¬äžäžªçµæ± åºå®æ¯æ¶ïŒå°æ¯æ¶çªèµ·æå ¥äžå€®ç«æ±äŸ§é¢ç广§œäžã å°è¿æ¥å¥œççµæ± æ¥çº¿çŽ§èŽŽåšåºå®æ¯æ¶åé¢ã å°çµæ± åºå®æ¯æ¶çæ«ç«¯äžæºç®±äŸ§é¢ç广§œå¯¹éœã æšå𿝿¶çŽå°ç¢åºäœäºäŸ§é¢å¹æ§œäžã 顺æ¶éæèœ¬ç¿Œåœ¢èºéïŒä»¥å°æ¯æ¶åºå®ã æŽæ¢ç¬¬äºäžªçµæ± åºå®æ¯æ¶å¯éå€ä»¥äžæ¥éª€ã å®è£ UPS åç 12 å°åéšçœ©çä»éä»¶çäžååºã å®è£ åå¯åš | 149 泚æïŒ åšå®è£ UPS ä¹åäžèŠå°èœ¯ä»¶ CD å çãéä¿¡çŒçº¿ä»¥åïŒåŠæéèŠïŒREPO è¿æ¥åšä»éä»¶çäžååºã 1 2 13 å®è£ UPS åçïŒ å°åéšçœ©çäžæºç®±æ£é¢å¯¹æ£ã å°å眩çå³äŸ§çªèµ·æå ¥å³äŸ§æºç®±ççªèµ·åŒå£ã å°çœ©çç巊䟧ååæšïŒå°å ¶å¡åšæºç®±äžã 泚æïŒ å°çœ©çåºå®å°æºç®±äžä¹åïŒç¡®ä¿ UPS æºç®±äžç LCD æŸç€ºå±äžåéšçœ©çäžç LCD æŸç€ºå±çªæ¡å¯¹æ£ã 14 以èŽèޣ任çæåºŠå°å è£ äž¢åŒæåæ¶å©çšïŒæè æ¶èµ·åæŸä»¥å€å°æ¥äœ¿çšã 150 | å®è£ åå¯åš è¿æ¥è®Ÿå€ èŠå®è£ UPSïŒè¯·åšä»¥äžæ åµäžæ§è¡ä»¥äžæ¥éª€ïŒ 1 åŠææšèŠäœ¿çš Dell MUMC and Dell ULNM 蜯件ïŒè¯·æä»¥äžä»»äžæ¹æ³å»ºç«éä¿¡è¿æ¥ïŒ S äœ¿çš Dell Network Management Card ïŒåŠææå®è£ ïŒ S äœ¿çšææäŸç线çŒå°æšçè®¡ç®æºäž USB 端å£è¿æ¥ 泚æïŒ æŽå€å ³äºéä¿¡é项çä¿¡æ¯ïŒè§Dell åšçº¿æºæ¶åŒ UPS 10 kW çšæ·æåã 2 åŠææºæ¶åžŠææ¥å°æè¿æ¥äžæ¥å°éå±åç富äœïŒè¯·å°æ¥å°çº¿ïŒæªæäŸïŒäžæ¥å°èºéè¿æ¥ã åè§ç¬¬ 158 页çâUPS å颿¿âäºè§£è¿äžç§åå·æ¥å°èºéçäœçœ®ã 3 åŠæå°æ¹æ³è§èŠæ±äœ¿çšåºæ¥çµæºå ³éïŒæåŒïŒåŒå ³ïŒè¯·åè§ Dell åšçº¿æºæ¶åŒ UPS 10 kW çšæ·æåäžçâå®è£ è¿çšåºæ¥çµæºå ³éâã 4 åŠæå®è£ å¯é EBMïŒè¯·åè Dell åšçº¿æºæ¶åŒ 10 kW EBM å ¥éšæå äºè§£å®è£ 诎æã å°å¿ïŒ åŠæ UPS åšæ EBM çæ åµäžåšåæäœ¿çšïŒäœäžºäžé¡¹å®å šæªæœïŒå¿ é¡»åš UPS çå颿¿äžå®è£ çµæ± è¿æ¥åšæ€çã 5 å°éèŠä¿æ€çè®Ÿå€æå ¥å° UPS èŸåºæåº§äžïŒäžèŠå¯åšåä¿æ€è®Ÿå€ççµæºã 6 å奜ææå¿ èŠçå倿ªæœïŒä»¥åºå®çµæºçº¿å¹¶æ¶é€åºåçåºå®ååºåéæŸã æ³šæïŒ éªè¯è®Ÿå€çæ»é¢å®åŒäžè¶ è¿ UPS ç容éïŒä»¥é²æ¢åºç°è¿èœœèŠæ¥ã å®è£ åå¯åš | 151 UPS èŸå ¥ç«¯ç硬è¿çº¿ èŠåïŒ è§Šçµçå±é©ã çµæ°å®è£ å·¥äœåªèœç±åæ Œçæ£ä¿®äººåïŒäŸåŠæç §çµå·¥ïŒå®æœã Dell åšçº¿æºæ¶åŒå¯¹äºç¡¬è¿çº¿æºåïŒè¿éè¿æ¥æ»¡è¶³ä»¥äžèŠæ±çäžçšåæ¯çµè·¯ïŒ S ä¿æ€è®Ÿå€èŠæ±åš UPS èŸåºåäž»çµæºä¹éŽæäž€çžæåŒè®Ÿå€ S æè·¯åšå¿ é¡»å®è£ åšå¢å£äžïŒå¹¶äžäŸ¿äºæäœäººåè¿è¡æ¥è§Š S æ¬§æŽ²ã æè·¯åšå¿ 须笊å IEC/EN 60934 æ åïŒäžæ¥è§Šç©ºéè³å°äžº 3 mm S 200â240 Vac S åçž S 50/60 Hz S éå±èœ¯ç®¡ïŒæšè䜿çšïŒä»¥æ¹äŸ¿æ£ä¿®å绎æ€ä¿å »ïŒ å¢å£ åçžæè·¯ åš çµçº¿ 亀æµçµæº UPS é¶çº¿/L2 152 | å®è£ åå¯åš åäžæ¥çº¿ç«¯åæš¡åå€ç æ²æå æ¥çº¿ç«¯åæš¡åå€ç 1 åšè¿æ¥ UPS çå线ç¹å€å ³éåžçµçµæºã ç»å¯¹ç¡®ä¿æªéçµã 2 åäžæ¥çº¿ç«¯åæš¡åå€çïŒ2 䞪èºéïŒïŒå¹¶ä¿åã 3 åäžæ¥çº¿ç«¯åæš¡åå€çäžçšäºèŸå¯Œç®¡çæ²æåã æ€åå ¶ååŸå¿ é¡»èœå®¹çº³ 1âæ 1.5âïŒ25.4 mm æ 38.1 mmïŒçäžéŽéå±å¯Œç®¡ (IMC)ã å®è£ åå¯åš | 153 å°å¿ïŒ åŠæ UPS 没æéå¯¹çµæµåéŠçèªåšä¿æ€è®Ÿå€ïŒè¯·å®è£ å€éšç»çŒè®Ÿå€ã 讟å€å®è£ åïŒå¿ é¡»åšå€éšäº€æµæ¥è§ŠåšäžèŽŽéäžäžªåæä»¥äžè¯å¥æç±»äŒŒå 容çèŠåæ çŸïŒ å±é©ïŒ çµå åäŸã åšå¯¹æ€çµè·¯æäœåå° UPS é犻ïŒç¶åæ£æ¥ææç«¯åä¹éŽæ¯åŠååšå±é©çµåã å€é çµæ¿ UPS åŸäŸ Q T L/L1 L/L1 N/L2 N/L2 B Q T N/L2 L/L1 线åè¿çšåŒå ³ ç£çèŸå ¥ äž»åŒå ³ AC æ¥è§Šåš é¶çº¿/L2 L1 èŸå ¥çº¿ B äžè¡šååºå¯çšäœå€éšé犻讟å€ä»¥è¿è¡ååéŠçµä¿æ€çååéŠçµä¿æ€è®Ÿå€ïŒAC æ¥è§ŠåšïŒã ä» äœ¿çšè¡šäžååºç AC æ¥è§Šåšã ç±»å é¢å®åŒ A75-30 220â240 Vac, 105A 25 HP 208V, 30HP 240V 倩氎äºäžäžçµåšæéå ¬åž (E203071) ïŒæ¿ä»£ïŒ GSC1(CJX4-d)-6511 220â240 Vac, 68A 25 HP 倩氎äºäžäžçµåšæéå ¬åž (E203071) ïŒæ¿ä»£ïŒ GSC1(CJX4-d)-8011 220â240 Vac, 80A 30 HP å¶é å ABB France (E12527) 泚æïŒ å°œç®¡æ¬ UPS äžäžå«æé²ååéŠçµ (ABF) ç»§çµåšïŒäœä»ç¶æäŸæäžå®çšåºŠçååéŠçµä¿æ€ã äŸåŠïŒåŠæåšçµæ± äŸçµæš¡åŒäžæäºç»ä»¶è¢«æåïŒèŸåºçµåå¯èœäŒååäŸç»èŸå ¥ç«¯ã åšè¿ç§æ åµäžïŒå°±äœ¿çšåæµåš (CT) æ£æµæè·¯çµæµååéŠçµçµåã åŠææ£æµå°ååšæçµæµååéŠçµæ éç¶æïŒå UPS äŒç»æ¢éååšçèŸåºïŒé¿å 对人åé æäººèº«äŒ€å®³ã 154 | å®è£ åå¯åš å®è£ èŸå ¥çº¿åæ¥å°çº¿ 1 2 3 4 å°èŸå ¥æ¥çº¿ç©¿è¿å¯Œç®¡ïŒç 2 è±å°ºïŒ0.5 ç±³ïŒé¿ç线é²åºã å°éå±èœ¯æ¥å€Žè¿æ¥å°å¯Œç®¡çäžç«¯ã 5 å°å¯Œç®¡æå ¥é 线è¿å£ïŒå°å¯Œç®¡æ¥å€Žè¿æ¥å°é¢æ¿äžã 仿¯æ ¹è¿çº¿çæ«ç«¯å¥äž 0.5âïŒ1.5 åç±³ïŒçç»çŒå±ã 6 æç §äžè¡šç UPS é çº¿è§æ Œå°èŸå ¥åå°çº¿è¿æ¥å°æ¥çº¿ç«¯åæš¡åã æ¥çº¿åèœ èŸå ¥ æ¥çº¿ç«¯åçäœçœ® UPS æ¥çº¿çåèœ 1 å°èŸå ¥ç«¯æ¥å° 2 L2/é¶çº¿æ¥å ¥ 3 L1 æ¥å ¥ 端å线ç尺寞 åé¢å® åŒ* 玧åºåç© 16â35 mm2 (8â2 AWG) 1.7 Nm (15 lb-in) * éçšçæ¥çº¿çæäœè§æ ŒïŒ S 8对äºè®Ÿå€æ¥å°çº¿ïŒæäœéçš S 4对äºèŸå ¥çº¿åé¶çº¿ïŒæäœéçš AWGã75_C çé线 AWGã75_C çé线 7 æŽæ¢æ¥çº¿ç«¯åæš¡åçå€çã å®è£ åå¯åš | 155 å¯åš UPS åŒ/å ³æé® èŠå¯åš UPSïŒè¯·æ§è¡ä»¥äžæ¥éª€ïŒ 1 ç¡®ä¿å éšçµæ± å·²è¿å¥œã 2 åŠæå®è£ äºå¯éç EBMïŒç¡®è®€ EBM å·²äž UPS è¿æ¥ã æŽå€ä¿¡æ¯ïŒè¯·åé Dell åšçº¿æºæ¶åŒ 10 kW EBM å ¥éšæåã 3 ç¡®ä¿ææèŽè·æ®µæè·¯åšéœå€äºåŒå¯äœçœ®ã 4 åŒå¯äž»åžçµçµæºæè·¯åšã UPS ç LCD æŸç€ºå±äº®èµ·ã Dell åŒæºå±å¹å䞺 UPS ç¶ææ±æ»å±å¹ã UPS å颿¿æŸç€ºå±äžæŸç€ºåºæ£åšéªççâåŸ æºâåŸæ ã 5 æäž UPS å颿¿äžçåŒ/å ³æé®ã å¯åšå®æåïŒç¶ææ ¹æ® UPS å·¥äœæš¡åŒæ¹åã 156 | å®è£ åå¯åš 6 åš UPS ç¶ææ±æ»å±å¹äžïŒæäž æé®ïŒæ¥ç掻åšèŠæ¥ææ³šæã è§£é€ææå·²æ¿æŽ»çèŠæ¥ååç»§ç»ã åè§Dell åšçº¿æºæ¶åŒ UPS 10 kW çšæ·æåäžçâæ éå€çâã åŠææ²¡ææŽ»åšèŠæ¥ïŒäŒåºç°âæ æ¥èŠâä¿¡æ¯ã 7 ç¡®è®€âæ£åžžïŒNormalïŒ åŸæ æŸç€ºåš UPS ç¶ææ±æ»å±å¹äžïŒè¿è¡šæ UPS è¿èœ¬æ£åžžïŒä»»äœèŽèœœéœæçµåäŸç»ã 8 以äžä¿¡æ¯ïŒè¯·åé Dell åšçº¿æºæ¶åŒ UPS 10 kW çšæ·æåã S æå ³å®è£ å¯éæ©å±çµæ± æš¡å (EBM) åçé 眮çšåº S è®Ÿçœ®æ¥æåæ¶éŽïŒæŽæ¹å ¶ä»åºåé»è®€è®Ÿçœ® 9 åŠææšå®è£ äºå¯éç REPOïŒå请æµè¯ REPO åèœïŒ åŒå¯å€éš REPO åŒå ³ã æ£æ¥ UPS æŸç€ºå±äžæ¯åŠæç¶æååã å°å€éš REPO åŒå ³çœ®äºå ³ç¶æïŒéå¯ UPSã 10 å¯¹çµæ± è¿è¡å çµã 泚æïŒ å çœ®çµæ± åšäžå° 3 å°æ¶å å¯å è³ 90% ççµéã äœæ¯ïŒçµæ± åšå®è£ æé¿æåæŸåå¿ é¡»å çµ 48 å°æ¶ã å°å¿ïŒ 䞺é¿å UPS è¿èœœæ åµïŒè¯·äžæ¬¡è¿æ¥äžäžªè®Ÿå€ïŒ å¹¶ç¡®ä¿æ¯äžªä¿æ€ç讟å€å®å šå¯åšååè¿æ¥äžäžäžªè®Ÿå€ã 泚æïŒ Dell å»ºè®®è®Ÿçœ®æ¥æåæ¶éŽçšäºæ éæé€æä¿ä¿®ã 泚æïŒ åå§å¯åšæ¶ïŒUPS æ ¹æ®èŸå ¥æ¥çº¿çé¢ç ïŒé»è®€æ åµäžèŸå ¥é¢çèªåšäŸŠæµåèœäŒåŒå¯ïŒè®Ÿçœ®ç³»ç»é¢çã åå§å¯åšä¹åïŒèªåšææµåèœäŒè¢«çŠçšïŒçŽè³æšéè¿è®Ÿçœ®èŸåºé¢çæåšéæ°åŒå¯ã å®è£ åå¯åš | 157 泚æïŒ åå§å¯åšæ¶ïŒé»è®€å°èŸå ¥èŸå ¥çµåèªåšäŸŠæµåèœåŒå¯ã 以åå¯åšä¹åïŒèªåšææµåèœäŒè¢«çŠçšïŒçŽè³æšéè¿è®Ÿçœ®èŸåºçµåæåšéæ°åŒå¯ã è¯å« UPS å颿¿ æ¬èä»ç»äžäžª Dell åšçº¿æºæ¶åŒ 10 kW UPS åå·çå颿¿ã 10 kW 208V UPS (DELL10KWOLHVUS) RS-232 USB ç«¯å£ ç«¯å£ UPS éä¿¡æ§œ äžäžª NEMA L6-30R çµæºæåº§ 䞀䞪èŸåºçµè·¯ æè·¯åš 䞀䞪 IEC 320-C19 çµæºæåº§ èŽè·æ®µ 1 (LS1) 158 | å®è£ åå¯åš REPO ç«¯å£ EBM è¿æ¥åš äžäžª NEMA L6-30R çµæºæåº§ 䞀䞪èŸåºçµè·¯ æè·¯åš å°èèºé 䞀䞪 IEC 320-C19 çµæºæåº§ èŽè·æ®µ 2 (LS2) èŸå ¥æ¥çº¿ç«¯åæš¡ å 10 kW 230V UPS (DELL10KWOLHV) RS-232 USB ç«¯å£ ç«¯å£ UPS éä¿¡æ§œ 䞀䞪èŸåº 䞀䞪 IEC çµè·¯æè·¯ 320-C19 çµæºæåº§ åš äžäžª IEC 60309 332R6S æåº§ èŽè·æ®µ 1 (LS1) REPO ç«¯å£ äžäžªèŸåº çµè·¯æè·¯ åš EBM è¿æ¥åš äžäžª IEC 60309 332R6S æåº§ å°èèºé èŸå ¥æ¥çº¿ç«¯åæš¡ å èŽè·æ®µ 2 (LS2) å®è£ åå¯åš | 159 10 kW 230V UPS (DELL10KWOLHVB) UPS éä¿¡æ§œ RS-232 USB ç«¯å£ ç«¯å£ äž€äžªèŸåºçµè·¯æ å䞪 IEC è·¯åš 320-C19 æåº§ èŽè·æ®µ 1 (LS1) 160 | å®è£ åå¯åš REPO EBM ç«¯å£ è¿æ¥åš 䞀䞪èŸåºçµè·¯æ è·¯åš å䞪 IEC 320-C19 æåº§ èŽè·æ®µ 2 (LS2) å°èèºé èŸå ¥æ¥çº¿ç«¯åæš¡å Dellt åšç·æ©æ¶åŒ UPS 10 kW ç³»çµ±äœ¿çš å ¥éæå DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com 泚æåèŠå 泚æïŒ ãæ³šæã衚瀺å¯å¹«å©æšæŽå¥œäœ¿çšæ¬è»ä»¶çéèŠä¿¡æ¯ã å±éªïŒ ãå±éªãè¡šç€ºç·æ¥å±éªæ æ³ïŒåŠæäžå 以é¿å ïŒå°å°èŽæ»äº¡æåŽéçå·å®³ã èŠåïŒ ãèŠåã衚瀺æœåšå±éªæ æ³ïŒåŠæäžå 以é¿å ïŒå¯èœæå°èŽæ»äº¡æå·å®³ã å°å¿ïŒ ãå°å¿ã衚瀺æœåšå±éªæ æ³ïŒåŠæäžå 以é¿å ïŒå¯èœå°èŽèŒåºŠæäžåºŠå·å®³ïŒæè²¡ç¢æå€±äºæ ã å±éªïŒ éµå®äžåé ç¥æå©æŒé²æ¢ç·æ¥å±éªæ æ³çŒçïŒè©²æ æ³è¥äžå 以é¿å ïŒå°å°èŽæ»äº¡æåŽéçå·å®³ïŒ S æ¬ UPS äžå«æ èŽåœæ§é»å£. ææç¶ä¿®å檢修工äœéœåªæç± ææ¬æª¢ä¿®äººå¡å¯Šæœ. æ¬ UPS äž æ²æäœ¿çšè å¯èªè¡ç¶ä¿®çéšä»¶ æ EBMã æ¬æä»¶æå«ä¿¡æ¯åŠæè®æŽïŒæäžåŠè¡éç¥ã E 2012 Dell Inc. ä¿çæææ¬å©ã æªç¶ Dell Inc. æžé¢èš±å¯ïŒåŽçŠä»¥ä»»äœåœ¢åŒé²è¡è€å¶ã æ¬æäžäœ¿çšçåæšïŒ Dell å DELL åŸœæšæ¯ Dell Inc. çåæšã èœæºä¹æ (ENERGY STAR) æ¯çŸåç°ä¿çœ²æææçèš»ååæšã æ¬æä»¶äžå¯èœæçšå°å ¶ä»åæšååååçš±æçš±å°éäºåæšååçš±æå ¶ç¢åæææææ¬çäŒæ¥å¯Šé«ã Dell Inc. å°äžå±¬æŒèªå·±çåæšååååçš±æåž¶æçå°æå©çïŒäžè¡äœ¿ä»»äœæææ¬ã 2012 幎 12 æ ç³»çµ±ç¹æ§ 該 UPS 坿äŸååºçæ§èœèå¯é æ§ïŒå æ¬äžåçšæåªå¢ïŒ S å ·æçŽæ£åŒŠæ³¢èŒžåºçåšç·åŒ UPS èšèšã S çæ£åšç·éèœææè¡ïŒæäŸé«åçå¯åºŠïŒäžååžé»é »ç圱é¿ïŒå¯å Œå®¹åçš®çŒé»æ©ã S éå£èåå£èª¿ç¯ïŒéé糟æ£é»å£æ³¢å確ä¿èª¿ç¯åŸçé»å£èœèæšççšé»èšåçžé©æã S UPS ééæ¿Ÿæ³¢å調ç¯èŒžå ¥ç亀æµé»ïŒåŸèçºæšçèšåæäŸç©©å®çé»åïŒç¡éæ¶è黿± çé»åã S å¯éžæçã髿èœãæäœæš¡åŒã S 5U UPS é«åºŠã S å³äœ¿æ²æå ¬çšé»æºïŒé»æ± åååèœä¹èœçµŠ UPS äŸé»ã S äžå¿ éé UPS å³å¯å®å šæŽæé»æ± ïŒå æ€ç¶è·æäœé垞簡䟿ã S Dell æåæšçäžçä¿¡æ¯å¯åŸæ£é¢æ§å¶é¢æ¿äžç LCD 顯瀺å±äžè®åå°ã S ééå¯éžé çExternal Battery Module (EBM) å¯å»¶é·å ¶å·¥äœæéã S ééé çšé»æºç·æ¥éé (REPO) 端å£å¯å¯ŠçŸææ¥åæ©æ§å¶ã S åž¶æå ©åæšåéèšç«¯å£ïŒUSB å RS-232 äž²è¡ç«¯å£ïŒã S å¯éžé Dell Network Management CardïŒä¹çš±çº NMCïŒïŒé暣å¯å¢åŒ·éèšåèœïŒåŸèå¯ç²åŸæŽåŒ·ç黿ºä¿è·åæ§å¶ã S å¯éžé Powerware Environmental Monitoring Probe (EMP)ïŒçšäŸééæ¡æ¶ç°å¢äžçæº«åºŠåæ¿åºŠè®æžïŒäžŠé çšç£æ§ç°å¢æžæã æšéå¯ä»¥ééåç²åå ©åç±äœ¿çšè æäŸçæ¥è§žèšåççæ ã S å¯äœ¿çš Dellt Multi-UPS Management Console (MUMC) and Dellt UPS Local Node Manager (ULNM) åºæŒ Web çæçšè»ä»¶é²è¡é«çŽé»æºç®¡çïŒåŸè寊çŸå¹³æ»éæ©å黿ºç£æ§ã S å©çšè¢«çš±äœè² è·æ®µçåçšç«çæåº§çµå¯ŠçŸé åºéæ©åè² èŒç®¡çã S ç¡éæ¥ææåéšéçé»è©±ïŒå³å¯èŒæŸå°åºä»¶é²è¡åçŽã S æäŸå šç代çèªèæ¯æã S èœæºä¹æ (ENERGY STAR)® èªèç UPSã ç³»çµ±ç¹æ§ | 163 æ¥æŸä¿¡æ¯ å°å¿ïŒ æ¬å®å šãç°å¢åæ³èŠæ§ä¿¡æ¯æä»¶æäŸäºéèŠçå®å šåæ³èŠæ§ä¿¡æ¯ã æšèŠæ¥æŸä»éºŒæä»¶ïŒ S UPS çšæ¶æå åšæ€æ¥æŸ Dell UPS å ç€ S Dell Network Management Card çšæ·æå S Dell MUMC and Dell ULNM çšæ·æå 泚æïŒ çžéææªåè»ä»¶æŽæ°ïŒè«èšªå www.support.dell.com å www.dellups.comã S èŠæ Œ Dell UPS 䜿çšè æå S åŠäœé 眮 UPS çèšå® 䜿çšè æåå¯åŸ Dell UPS å ç€å www.support.dell.com äžç²åå°ã S åŠäœèšºæ·æ éå解決åé¡ S åŠäœå®è£ REPO æ§å¶è£çœ® S å®å šæäœé ç¥ å®å šãç°å¢åæ³èŠæ§ä¿¡æ¯ S æ³èŠæ§ä¿¡æ¯ S åæ¶å©çšä¿¡æ¯ S ä¿ä¿®ä¿¡æ¯ Dell ä¿ä¿®åæ¯æä¿¡æ¯ S æ¢æ¬Ÿåæ¢ä»¶ïŒå éçŸåïŒ S æçµäœ¿çšè èš±å¯åè° S æ¯æä¿¡æ¯ Dell æè¡æ¯æç¶²ç« â www.support.dell.com 泚æïŒ éžææšæå±¬çå°åæè¡æ¥éšéïŒ ä»¥æ¥çåé©çæ¯æç¶²ç«ã 164 | æ¥æŸä¿¡æ¯ å®è£ååå å°å¿ïŒ åšå·è¡æ¬æä»¶äžçæ¥é©ä¹åïŒè«å é±è®åéµåŸªå®å šãç°å¢åæ³èŠæ§ä¿¡æ¯æä»¶äžçå®å šæäœèªªæåéèŠ çæ³èŠæ§ä¿¡æ¯ã å°å¿ïŒ åšäœæº«ç°å¢äžæéæ©ç®±å è£å¯èœå°èŽæ©ç®±åå ¶å §éšçŒçå·åçŸè±¡ã è«åšæ©ç®±å §å€å®å šå¹¹ç¥åŸåå®è£ïŒä»¥é²è§žé»å±éªïŒã å°å¿ïŒ 黿± 座ç€çå®è£ææé€æç±çç¥é»æ± åæé泚æäºé ç人å¡å¯Šæœææå°ã æªç¶ææ¬ç人å¡äžåŸæ¥è§žé»æ± ã å®è£ååå | 165 å°å¿ïŒ ç±æŒæ©ç®±èŒé (99 kg/218 lb)ïŒ æ¬èµ·æ©ç®±åè«å§çµæé€å ©å黿± ç€åº§ã å°æ©ç®±æ¬èµ·æŸå ¥æ©æ¶è³å°éèŠå ©å人ã å°å¿ïŒ ç±æŒé»æ± èŒé (32 kg/71 lb)ã å æ€å»ºè°åšæäžé»æ± æäœ¿çšé©ç¶çæ¬æ¬å·¥å ·ã 泚æïŒ æ¬ååæéé茞箱æè«å°å¿è¬¹æ ã åšåçµä»¶å¯ä»¥é²è¡å®è£ä¹åïŒä¿æå ¶èæŒå è£çæ ã æ¬ç¯æè¿°éŠæ¬¡å®è£ç³»çµ±çæ¥é©ã æ©ç®±æå æ¬ç³»çµ±çå è£æè§£ïŒ 1 䜿çšåè»ææ¶²å£è»å°é茞箱åæç€ç§»åå°æšå°èŠå®è£ UPS çå°æ¹éè¿ã 2 æé¢äžŠç§»èµ°å€é茞箱ã 166 | å®è£ååå 3 åäžå¡é²é éšæ³¡æ²«èè¯ä¹ç¯æææ®µäžå ©å广§œå §çéä»¶çã 4 æééä»¶ç䞊æŸåšéè¿å¹³æŽãå¹³åŠçå¹³é¢äžã 泚æïŒ Dell åšç·æ©æ¶åŒ UPS 10 kW 䜿çšè æå絊åºäºå è£æè§£åå®è£çæ¥é©ã èŠåèæ€æåïŒè«åšå°éä»¶çæŸåšäžéä¹åå°è©²æååŸéä»¶çäžååºã 5 å°é éšç泡沫èè¯ä¹ç¯éšååäžïŒæŸåšéè¿å¹³æŽã平穩çå¹³é¢äžã å®è£ååå | 167 泚æïŒ 黿± åºå®æ¯æ¶äžåž¶æå·Šå³åŽæšèš LïŒå·ŠïŒå RïŒå³ïŒïŒééæ€çš®æ¹åŒæšç€ºåºäºå®è£æå®åå¿ é äœæŒçäœçœ®ã 6 åŸ UPS äžåäžå ©ååºå®æ¯æ¶ïŒ æŸå°å·ŠåŽïŒåž¶æ L æšèšïŒçåºå®æ¯æ¶ã åšæ©ç®±å·ŠåŽïŒéæéèœå翌圢èºé以æŸéå·Šåºå®æ¯æ¶ã å°æ¯æ¶åäžå€®ç«æ±æ¹åæšç§»ïŒä»¥äœ¿åŸæ¯æ¶èæ©ç®±è«é¢ã å°æ¯æ¶æåèªå·±çæ¹åæèœïŒäžŠåå·ŠæåïŒä»¥å°å ¶æäžã å°æ¯æ¶æŸåšäžéã æŸå°å³åŽïŒåž¶æ R æšèšïŒçåºå®æ¯æ¶ã åšæ©ç®±å³åŽïŒéæéèœå翌圢èºé以æŸéå³åºå®æ¯æ¶ã å°æ¯æ¶åäžå€®ç«æ±æ¹åæšç§»ïŒä»¥äœ¿åŸæ¯æ¶èæ©ç®±è«é¢ã å°æ¯æ¶æåèªå·±çæ¹åæèœïŒäžŠå峿åïŒä»¥å°å ¶æäžã å°æ¯æ¶æŸåšäžéã 7 ç¢ºä¿ææé»æ± æ¥é éœå·²æ·é飿¥ã 168 | å®è£ååå å°å¿ïŒ ç±æŒé»æ± èŒé (32 kg/71 lb)ã å æ€å»ºè°åšæäžé»æ± æäœ¿çšé©ç¶çæ¬æ¬å·¥å ·ã 8 åŸ UPS åäžé»æ± åº§ïŒ å°é»æ± çé éšå·²æ·éç UPS 黿± 飿¥åšååºã ææ¡äœé»æ± ç€ååéšäžçå ©åç°åœ¢å¡æçªèµ·ã æèèªå·±çæ¹ååŸå€æïŒå°å ¶åŸ UPS äžæåºã æ æ æ æ³šæïŒ æ©è²æ æšèšæç€ºææ¡ç°åœ¢çªèµ·çäœçœ®ã å°é»æ± ç€åæŸåšæšä¹ååŸ UPS é éšåäžçèè¯ä¹ç¯æ³¡æ²«äžã å°ç¬¬äºå黿± ç€åº§éè€ä»¥äžæ¥é©ã å®è£ååå | 169 å°å¿ïŒ åäžé»æ± çæ©ç®±ä»ç¶åŸé (46 kg/101 lb)ã å æ€å°æ©ç®±æ¬èµ·æŸå ¥æ©æ¶äžèŠæ±è³å°æå ©å人寊æœã 9 äžäººäžé䜿çšçŽæ¿äžçææå°å¿å°æ©ç®±åŸå€é¢çèè¯ä¹ç¯æ³¡æ²«äžååºïŒäžŠæŸå°å¹³åŠãç©©å®çå¹³ é¢äžã 10 å°æ©ç®±æŸåšé è¿å°çšäŸå®è£æ¬ UPS çæ©æ¶çåä¿è·ååå §çå¹³åŠãç©©å®çå¹³é¢äžã 泚æïŒ 確ä¿è©²ååé颚è¯å¥œãå¹¹ç¥äžäžååšæçæ§æ°£é«åç¡è èæ æ³ã 170 | å®è£ååå æ©æ¶çå®è£ å°å¿ïŒ ç±æŒæ©ç®±èŒé (99 kg/218 lb)ïŒ æ¬èµ·æ©ç®±äžŠå𿩿¶å°è»äžå®è£ UPS åïŒå§çµå åŸ UPS åäžå ©å黿± ç€åº§ã å°æ©ç®±æ¬èµ·æŸå ¥æ©æ¶è³å°éèŠå ©å人寊æœã å°å¿ïŒ 黿± çå®è£ææäžæç±çç¥é»æ± åæé泚æäºé ç人å¡å¯Šæœææå°ã æªç¶ææ¬ç人å¡äžåŸæ¥è§žé»æ± ã å°å¿ïŒ ç±æŒé»æ± èŒé (32 kg/71 lb)ã å æ€å»ºè°åšæäžé»æ± æäœ¿çšé©ç¶çæ¬æ¬å·¥å ·ã å°å¿ïŒ åŠæå®è£å¯éž EBMïŒEBM å¿ é äœæŒ UPS äžæ¹ïŒäžŠäž UPS å EBM ä¹éæ²æ U 空éã éæš£èœç¢ºä¿åæ©æ¶äžééååžæŽåçãæ¥è§ž UPS æ§å¶é¢æ¿æŽå®¹æïŒä»¥åæŽå®¹æèšèšé»æ± æ¥ç·çç·è·¯ã éæš£éå¯ä»¥é¿å EBM ç·å UPS 飿¥ä¹éç¢çæå以åå¯èœç飿¥æ éã èŠåïŒ å°æŒæ©æ¶å®è£çç³»çµ±ïŒ åšæ©æ¶äžå®è£å€å系統æïŒå®æç¶åç³»çµ±çææçšåºç¶åŸå詊å®è£äžäžåç³»çµ±ã æ³šæïŒ éèŠçºæ¯åæ©ç®±å®è£å°è»ã 泚æïŒ æ©ç®±æ¯åšåé¢çœ©ææ¿æªå®è£ççæ äžé²è¡é茞çã æ³šæïŒ 以äžèªªæå°æŒæ¹åæ©æ¶åç¡èºçŽååæ©æ¶æ¯çžåçã éäºå°è»å¹é éå ©çš®æ©æ¶ã åšæ©æ¶äžå®è£ UPSïŒ 1 確ä¿ä»¥äžéšä»¶è¢«æŸçœ®åšçšäŸå®è£æ¬ UPS çæ©æ¶éè¿çå¹³åŠãç©©å®çå¹³é¢äž: S æ©ç®± S å ©å UPS éä»¶ç S å ©å黿± ç€åº§ïŒå UPSïŒ S å ©å黿± åºå®æ¯æ¶ïŒå UPSïŒ å®è£ååå | 171 å®è£å°è» 2 å°å°è»åŸå°è»å¥ä»¶çéä»¶çäžæäžã 3 åšå°è»äžéžæåé©çåå°æ©ç®±å®äœæŒæ©æ¶äžé å®çäœçœ®ã å°å°è»å®äœæŒåé 絊 UPS ç 5U 空éçåºéšã å°å¿ïŒ åŠæå®è£å¯éž EBMïŒEBM å¿ é äœæŒ UPS äžæ¹ïŒäžŠäž UPS å EBM ä¹éæ²æ U 空éã æ³šæïŒ èŠç¢ºå®åªæ¯å³åéšïŒæšèšæå³åéšïŒååªæ¯å·ŠåéšïŒæšèšæå·ŠåéšïŒïŒå¯è§å¯å°è»äžçæšç°œã 鿝æŸçœ®å°è»é²è¡å®è£çæ¹æ³ã 4 æç §å瀺çäœçœ®å°å·Šå³å°è»é²è¡å®äœã å°å·Šå³å°è»å®è£å°æ©æ¶äžå»ïŒ 霧åå°è»çåŸç«¯ïŒçŽå°å ¶å®å šå¡åšçž±åæ©æ¶æ³èäžïŒäžŠäžé€ééå®åšå ¶äœçœ®äžã æåå°è»åå¥œè¶ åºæ©æ¶åéšã æšåå°è»çå端ïŒçŽå°å ¶å®å šå¡å𿩿¶çž±åæ³èäžïŒäžŠäžé€ééå®å°äœçºæ¢ã 172 | å®è£ååå å®è£ååºå®æ©ç®± å°å¿ïŒ åäžé»æ± çæ©ç®±ä»ç¶åŸé (46 kg/101 lb)ã å°æ©ç®±æ¬èµ·æŸå ¥æ©æ¶è³å°éèŠå ©å人ã 5 å°æ©ç®±æ»å°å°è»äžïŒç¶åŸæ»è³æ©æ¶äžã 6 çšåºå®æ¶äžçåå翌圢èºéå°æ©ç®±å端åºå®å°å®è£æ©æ¶äžã çšæé æéæ°ç·ç¿Œåœ¢èºéïŒäžèŠäœ¿çšé»åå·¥å ·ã 黿± ç€åº§çå®è£ 7 å°æšååºç黿± ç€åº§æŸå𿩿¶éè¿ã å°å¿ïŒ ç±æŒé»æ± èŒé (32 kg/71 lb)ã å æ€å»ºè°åšå®è£é»æ± æäœ¿çšé©ç¶çæ¬æ¬å·¥å ·ã 泚æïŒ 黿± ç€åº§å¯å®è£åšä»»æäžå黿± çäžã 泚æïŒ å°ç€åº§æå ¥ïŒèŠåæšç°œç®é æäžã å®è£ååå | 173 8 å®è£é»æ± ç€åº§ïŒ å°é»æ± çé éšç UPS 黿± 飿¥åšååºã å°é»æ± ç€åº§å®å šæ»å ¥é»æ± çã å°ç¬¬äºå黿± ç€åº§éè€ä»¥äžæ¥é©ã 9 å°ç°åœ¢çªèµ·å¡å ¥å°æ¯å黿± ç€åº§æ£é¢äžç塿å¥äžïŒä»¥å°éäºç°åœ¢çªèµ·ç§»éïŒçµŠäžäžæ¥å®è£éš° åºç©ºéã 黿± æ¥é ç飿¥ 10 飿¥å §éšé»æ± 飿¥åšïŒ å°æå·Šç«¯çç€åº§æ¥é 飿¥å°åºå®ç UPS 飿¥åšã å°æå³ç«¯çç€åº§æ¥é 飿¥å°åºå®ç UPS 飿¥åšã 泚æïŒ 飿¥é»æ± æå¯èœæåºçŸå°éé»åŒ§ã 鿝æ£åžžçŸè±¡ïŒäžææå£æ¬èšåæå°èŽä»»äœå®å šäžçææã æŸå°äžŠé£æ¥äžå€®ç«æ±ä»»äžåŽç黿± è·³ç·ã å°æ¥é æŸåšäžå€®ç«æ±é éšèçå°æ±æ¶äžã 泚æïŒ 飿¥å¥œäžå€®é»æ± è·³ç·åŸïŒä»¥äž²è¯çæ¹åŒå°å ©å黿± ç€åº§é£æ¥åšäžèµ·ã 174 | å®è£ååå 黿± åºå®æ¯æ¶çæŽæ æ©ç®±åŽé¢å¹æ§œ äžå€®ç«æ±åŽé¢å¹æ§œ 泚æïŒ 黿± åºå®æ¯æ¶äžåž¶æå·Šå³åŽæšèš LïŒå·ŠïŒå RïŒå³ïŒïŒééæ€çš®æ¹åŒæšç€ºåºäºå®è£æå®åå¿ é äœæŒçäœçœ®ã 11 æŽæå·ŠåŽïŒL æšèšïŒåå³åŽïŒR æšèšïŒé»æ± åºå®æ¯æ¶ïŒ å°æŒç¬¬äžå黿± åºå®æ¯æ¶ïŒå°æ¯æ¶çªèµ·æå ¥äžå€®ç«æ±åŽé¢ç广§œäžã å°é£æ¥å¥œç黿± æ¥ç·ç·è²Œåšåºå®æ¯æ¶åŸé¢ã å°é»æ± åºå®æ¯æ¶çæ«ç«¯èæ©ç®±åŽé¢ç广§œå°éœã æšåæ¯æ¶çŽå°ç¢åºäœæŒåŽé¢å¹æ§œäžã é æéæèœç¿Œåœ¢èºéïŒä»¥å°æ¯æ¶åºå®ã æŽæç¬¬äºå黿± åºå®æ¯æ¶å¯éè€ä»¥äžæ¥é©ã å®è£ UPS åè 12 å°åéšçœ©èåŸéä»¶çäžååºã å®è£ååå | 175 泚æïŒ åšå®è£ UPS ä¹åäžèŠå°è»ä»¶ CD å ç€ãéèšçºç·ä»¥åïŒåŠæéèŠïŒREPO 飿¥åšåŸéä»¶çäžååºã 1 2 13 å®è£ UPS åèïŒ å°åéšçœ©èèæ©ç®±æ£é¢å°æ£ã å°å眩èå³åŽçªèµ·æå ¥å³åŽæ©ç®±ççªèµ·éå£ã å°çœ©èçå·ŠåŽååæšïŒå°å ¶å¡åšæ©ç®±äžã 泚æïŒ å°çœ©èåºå®å°æ©ç®±äžä¹åïŒç¢ºä¿ UPS æ©ç®±äžç LCD 顯瀺å±èåéšçœ©èäžç LCD 顯瀺å±çªæ¡å°æ£ã 14 ä»¥è² è²¬ä»»çæ åºŠå°å è£äžæ£æåæ¶å©çšïŒæè æ¶èµ·åæŸä»¥åå°äŸäœ¿çšã 176 | å®è£ååå 飿¥èšå èŠå®è£ UPSïŒè«åšä»¥äžæ æ³äžå·è¡ä»¥äžæ¥é©ïŒ 1 åŠææšèŠäœ¿çš Dell MUMC and Dell ULNM è»ä»¶ïŒè«æä»¥äžä»»äžæ¹æ³å»ºç«éèšé£æ¥ïŒ S äœ¿çš Dell Network Management Card ïŒåŠææå®è£ïŒ S äœ¿çšææäŸçç·çºå°æšçèšç®æ©è USB 端å£é£æ¥ 泚æïŒ æŽå€éæŒéèšéžé çä¿¡æ¯ïŒèŠDell åšç·æ©æ¶åŒ UPS 10 kW 䜿çšè æåã 2 åŠææ©æ¶åž¶ææ¥å°æé£æ¥äžæ¥å°é屬å¡çå°é«ïŒè«å°æ¥å°ç·ïŒæªæäŸïŒèæ¥å°èºé飿¥ã åèŠç¬¬ 184 é çãUPS åŸé¢æ¿ãäºè§£éäžçš®åèæ¥å°èºéçäœçœ®ã 3 åŠæå°æ¹æ³èŠèŠæ±äœ¿ç𿿥黿ºééïŒæ·éïŒééïŒè«åèŠ Dell åšç·æ©æ¶åŒ UPS 10 kW 䜿çšè æåäžçãå®è£é çšææ¥é»æºééãã 4 åŠæå®è£å¯éž EBMïŒè«åè Dell åšç·æ©æ¶åŒ EBM 10 kW ç³»çµ±äœ¿çš å ¥éæå äºè§£å®è£èªªæã å°å¿ïŒ åŠæ UPS åšç¡ EBM çæ æ³äžå²åæäœ¿çšïŒäœçºäžé å®å šæªæœïŒå¿ é åš UPS çåŸé¢æ¿äžå®è£é»æ± 飿¥åšè·èã 5 å°éèŠä¿è·çèšåæå ¥å° UPS èŒžåºæåº§äžïŒäžèŠåååä¿è·èšåç黿ºã 6 å奜ææå¿ èŠçååæªæœïŒä»¥åºå®é»æºç·äžŠæ¶é€æè®çåºå®åæè®éæŸã 泚æïŒ é©èèšåççžœé¡å®åŒäžè¶ é UPS ç容éïŒä»¥é²æ¢åºçŸéèŒèŠå ±ã å®è£ååå | 177 UPS èŒžå ¥ç«¯ç硬é£ç· èŠåïŒ è§žé»çå±éªã 黿°£å®è£å·¥äœåªèœç±åæ Œçæª¢ä¿®äººå¡ïŒäŸåŠæç §é»å·¥ïŒå¯Šæœã Dell Rackå°æŒç¡¬é£ç·æ©åïŒéé飿¥æ»¿è¶³ä»¥äžèŠæ±çå°çšåæ¯é»è·¯ïŒ S ä¿è·èšåèŠæ±åš UPS 茞åºåäž»é»æºä¹éæå ©çžæ·éèšå S æ·è·¯åšå¿ é å®è£åšçå£äžïŒäžŠäžäŸ¿æŒæäœäººå¡é²è¡æ¥è§ž S ææŽ²ã æ·è·¯åšå¿ é 笊å IEC/EN 60934 æšåïŒäžæ¥è§žç©ºéè³å°çº 3 mm S 200â240 Vac S å®çž S 50/60 Hz S é屬è»ç®¡ïŒæšèŠäœ¿çšïŒä»¥æ¹äŸ¿æª¢ä¿®åç¶è·ä¿é€ïŒ çå£ éçžæ·è·¯ åš é»ç· 亀æµé»æº UPS é¶ç·/L2 178 | å®è£ååå åäžæ¥ç·ç«¯åæš¡å¡å€è æ²æå æ¥ç·ç«¯åæš¡å¡å€ è 1 åšé£æ¥ UPS çåç·é»èééåžé»é»æºã çµå°ç¢ºä¿æªéé»ã 2 åäžæ¥ç·ç«¯åæš¡å¡å€èïŒ2 åèºéïŒïŒäžŠä¿åã 3 åäžæ¥ç·ç«¯åæš¡å¡å€èäžçšæŒèŒžå°ç®¡çæ²æåã æ€åå ¶ååŸå¿ é èœå®¹çŽ 1âæ 1.5âïŒ25.4 mm æ 38.1 mmïŒçäžéé屬å°ç®¡ (IMC)ã å®è£ååå | 179 å°å¿ïŒ åŠæ UPS æ²æéå°é»æµåé¥çèªåä¿è·èšåïŒè«å®è£å€éšçµç·£èšåã èšåå®è£åŸïŒå¿ é åšå€éšäº€æµæ¥è§žåšäžè²Œéäžå寫æä»¥äžèªå¥æé¡äŒŒå §å®¹çèŠåæšç°œïŒ å±éªïŒ é»å£ åäŸã åšå°æ€é»è·¯æäœåå° UPS éé¢ïŒç¶åŸæª¢æ¥ææç«¯åä¹éæ¯åŠååšå±éªé»å£ã å€é 黿¿ UPS åäŸ Q T L/L1 L/L1 N/L2 N/L2 B Q T N/L2 L/L1 ç·åé çšéé ç£ç±èŒžå ¥ äž»éé AC æ¥è§žåš é¶ç·/L2 L1 èŒžå ¥ç· B äžè¡šååºå¯çšäœå€éšéé¢èšå以é²è¡ååé¥é»ä¿è·çååé¥é»ä¿è·èšåïŒAC æ¥è§žåšïŒã å 䜿çšè¡šäžååºç AC æ¥è§žåšã å¶é å é¡å é¡å®åŒ A75-30 220â240 Vac, 105A 25 HP 208V, 30HP 240V 倩氎äºäžäžé»åšæéå ¬åž (E203071) ïŒæ¿ä»£ïŒ GSC1(CJX4-d)-6511 220â240 Vac, 68A 25 HP 倩氎äºäžäžé»åšæéå ¬åž (E203071) ïŒæ¿ä»£ïŒ GSC1(CJX4-d)-8011 220â240 Vac, 80A 30 HP ABB France (E12527) 泚æïŒ ç¡ç®¡æ¬ UPS äžäžå«æé²ååé¥é» (ABF) 繌é»åšïŒäœä»ç¶æäŸæäžå®çšåºŠçååé¥é»ä¿è·ã äŸåŠïŒåŠæåšé»æ± äŸé»æš¡åŒäžæäºçµä»¶è¢«æå£ïŒèŒžåºé»å£å¯èœæååäŸçµŠèŒžå ¥ç«¯ã åšéçš®æ æ³äžïŒå°±äœ¿çšè®æµåš (CT) 檢枬æè·¯é»æµååé¥é»é»å£ã åŠææª¢æž¬å°ååšæé»æµååé¥é»æ éçæ ïŒå UPS æçµæ¢éè®åšç茞åºïŒé¿å å°äººå¡é æäººèº«å·å®³ã 180 | å®è£ååå å®è£èŒžå ¥ç·åæ¥å°ç· 1 2 3 4 å°èŒžå ¥æ¥ç·ç©¿éå°ç®¡ïŒç 2 è±å°ºïŒ0.5 ç±³ïŒé·çç·é²åºã å°éå±¬è»æ¥é 飿¥å°å°ç®¡çäžç«¯ã 5 å°å°ç®¡æå ¥é ç·é²å£ïŒå°å°ç®¡æ¥é 飿¥å°é¢æ¿äžã åŸæ¯æ ¹é²ç·çæ«ç«¯åäž 0.5âïŒ1.5 åç±³ïŒççµç·£å±€ã 6 æç §äžè¡šç UPS é ç·èŠæ Œå°èŒžå ¥åå°ç·é£æ¥å°æ¥ç·ç«¯åæš¡å¡ã æ¥ç·åèœ èŒžå ¥ æ¥ç·ç«¯åçäœçœ® UPS æ¥ç·çåèœ 1 å°èŒžå ¥ç«¯æ¥å° 2 L2/é¶ç·æ¥å ¥ 3 L1 æ¥å ¥ 端åç·ç尺寞 åé¡å® åŒ* ç·åºåç© 16â35 mm2 (8â2 AWG) 1.7 Nm (15 lb-in) * éçšçæ¥ç·çæäœèŠæ ŒïŒ S 8å°æŒèšåæ¥å°ç·ïŒæäœéçš S 4å°æŒèŒžå ¥ç·åé¶ç·ïŒæäœéçš AWGã75_C çé ç· AWGã75_C çé ç· 7 æŽææ¥ç·ç«¯åæš¡å¡çå€èã å®è£ååå | 181 åå UPS é/éæé èŠåå UPSïŒè«å·è¡ä»¥äžæ¥é©ïŒ 1 確ä¿å §éšé»æ± å·²é£å¥œã 2 åŠæå®è£äºå¯éžç EBMïŒç¢ºèª EBM å·²è UPS 飿¥ã æŽå€ä¿¡æ¯ïŒè«åé±Dell åšç·æ©æ¶åŒ EBM 10 kW ç³»çµ±äœ¿çš å ¥éæåã 3 ç¢ºä¿ææè² è·æ®µæ·è·¯åšéœèæŒéåäœçœ®ã 4 éåäž»åžé»é»æºæ·è·¯åšã UPS ç LCD 顯瀺å±äº®èµ·ã Dell éæ©å±å¹è®çº UPS çæ å¯çžœå±å¹ã UPS å颿¿é¡¯ç€ºå±äžé¡¯ç€ºåºæ£åšéççãåŸ æ©ãåæš ã 5 æäž UPS å颿¿äžçé/éæéã åå宿åŸïŒçæ æ ¹æ UPS å·¥äœæš¡åŒæ¹è®ã 182 | å®è£ååå 6 åš UPS çæ å¯çžœå±å¹äžïŒæäž æéïŒæ¥ç掻åèŠå ±ææ³šæã è§£é€ææå·²æ¿æŽ»çèŠå ±åŸå繌çºã åèŠDell åšç·æ©æ¶åŒ UPS 10 kW 䜿çšè æåäžçãæ éèçãã åŠææ²ææŽ»åèŠå ±ïŒæåºçŸãç¡å ±èŠãä¿¡æ¯ã 7 確èªãæ£åžžãïŒNormalïŒ åæš é¡¯ç€ºåš UPS çæ å¯çžœå±å¹äžïŒé衚æ UPS éèœæ£åžžïŒä»»äœè² èŒéœæé»åäŸçµŠã 8 以äžä¿¡æ¯ïŒè«åé± Dell åšç·æ©æ¶åŒ UPS 10 kW 䜿çšè æåã S æéå®è£å¯éžæŽå±é»æ± æš¡å¡ (EBM) åŸçé 眮çšåº S èšå®æ¥æåæéïŒè®æŽå ¶ä»åºå» é»èªèšå® 9 åŠææšå®è£äºå¯éžç REPOïŒåè«æž¬è©Š REPO åèœïŒ éåå€éš REPO ééã æª¢æ¥ UPS 顯瀺å±äžæ¯åŠæçæ è®åã å°å€éš REPO éé眮æŒéçæ ïŒéå UPSã 10 å°é»æ± é²è¡å é»ã 泚æïŒ å §çœ®é»æ± åšäžå° 3 å°æå §å¯å è³ 90% çé»éã äœæ¯ïŒé»æ± åšå®è£æé·æåæŸåŸå¿ é å é» 48 å°æã å°å¿ïŒ çºé¿å UPS éèŒæ æ³ïŒè«äžæ¬¡é£æ¥äžåèšåïŒäžŠç¢ºä¿æ¯åä¿è·çèšåå®å šåååŸå飿¥äžäžåèšåã æ³šæïŒ Dell 建è°èšå®æ¥æåæéçšæŒæ éæé€æä¿ä¿®ã 泚æïŒ åå§ååæïŒUPS æ ¹æèŒžå ¥æ¥ç·çé »çïŒé»èªæ æ³äžèŒžå ¥é »çèªå嵿ž¬åèœæéåïŒèšå®ç³»çµ±é »çã åå§ååä¹åŸïŒèªåææž¬åèœæè¢«çŠçšïŒçŽè³æšééèšå®èŒžåºé »çæåéæ°éåã å®è£ååå | 183 泚æïŒ åå§ååæïŒé»èªå°èŒžå ¥èŒžå ¥é»å£èªå嵿ž¬åèœéåã 以åŸååä¹åŸïŒèªåææž¬åèœæè¢«çŠçšïŒçŽè³æšééèšå®èŒžåºé»å£æåéæ°éåã èå¥ UPS åŸé¢æ¿ æ¬ç¯ä»ç޹äžå Dell Rack 10 kW UPS åèçåŸé¢æ¿ã 10 kW 208V UPS (DELL10KWOLHVUS) UPS éèšæ§œ RS-232 USB ç«¯å£ ç«¯å£ äžå NEMA å ©å IEC L6-30R 黿ºæåº§ 320-C19 黿ºæåº§ å ©å茞åºé»è·¯ æ·è·¯åš è² è·æ®µ 1 (LS1) 184 | å®è£ååå REPO ç«¯å£ EBM 飿¥åš å ©å IEC äžå NEMA L6-30R 黿ºæåº§ 320-C19 黿ºæåº§ å ©å茞åºé»è·¯ æ·è·¯åš è² è·æ®µ 2 (LS2) å°è ³èºé èŒžå ¥æ¥ç·ç«¯åæš¡ å¡ 10 kW 230V UPS (DELL10KWOLHV) RS-232 USB ç«¯å£ ç«¯å£ UPS éèšæ§œ å ©åèŒžåº å ©å IEC é»è·¯æ·è·¯ 320-C19 æåº§ åš äžå IEC 60309 332R6S æåº§ è² è·æ®µ 1 (LS1) REPO EBM ç«¯å£ é£æ¥åš äžåèŒžåº é»è·¯æ·è·¯ åš äžå IEC 60309 332R6S æåº§ å°è ³èºé èŒžå ¥æ¥ç·ç«¯åæš¡ å¡ \è² è·æ®µ 2 (LS2) å®è£ååå | 185 10 kW 230V UPS (DELL10KWOLHVB) UPS éèšæ§œ RS-232 USB ç«¯å£ ç«¯å£ å ©å茞åºé»è·¯æ· åå IEC 320-C19 æåº§ è·¯åš è² è·æ®µ 1 (LS1) 186 | å®è£ååå REPO ç«¯å£ EBM 飿¥åš å ©å茞åºé»è·¯æ· è·¯åš åå IEC 320-C19 æåº§ è² è·æ®µ 2 (LS2) å°è ³èºé èŒžå ¥æ¥ç·ç«¯åæš¡å¡ Dellt ìšëŒìž ë UPS 10 kW ì¬ì©ìì ìì€í ììíêž° DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com ì°žê³ ë° ê²œê³ ì°žê³ : "ì°žê³ "ë ìíížìšìŽë¥Œ ë ì íì©íë ë° ëììŽ ëë ì€ìí ì 볎륌 ëíë ëë€. ìí: "ìí"ì íŒíì§ ìì ê²œì° ì¬ë§ìŽë ì€ìì ìŒêž°í ì ìë êžë°í ìí ìí©ì ëíë ëë€. ê²œê³ : "ê²œê³ "ë íŒíì§ ìì ê²œì° ì¬ë§ìŽë ìíŽë¥Œ ìŒêž°í ì ìë ì ì¬ì ìí ìí©ì ëíë ëë€. 죌ì: "죌ì"ë íŒíì§ ìì ê²œì° ê²œë¯žíê±°ë 볎íµì ìíŽ ëë ì¬ì° ìì€ ì¬ê³ 륌 ìŒêž°í ì ìë ì ì¬ì ìí ìí©ì ëíë ëë€. ìí: íŒíì§ ìì ê²œì° ì¬ë§ìŽë ì€ìì 결곌륌 ìŽëí ì ìë êžë°í ìí ìí©ì ë°©ì§íë ë° ëììŽ ë ë€ì ì§ì¹šì ì€ìíììì€: S UPSìë ì¬ë§ì ìŽëí ì ìë ì ì ìŽ ììµëë€. 몚ë ì늬ì ì ë¹ë ê³µìžë ì ë¹ ììë§ìŽ ìííŽìŒ í©ëë€. UPS ëë EBM ëŽë¶ìë ì¬ì©ìê° ì ë¹í ì ìë ë¶íìŽ ììµëë€ ìŽ ë¬žìì í¬íšë ì 볎ë ê³ ì§ ììŽ ë³ê²œë ì ììµëë€. E 2012 Dell Inc. All right reserved. Dell Inc.ì ì멎 íê° ììŽë ìŽë€ ë°©ìì ë³µì ë ì격í êžì§ë©ëë€. ìŽ ë¬žìì ì¬ì©ë ìí: Dell 곌 DELL ë¡ê³ ë Dell Inc.ì ìíì ëë€. ENERGY STAR ìŽëŠì ë¯žêµ í겜 볎ížì²ìŽ ìì íê³ ìë ë±ë¡ ìíì ëë€. ë€ë¥ž ìí ë° ëª ì¹ ëë êŽë š ì íì ëí ê¶ëŠ¬ë¥Œ 죌ì¥íë ë¹ì¬ì륌 ì§ì¹íêž° ìíŽ ë€ë¥ž ìíì ìížê° ì¬ì©ë ì ììµëë€. Dell Inc.ë ìì íì§ ìì ìí ë° ìížì ëí ì¬ì°ì ìŽíŽêŽê³ë¥Œ ë¶ìží©ëë€. 2012ë 12ì ìì€í í¹ì§ íìí ì±ë¥ê³Œ ì 뢰ë륌 ì ê³µíë 볞 UPSë ë€ì곌 ê°ì í¹ì ì ì¥ì ì ì§ëëë€: S ìì ì¬ìží ì¶ë ¥ì ê°ì¶ ìšëŒìž UPS ì€ê³. S ê³ ì ë ¥, ìì© ì ì 죌íì ë 늜ì±, ì ëë ìŽí° ížíì±ì ê°ì¶ ì§ì í ìšëŒìž ìŽì€-ë³í êž°ì S ì ì ë³ëì êµì íì¬ ì¬ì©ìì ë¶íì ëíŽ ì¡°ì ì ìì 볎ì¥íë ì¹ê°ìí ì ì ì¡°ì . S UPSê° ì ì ACì ìì íí°ë§ ë° ì¡°ì íê³ ë°°í°ëŠ¬ë¥Œ ê³ ê°ìí€ì§ ììŒë©Žì ì¥ë¹ì ìì ì ìž ì ìì ê³µêž. S ì í ê°ë¥í ê³ íšìš ìë 몚ë S 5U UPS ëìŽ S ìì© ì ë ¥ì ìŽì©í ì ìë 겜ì°ìë UPSì ì ë ¥ì ê³µêžíë ì€íížìš ë°°í°ëЬ(start-on-battery) ìŽì© êž°ë¥. S UPS륌 ëì§ ìê³ ë ë°°í°ëŠ¬ë¥Œ ìì íê² êµì²Ží ì ìì ë§íŒ ê°ëší ì ì§ë³Žì. S ì멎 íšë LCD ëì€íë ìŽìì Dell ìë¹ì€ íê·ž ì 볎륌 ìœì ì ìì. S Extended Battery Module (EBM) ìµì ìŽ ìë íì¥ ë°íì. S ì격 êžŽêž ì ìì°šëš(REPO) í¬ížë¥Œ íµí êžŽêž ì€ëš ì ìŽ. S íì€ íµì í¬íž 2ê°(USB ë° RS-232 ìëŠ¬ìŒ í¬íž). S ì ì ë³Žíž ë° ì ìŽ ë¥ë ¥ì í¥ìíêž° ìí ê°íë íµì êž°ë¥ì ê°ì¶ Dell Network Management Card ìµì (NMCëŒê³ ë íš). S íë ì í겜ì ìšë ë° ìµë íì ê°ì ìì§íê³ í겜 ë°ìŽí°ë¥Œ ì격ìŒë¡ 몚ëí°ë§ íë ì í ì¬ìEnvironmental Monitoring Probe (EMP) 2ëª ì ì¬ì©ìê° ì ê³µíë ì°ê²° ì¥ì¹ ìí륌 ìì§ ë° ë³ŽêŽ ê°ë¥. S ìì ì ìž ì€ëš ë° ì ì ê°ì륌 ìí Dellt Multi-UPS Management Console (MUMC) and Dellt UPS Local Node Manager (ULNM) ì¹ êž°ë° ìíížìšìŽ ì í늬ìŒìŽì ìŒë¡ ìíëë ê³ êž ì ì êŽëЬ. S ë¡ë ìžê·žëšŒížëŒê³ íë ë³ëì ìœìŒíž 귞룹ì íµí ìì°šì ì€ëš ë° ë¶í êŽëЬ. S ìë¹ì€ ìì² ììŽë ìœê² ì ê·žë ìŽëí ì ìë íìšìŽ. S ìžê³ì ìž ìžìŠêž°êŽì ê°ì¢ ìžìŠ ì·šë. S ENERGY STAR® ìžìŠUPS. ìì€í í¹ì§ | 189 ì 볎 ì°Ÿêž° 죌ì: ìì , í겜, ê·ì ì 볎 묞ìë ì€ìí ìì ë° ê·ì ì 볎륌 ì ê³µí©ëë€. ì°Ÿê³ ì íë í목 S UPS ì¬ì©ì ì€ëª ì ìë£ ìì¹ Dell UPS ëì€í¬ S Dell Network Management Cardì© ì¬ì©ì ì€ëª ì S Dell MUMC and Dell ULNM ì¬ì©ì ì€ëª ì ì°žê³ : 묞ì ë° ìíížìšìŽ ì ë°ìŽíž ì 볎ëwww.support.dell.com www.dellups.comìì ì¡°íí ì ììµëë€. S ì¬ì Dell UPS ì¬ì©ì ì€ëª ì S UPS ì€ì êµ¬ì± ë°©ë² ì¬ì©ì ì€ëª ìë Dell UPS ëì€í¬ ë° www.support.dell.comìì ì¡°íí ì ììµëë€. S ì¥ì ì²ëЬ ë° ë¬žì ì íŽê²° ë°©ë² S REPO ì ìŽ ì€ì¹ ë°©ë² S ìì ì§ìì¬í ìì , í겜, ê·ì ì 볎 S ê·ì ì 볎 S ì¬íì© ì 볎 S ë³ŽìŠ ì 볎 Dell ë³ŽìŠ ë° ì§ì ì 볎 S ìœêŽ(믞êµìë§ ì ì©) S ìµì¢ ì¬ì©ì ëŒìŽìŒì€ ê³ìœ S ì§ì ì 볎 Dell ì§ì ì¹ì¬ìŽíž â www.support.dell.com ì°žê³ : íŽë¹ ì§ì ì¬ìŽížë¥Œ 볎Ʞ ìíŽìë íŽë¹ ì§ì ëë ì¬ì ë¶ë¬žì ì ííììì€. 190 | ì 볎 ì°Ÿêž° ì€ì¹ ë° ìë 죌ì: ìì , í겜, ê·ì ì 볎 묞ìì ì 찚륌 ìííêž° ì ì 볞 묞ìì ìë ìì ì§ì¹š ë° ì€ìí ê·ì ì 볎륌 ìœê³ ì€ìíììì€. 죌ì: ë®ì êž°ìšì í겜ìì ìºë¹ëì í¬ì¥ì ë¯ìŒë©Ž ìºë¹ë ì곌 ìì ìê²° íììŽ ë°ìë ì ììµëë€. ìºë¹ëì ëŽë¶ì ìžë¶ê° ìì 걎조ë ëê¹ì§ë ìºë¹ëì ì€ì¹íì§ ë§ììì€(ê°ì ìí). 죌ì: ë°°í°ëЬ ì€ì¹ ëë ì ê±°ë íì 죌ìì¬íì ëí ì¶©ë¶í ì§ìì ê°ì¶ ì¬ëìŽ ì€ìíê±°ë ê°ë íŽìŒ í©ëë€. ìê²©ìŽ ìë ì¬ëìŽ ë°°í°ëŠ¬ë¥Œ ì·šêžíŽìë ìë©ëë€. 죌ì: ìºë¹ëì 묎ê²ìµëë€(99 kg/218 lb). ìºë¹ëì ë€êž° ì ì UPSìì ë°°í°ëЬ ížë ìŽë¥Œ íì 빌ììì€. ìºë¹ëì ë ììŒë¡ ë€ìŽ ì¬ë € ë£ìŒë €ë©Ž ìµìí 2ìžìŽ íìí©ëë€. ì€ì¹ ë° ìë | 191 죌ì: ë°°í°ëŠ¬ê° ë¬Žê²ìµëë€(32 kg/71 lb). ë°°í°ëŠ¬ë¥Œ ëº ë ì ì íê² ë€ìŽì¬ëŠŽ ì ìë ë°©ë²ì ì¬ì©íììì€. ì°žê³ : ìì륌 ìŽëíê³ ìŽ ëë 죌ìíììì€. ì€ì¹í ì€ë¹ê° ëêž° ì ê¹ì§ë 구ì±íì í¬ì¥ë ì±ë¡ ëììì€. ìŽ ì ì ì¬ì©ìì ìì€í ì ì²ì ì€ì¹íë ì 찚륌 ì€ëª í©ëë€. ìºë¹ë í¬ì¥ íêž° ìì€í ì í¬ì¥ì íë €ë©Ž: 1 ì§ê²ì°š ëë íë íž ìì ì¬ì©íŽ ìŽì¡ ìì ë° íë ížë¥Œ UPSê° ì€ì¹ë ë ê·Œì²ë¡ ì®êž°ììì€. 2 í¬ì¥ ìì륌 íìŽ ì ê±°íììì€. 192 | ì€ì¹ ë° ìë 3 ìì ìë ì€í°ë¡íŒ ë¶ë¶ì íµë¡ 쪜ìŒë¡ ë°ìŽ ë£ì 2ê°ì ë¶ìí ìì륌 빌ììì€. 4 ë¶ìí ìì륌 ìŽê³ ê°ê¹ìŽ ì¥ìì íííê³ ìì ì ìž ê³³ì ëìŒììì€. ì°žê³ : Dell ìšëŒìž ë UPS 10 kW ì¬ì©ì ê°ìŽëë í¬ì¥ì ížë ë°©ë²ê³Œ ì€ì¹ ì ì°šì ëíŽ ì€ëª í©ëë€. ì°žì¡°íìë €ë©Ž, ë¶ìí ìì륌 ë€ë¥ž ê³³ìŒë¡ ëêž° ì ì 뚌ì 빌 ëììì€. 5 ìì ìë ì€í°ë¡íŒì ì ê±°íŽ ê°ê¹ìŽ ì¥ìì ížííê³ ìì ì ìž ê³³ì ëìŒììì€. ì€ì¹ ë° ìë | 193 ì°žê³ : ë°°í°ëЬ ì§ì§ ëžëí·ìë L(ìŒìªœ) ë° R (ì€ë¥žìªœ)ìŽ íìê° ëìŽ ììŽ ì€ì¹ ìì¹ë¥Œ ìë €ì€ëë€. 6 UPSìì ì§ì§ ëžëí·ì 빌ììì€. ìŒìªœ(Lë¡ íì) ì§ì§ ëžëí·ì ìì¹ë¥Œ íìžíììì€. ììì ìŒìªœìì ì ëì¬ë¥Œ ìê³ ë°ë ë°©í¥ìŒë¡ ëë € ìŒìªœ ì§ì§ ëžëí·ì ížììì€. ëžëí·ì ì€ê° êž°ë¥ ìªœìŒë¡ ë°ìŽ ìììì 빌ììì€. ëžëí·ì ë³žìž ìªœìŒë¡ íë í ëžëí·ì ìŒìªœìŒë¡ ë¹ê²š 빌ììì€. ëžëí·ì í 쪜ì ëììì€. ì€ë¥žìªœ(Rë¡ íì) ì§ì§ ëžëí·ì ìì¹ë¥Œ íìžíììì€. ììì ì€ë¥žìªœìì ì ëì¬ë¥Œ ìê³ ë°ë ë°©í¥ìŒë¡ ëë € ì€ë¥žìªœ ì§ì§ ëžëí·ì ížììì€. ëžëí·ì ì€ê° êž°ë¥ ìªœìŒë¡ ë°ìŽ ìììì 빌ììì€. ëžëí·ì ë³žìž ìªœìŒë¡ íë í ëžëí·ì ì€ë¥žìªœìŒë¡ ë¹ê²š 빌ììì€. ëžëí·ì í 쪜ì ëììì€. 7 ë°°í°ëЬ 컀ë¥í°ê° 몚ë ë¶ëЬëìŽ ìëì§ íìžíììì€. 194 | ì€ì¹ ë° ìë 죌ì: ë°°í°ëŠ¬ê° ë¬Žê²ìµëë€(32 kg/71 lb). ë°°í°ëŠ¬ë¥Œ ëº ë ì ì íê² ë€ìŽì¬ëŠŽ ì ìë ë°©ë²ì ì¬ì©íììì€. 8 UPSìì ë°°í°ëЬ ížë ìŽë¥Œ ë€ì곌 ê°ìŽ ë¶ëЬíììì€. ë°°í°ëЬ 칞ì ì쪜ìì ì°ê²°ìŽ íŽì ë UPS ë°°í°ëЬ 컀ë¥í°ë¥Œ ë°©íŽê° ëì§ ìë ê³³ìŒë¡ ì®êž°ììì€. ë°°í°ëЬ ížë ìŽì ì멎ì ìë íëŒì€í± ê³ ëŠ¬ ìë³í륌 ì¡ìŒììì€. ížë ìŽë¥Œ ë³žìž ìªœìŒë¡ ì¡ì ë¹ê²š 빌ììì€. ì°žê³ : ê³ ëŠ¬ ìë³íìì 죌í©ìì ì¡ì ë¹êž°ììì€ ëŒë²šìŽ ìë ê³³ì ì¡ìŒììì€. UPS ìë¶ìì ë¹Œëž ì€í°ë¡íŒì ìë ë°°í°ëЬ ížë ìŽë¥Œ ëìŒììì€. ë ë²ì§ž ë°°í°ëЬì ëíŽ ìŽ ëšê³ë¥Œ ë°ë³µí©ëë€. ì€ì¹ ë° ìë | 195 죌ì: ë°°í°ëŠ¬ë¥Œ ë¹Œëž ìºë¹ëì 묎ê²ìµëë€(46 kg/101 lb). ìºë¹ëì ìŽì¡ ìììì ë€ìŽ ì¬ë € ë£ìŒë €ë©Ž ìµìí 2ìžìŽ íìí©ëë€. 9 ì ížì í ì¬ëì© ì늬í í, íì§ì ìì¡ìŽë¥Œ ì¬ì©íŽ ìºë¹ëìì ì€í°ë¡íŒì ì¡°ì¬ì€ëœê² ë€ìŽ ì¬ëЬììì€. 10 ì€ì¹íê³ ì íë ë곌 ê°ê¹ìŽ ìì í ê³µê°ì íííê³ ìì ì ìž ë°ë¥ì ìºë¹ëì ëìŒììì€. ì°žê³ : íêž°ê° ì ëê³ , ìµêž°, ìžíì± ê°ì€, ë° ë¶ìë¬ŒìŽ ìë 볎ížë ê³µê°ìžì§ ì¬ë¶ë¥Œ íìžíììì€. 196 | ì€ì¹ ë° ìë ëë§ìŽíž ì€ì¹ 죌ì: ìºë¹ëì 묎ê²ìµëë€(99 kg/218 lb). íì UPSìì ë°°í°ëЬ ížë ìŽë¥Œ ëº íì ìºë¹ëì ë€ìŽ ì¬ëŠ¬ê³ ëì ë ìŒ ë©Žì UPS륌 ì€ì¹íììì€. ìºë¹ëì ë ììŒë¡ ë€ìŽ ì¬ë € ë£ìŒë €ë©Ž ìµìí 2ìžìŽ íìí©ëë€. 죌ì: ë°°í°ëЬ ì€ì¹ ëë ì ê±°ë ë°°í°ëЬì ê·ž 죌ìì¬íì ëíŽì ì ìë ì¬ëìŽ ìííê±°ë ê°ë íŽìŒ í©ëë€. ìê²©ìŽ ìë ì¬ëìŽ ë°°í°ëŠ¬ë¥Œ ì·šêžíŽìë ìë©ëë€. 죌ì: ë°°í°ëŠ¬ê° ë¬Žê²ìµëë€(32 kg/71 lb). ë°°í°ëŠ¬ë¥Œ ëº ë ì ì íê² ë€ìŽì¬ëŠŽ ì ìë ë°©ë²ì ì¬ì©íììì€. 죌ì: EBM ìµì ì ì€ì¹íë 겜ì°, UPS ë° EBM ì¬ìŽì U ê³µê°ìŽ ìëë¡ EBMë UPS ìë«ë©Žì ëììŒ í©ëë€. ìŽë ê² í멎 ëì 묎ê²ë¥Œ ê³šê³ ë£š ë¶ì° ìí¬ ì ììŽ UPS ì ìŽ íšëì ë ìœê² ì ê·Œíê³ ë°°í°ëЬ ìŒìŽëž ì°ê²°ì ëì± ìœê² ëŒì°í í ì ììµëë€. ëí EBM ìœë ë° UPS ì°ê²° ì¬ìŽì ìë ¥ì ì°šëšíê³ ì°ê²° ì€íš ê°ë¥ì±ì ë°©ì§í©ëë€. ê²œê³ : ë ì¥ì°© ìì€í êŽë š: ëìì ì¬ë¬ ê°ì§ ìì€í ì ì€ì¹ íë 겜ì°, íì¬ ìì€í 곌 êŽë ší ì 찚륌 몚ë ìë£í íì ë€ì ì 찚륌 ì€ìíììì€. ì°žê³ : ê°ë³ ìºë¹ë ë³ë¡ íì¬ ë ìŒìŽ íìí©ëë€. ì°žê³ : ìºë¹ëì ì멎 ì»€ë² íìŽ ìë ì±ë¡ ìŽì¡ë©ëë€. ì°žê³ : ì¬ê° êµ¬ë© ë곌 ëì¬ì° ìë ìí êµ¬ë© ëì ëí ì€ì¹ ì§ì¹šì ëìŒí©ëë€. 볞 ë ìŒì ë ì¢ ë¥ì ëì 몚ë ë§ìµëë€. ëì UPS륌 ì€ì¹íë €ë©Ž: 1 UPS륌 ì€ì¹íê³ ì íë ë곌 ê°ê¹ìŽ ì¥ìì ížííê³ ìì ì ìž ë°ë¥ì ë€ììŽ ìë ì§ íìžíììì€. S ìºë¹ë S UPS ë¶ìí ìì 2ê° S ë°°í°ëЬ ížë ìŽ 2ê°(UPSë§ íŽë¹) S ë°°í°ëЬ ì§ì§ ëžëí· 2ê°(UPSë§ íŽë¹) ì€ì¹ ë° ìë | 197 ë ìŒ ì€ì¹íêž° 2 ë ìŒ í€íž ë¶ìí ìììì ë ìŒì 빌ììì€. 3 ìºë¹ëì ëì ìíë ìì¹ì ì€ì¹í ì ìëë¡ ë ìŒìì ì ë¹í 구ë©ì ì ííììì€. UPSì©ìŒë¡ í ë¹ë 5U ê³µê° íëšìì ë ìŒì ëìŒììì€. 죌ì: EBM ìµì ì ì€ì¹íë 겜ì°, UPS ë° EBM ì¬ìŽì U ê³µê°ìŽ ìëë¡ EBMë UPS ìë«ë©Žì ì§ì ëì ì ìëë¡ ì€ë¹íììì€. ì°žê³ : ì°ìž¡ ì멎(RIGHT FRONT) ë° ì¢ìž¡ ì멎(LEFT FRONT)ì ë ìŒì ë¶ìŽìë ëŒë²š ëŽì©ì ë°ë¥Žììì€. ëŒë²šì ë ìŒìŽ ì€ì¹ëìŽìŒ íë ë°©í¥ì íìí©ëë€. 4 íìë ë°©í¥ëë¡ ìŒìªœ ë° ì€ë¥žìªœ ë ìŒì ëìŒììì€. ìŒìªœ ë° ì€ë¥žìªœ ë ìŒì ëì ë¶ì°©íììì€. ë ìŒ íëšìŽ ìì§ ë íëì§(rack flange)ì ìì í ìì°©ëê³ ê³ ëŠ¬ 걞ì (hook latch)ê° ì ì늬ì ì 겚ì§ëë¡ ë§ì¶¥ëë€. ëì ì멎ì ë°ë¡ ì§ëëë¡ ë ìŒì ì¡ìë¹êž°ììì€. ë ìŒ ì ëšìŽ ìì§ ë íëì§ì ìì í ì늬ì¡ê³ ê³ ëŠ¬ 걞ì ê° ì ì늬ì ì 겚ì§ëë¡ ë°ëë€. 198 | ì€ì¹ ë° ìë ìºë¹ë ì€ì¹ ë° ê³ ì íêž° 죌ì: ë°°í°ëŠ¬ë¥Œ ë¹Œëž ìºë¹ëì 묎ê²ìµëë€(46 kg/101 lb). ìºë¹ëì ë ììŒë¡ ë€ìŽ ì¬ë € ë£ìŒë €ë©Ž ìµìí 2ìžìŽ íìí©ëë€. 5 ìºë¹ëì ë ìŒ ìªœìŒë¡ ë°ìŽ ë ì쪜ìŒë¡ 믞ììì€. 6 ì¥ì°© ëžëí·ì ìë ì ëì¬ 4ê°ë¥Œ ìŽì©íì¬ ìºë¹ë ì멎ì ëì ê³ ì ìíµëë€. ììŒë¡ ì ëì¬ë¥Œ ì¡°ìŽê³ , ì êž° 공구ë ì¬ì©íì§ ë§ììì€. ë°°í°ëЬ ížë ìŽ ì€ì¹íêž° 7 ë 죌ë³ì ë°°í°ëЬ ížë ìŽë¥Œ ëìŒììì€. ì€ì¹ ë° ìë | 199 죌ì: ë°°í°ëŠ¬ê° ë¬Žê²ìµëë€(32 kg/71 lb). ë°°í°ëŠ¬ë¥Œ ì€ì¹í ë ì ì íê² ë€ìŽì¬ëŠŽ ì ìë ë°©ë²ì ì¬ì©íììì€. ì°žê³ : ë°°í°ëЬ ížë ìŽë ë°°í°ëЬ 칞ì í 쪜ì ì€ì¹í ì ììµëë€. ì°žê³ : ížë ìŽì 죌ì ëŒë²š íìŽíê° ì쪜ì í¥íëë¡ ë£ìŒììì€. 8 ë°°í°ëЬ ížë ìŽ ì€ì¹íêž°: ë°°í°ëЬ 칞ì ì쪜ìì UPS ë°°í°ëЬ 컀ë¥í°ë¥Œ ë°©íŽê° ëì§ ìë ê³³ìŒë¡ ì®êž°ììì€. ë°°í°ëЬ ížë ìŽë¥Œ ë°°í°ëЬ 칞ìŒë¡ ì벜íê² ë°ìŽ ë£ìŒììì€. ë ë²ì§ž ë°°í°ëŠ¬ë¥Œ ì€ì¹íë €ë©Ž ì ëšê³ë¥Œ ë°ë³µíììì€. 9 ê³ ëŠ¬ ìë³í륌 ë°°í°ëЬ ížë ìŽ ì멎ì íëŒì€í± 볎ížêŽìŒë¡ ë°ìŽ ë£ìŽ ë°©íŽê° ëì§ ìëë¡ íììì€. ëŽì¥ ë°°í°ëЬ 컀ë¥í° ì°ê²°íêž° 10 ëŽì¥ ë°°í°ëЬ 컀ë¥í°ë¥Œ ì°ê²°í©ëë€. ì ìŒ ìŒìªœì ìë ë°°í°ëЬ ížë ìŽ ì»€ë¥í°ë¥Œ ê³ ì UPS 컀ë¥í°ì ì°ê²°íììì€. ì ìŒ ì€ë¥žìªœì ìë ë°°í°ëЬ ížë ìŽ ì»€ë¥í°ë¥Œ ê³ ì UPS 컀ë¥í°ì ì°ê²°íììì€. ì°žê³ : ë°°í°ëŠ¬ë¥Œ ì°ê²°í ë ìëì ìí¬(arc)ê° ë°ìí ì ììµëë€. ìŽë° íìì ì ìì ìŽë©° êž°êž°ì ììì 죌거ë ìì ìì 묞ì 륌 ëíëŽë ê²ì ìëëë€. ì€ê° êž°ë¥ì í 쪜ì ìë ë°°í°ëЬ ì íŒë¥Œ ëê³ ì°ê²°íììì€. ì€ê° êž°ë¥ì ì쪜ì ìë ìì ì ë°ì 컀ë¥í°ë¥Œ ëìŒììì€. ì°žê³ : ì€ê° ë°°í°ëЬ ì íŒë¥Œ ì°ê²°í멎 2 ê°ì§ì ë°°í°ëЬ ížë ìŽë¥Œ ì°ìì ìŒë¡ ì°ê²°íê² ë©ëë€. 200 | ì€ì¹ ë° ìë ë°°í°ëЬ ì§ì§ ëžëí· ì ê±°íêž° ìì 쪜 íµë¡ ì€ê° êž°ë¥ ìªœ íµë¡ ì°žê³ : ë°°í°ëЬ ì§ì§ ëžëí·ìë L(ìŒìªœ) ë° R (ì€ë¥žìªœ)ìŽ íìê° ëìŽ ììŽ ì€ì¹ ìì¹ë¥Œ ìë €ì€ëë€. 11 ìŒìªœ(L) ë° ì€ë¥žìªœ(R) ë°°í°ëЬ ì§ì§ ëžëí·ì êµì²Žíììì€. 첫 ë²ì§ž ë°°í°ëЬ ì§ì§ ëžëí·ìì ëžëí· ìë³í륌 ì€ì êž°ë¥ì í 쪜 멎ì íµë¡ë¡ ìœì íììì€. ì°ê²°ë ë°°í°ëЬ ìŒìŽëžì ì§ì§ ëžëí· ë€ìªœìŒë¡ ìì íê² ëìŒììì€. ë°°í°ëЬ ì§ì§ ëžëí·ì ë 쪜ì ììì íµë¡ 쪜곌 ë§ì¶ììì€. ëžëí·ì í 쪜 멎ì íµë¡ì ëšëší ê³ ì ë ë ê¹ì§ ë°ìŽ ë£ìŒììì€. ì ëì¬ë¥Œ ìê³ ë°©í¥ìŒë¡ ëë € ëžëí·ì ê³ ì íììì€. ì ì 찚륌 ë°ë³µíŽ ë ë²ì§ž ë°°í°ëЬ ì§ì§ ëžëí·ì êµì²Žíììì€. UPS ì멎 ì»€ë² ì€ì¹íêž° 12 ë¶ìí ìììì ì멎 컀ë²ë¥Œ 빌ììì€. ì€ì¹ ë° ìë | 201 ì°žê³ : UPS륌 ì€ì¹í ë ê¹ì§ ìíížìšìŽ CD, íµì ìŒìŽëž ë° íìí ê²œì° REPO 컀ë¥í°ë¥Œ ë¶ìí ììì 볎êŽíììì€. 1 2 13 UPS ì멎 컀ë²ë¥Œ ì€ì¹íììì€. ìì ì멎곌 ì멎 컀ë²ë¥Œ ë§ì¶ììì€. ì멎 컀ë²ì ì€ë¥žìªœ ìë³í륌 ì€ë¥žìªœ ììì ìë³í ê°êµ¬ë¶ 쪜ìŒë¡ ìœì íììì€. ì»€ë² ìŒìªœì ì쪜ìŒë¡ ë°ìŽ ë£ê³ ììì ë§ì¶ììì€. ì°žê³ : LCD ììì LCD íšëìŽ ì 멎 컀ë²ì LCD 찜곌 ë§ëì§ íìží í ììì 컀ë²ë¥Œ ê³ ì íììì€. 14 ì ì íê² í¬ì¥ë¬Œì íêž°íê±°ë ì¬íì©íê³ , ëë ì¶í ì¬ì©ì ìíŽ ë³ŽêŽíŽ ëììì€. 202 | ì€ì¹ ë° ìë ì¥ë¹ì ì°ê²°íêž° UPS륌 ì€ì¹íë €ë©Ž: 1 Dell MUMC and Dell ULNM ìíížìšìŽë¥Œ ì¬ì©íê³ ì íë ê³íìŽ ìë€ë©Ž, ë€ì곌 ê°ì ë°©ìì ì¬ì©íŽ íµì 첎ê³ë¥Œ 구ì¶íììì€. S Dell Network Management Card ì¬ì©íêž°(ì€ì¹ë 겜ì°) S ê³µêžë ìŒìŽëžì ì¬ì©íŽ USB í¬ížì 컎íší° ì°ê²°íêž° ì°žê³ : íµì ìµì ì ëí ì¶ê° ì 볎ë Dell ìšëŒìž ë UPS 10 kW ì¬ì©ì ê°ìŽë륌 ì°žì¡°íììì€. 2 ì ì§ëì§ ìì êžì ë¶íì ì ì§íê±°ë ê²°ìíë ëì²Žê° ëì ìë€ë©Ž, ì ì§ ìŒìŽëž(ë¹ ì ê³µí)ì ì ì§ ê²°ì ëì¬ì ì°ê²°íììì€. ìž ê°ì§ì ëªšëž ë³ë¡ ì ê³µë ì ì§ ëì¬ì ìì¹ì ëíŽìë 210íìŽì§ì "UPS ë·ë©Ž íšë"ì ì°žê³ íììì€. 3 íì§ ê·ì ì ë°ëŒ êžŽêž ì ìì°šëš(ì°ê²°íŽì ) ì€ìì¹ê° íìíë€ë©Ž, Dell ìšëŒìž ë UPS 10 kW ì¬ì©ì ê°ìŽëì "ì격 êžŽêž ì ìì°šëš ì€ì¹"륌 ì°žì¡°íììì€. 4 EBM ìµì ì ì€ì¹íë 겜ì°, ì€ì¹ ìëŽë Dell ìšëŒìž ë EBM 10 kW ììíêž° ê°ìŽë륌 ì°žì¡°íììì€. 죌ì: EBM ììŽ UPS륌 볎êŽíê±°ë ì¬ì©í 겜ì°, UPS ë€ìªœ íšëì ë°°í°ëЬ 컀ë¥í° 컀ë²ë¥Œ ìì 죌ì ì¬íì ë°ëŒ ì€ì¹íŽìŒ í©ëë€. 5 볎íží ì¥ë¹ë¥Œ UPS ì¶ë ¥ ìœìŒížì êœë ìŒì§ë ë§ììì€. 6 ìœë ê°ë¬ŽëЬ ë° ìŒìŽëž ìë ¥ ìí륌 ìíŽ íìí ì¥ì¹ë¥Œ ê°ì¶ììì€. ì°žê³ : 곌ë¶í 겜볎륌 ë°©ì§íë €ë©Ž ì¥ë¹ì ì 첎 ì 격 ì¬ììŽ UPS ì©ëì ìŽê³Œíì§ ìëë¡ íìží©ëë€. ì€ì¹ ë° ìë | 203 UPS ì ë ¥ì¥ì¹ ì§ì ë°°ì íêž°(hardwiring) ê²œê³ : ê°ì ìí. ê³µì ìë¹ì€ ìì(멎íê° ìë ì êž°êž°ì¬ ë±)ë§ìŽ ì êž° ì€ì¹ë¥Œ í ì ììµëë€. Dell ìšëŒìž ë ì§ì ë°°ì (hardwired) 몚ëžìë ìëì ì걎ì 충족ìí€ë ì ì© ë¶êž°íë¡(branch circuit)ê° íìí©ëë€: S 볎ížì¥ì¹ìë UPS ì ë ¥ê³Œ ë©ìž ì¬ìŽì 2-ê·¹ ì°šëšì¥ì¹ê° íìíš. S ì°šëšêž°ë 벜ì ì€ì¹íë ìì ìê° ìœê² ì ê·Œ ê°ë¥íŽìŒ íš S ì ëœì© ëžëí·ì IEC/EN 60934 íì€ì 충족íê³ 3mm ìŽìì 공극ì í볎íŽìŒ íš S 200-240 Vac S ëšì S 50/60 Hz S ì ì°í êžì ì ì êŽ(ìíí ì ë¹ ë° ì ì§êŽëŠ¬ë¥Œ ìíŽ ê¶ì¥íš) 벜멎 2-ê·¹ ì°šëšêž° ëŒìž AC ë©ìž ì ì UPS ì€ëŠœ/L2 204 | ì€ì¹ ë° ìë í°ë¯žë ëžë¡ ì»€ë² ë¶ëЬíêž° ë ¹ìì 구ë©d í°ë¯žë ëžë¡ ì»€ë² 1 UPS(묎ì ì ì ì) ì°ê²° ë¶ë°°ì§ì ìì ìì© ì ìì ì€ìì¹ë¥Œ ëëë€. ì ë ì ììŽ ê³µêžëìŽìë ìë©ëë€. 2 í°ë¯žë ëžë¡ 컀ë²ë¥Œ ë¶ëЬí©ëë€(ëì¬ 2ê°). 3 ë ¹ìì 구ë©ì ì ë ¥ ì ì êŽì© í°ë¯žë ëžë¡ 컀ë²ìì 빌ììì€. 구ë©ì 1â ëë 1.5â (25.4 mm or 38.1 mm) IMC(Intermediate Metal Conduit)ì ë§ììŒ í©ëë€. ì€ì¹ ë° ìë | 205 죌ì: UPSì ìë¥(backfeed)ì êŽë ší ìë ë³Žíž ì¥ì¹ê° ìë€ë©Ž, ìžë¶ ì°šëšì¥ì¹ë¥Œ ì€ì¹íììì€. ì¥ì¹ë¥Œ ì€ì¹í í ìžë¶ AC ì ìŽì¥ì¹(contactor)ì ìëì ê°ì 묞구ì ê²œê³ íì륌 ë¶ì¬ìŒ í©ëë€. ì ì ìë¥(backfeed) ìíì± ë³ž íë¡ìì ìëíêž° ì ì UPS륌 ë¶ëЬìí€ê³ ëì 몚ë ëšìì ìíí ì ììŽ ìëì§ íìžíììì€. ìžë¶ ë¶ì ë° UPS Legend Q T L/L1 L/L1 N/L2 N/L2 B Q T N/L2 L/L1 ìœìŒ ì격 ì€ìì¹ ë§ê·žë€í ìŽ ì ë ¥ ë©ìž ì€ìì¹ AC ì ìŽ ì¥ì¹ ì€ëŠœ/L2 L1 ëŒìž ì ë ¥ B ë€ì íë ìë¥(backfeed)륌 ì°šëšíë ìžë¶ ì°šëš ì¥ì¹ë¡ ì¬ì©í ì ìë ìë¥(backfeed) ë°©ì§ ì¥ì¹(AC ì ìŽì¥ì¹)ì 목ë¡ì ëë€. í ìŽëžì ëìŽë AC ì ìŽ ì¥ì¹ë§ì ì¬ì©íììì€. ì ì¡°ì¬ ì í ì 격 A75-30 220~240VAC 105A 25 HP at 208V, 30HP at 240V Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (ë첎) GSC1(CJX4-d)-6511 220~240VAC 68A 25 HP Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (ë첎) GSC1(CJX4-d)-8011 220~240VAC 80A 30 HP ABB France(E12527) ì°žê³ : UPSì ìë¥ ë°©ì§(ABF) ê³ì êž°ë ìì§ë§ ìŒë¶ ìë¥ ë°©ì§ ìì€í ìŽ ì ê³µë©ëë€. ì륌 ë€ìŽ, ë°°í°ëЬ 몚ëìì ìŒë¶ êµ¬ì± ììê° ììë 겜ì°, ì¶ë ¥ ì ììŽ ì ë ¥ ì ììŒë¡ ìë¥í ì ììµëë€. ìŽë¬í 겜ì°ì, ë³ë¥êž°(CT)륌 ì¬ì©íŽ ì°íëê³ ìë ì ë¥ íŒëë°± ì ìì íì§í©ëë€. ì ë¥ ìë¥(backfeed) ì€ë¥ ìí©ìŽ íì§ë멎 UPSê° ìžë²í° ì¶ë ¥ì ì¢ ë£íŽ ì 첎ì ìíŽë¥Œ ë°©ì§í©ëë€. 206 | ì€ì¹ ë° ìë ì ë ¥ ë°°ì ë° ì ì§ì ì€ì¹íêž° 1 2 3 4 60.96 cm (0.5m) ì ëì ë žì¶ì ë§ ëšêž°ê³ ì ì êŽì íµíŽ ì ë ¥ ì ì ì ì¡ìë¹ê¹ëë€. ì ì êŽì ëì ì°ì± êžì ì¥ì¹ë¥Œ ë¶ì°©í©ëë€. 5 ë°°ì ì ê·Œ ìížëŠ¬ë¥Œ íµíŽ ì ì êŽì ìœì íê³ íŽë¹ íšëì ì ì êŽ ì¥ì¹ë¥Œ ë¶ì°©í©ëë€. ê° ëì ì ëì ì ì°ì²Žë¥Œ 0.5â(1.5 cm) ë²ê¹ëë€. 6 ë€ì íì UPS ë°°ì ì¬ìì ë°ëŒ ì ë ¥ ë° ì ì§ì ì í°ë¯žë ëžë¡ì ì°ê²°íììì€. ë°°ì êž°ë¥ ì ë ¥ í°ë¯žë í¬ì§ì UPS ì ì êž°ë¥ 1 ì ë ¥ ì ì§ 2 L2/ì€ëŠœ In 3 L1 In í°ë¯žë ë°°ì ê·ê²© ë±êž* í í¬ ê°í 16?5 mm2 (8? AWG) 1.7 Nm (15 lb-in) * ìµì ì¬ì©ì¡°ê±Ž: S 8 ì ì§ ì¥ë¹ì© AWG, 75_C ëì ìµì 조걎 S 4 ì ë ¥ëŒìž ë° ì€ëŠœ ììŽìŽ ì© AWG, 75_ ëì ìµì조걎 7 í°ë¯žë ëžë¡ 컀ë²ë¥Œ ì ì늬ì ë€ì ë¶ì°©í©ëë€. ì€ì¹ ë° ìë | 207 UPS ìëíêž° ON/OFF ë²íŒ UPS륌 ìëíë €ë©Ž: 1 ëŽì¥ ë°°í°ëŠ¬ê° ì°ê²°ëìŽ ìëì§ íìží©ëë€. 2 EBM ìµì ìŽ ì€ì¹ëìŽ ììŒë©Ž UPSì EBMìŽ ì°ê²°ëìŽ ìëì§ íìží©ëë€. ì¶ê° ì 볎ë Dell ìšëŒìž ë EBM 10 kW ììíêž° ê°ìŽë륌 ì°žì¡°íììì€. 3 ë¡ë ìžê·žëšŒíž íë¡ ì°šëšêž°ê° 몚ë ON ìì¹ì ìëì§ íìží©ëë€. 4 죌 ìì© ì ì ì°šëšêž°ë¥Œ ìŒëë€. UPS LCD íšëì íìì¥ì¹ê° ìŒì§ëë€. Dell ìì íë©ŽìŽ UPS ìí ììœ í멎ìŒë¡ ë°ëëë€. UPS ì멎 íšë íìì¥ì¹ì ì 멞íë ëêž° ììŽìœ ìŽ ëíë©ëë€. 5 UPS ì멎 íšëì On/Off ë²íŒì ë륎ììì€. ìëìŽ ìë£ë í ìíë UPS ìë 몚ëì ë°ëŒ ë³ê²œë©ëë€. 208 | ì€ì¹ ë° ìë 6 UPS ìí ììœ í멎ìì, íì± ê²œë³Žë íµì§ë¥Œ íìžíë €ë©Ž ë²íŒì ëëŠ ëë€. íì ìì ì ê³ìíêž° ì ì íì± ê²œë³Žë¥Œ ì²ëЬí©ëë€. Dell ìšëŒìž ë UPS 10 kW ì¬ì©ì ê°ìŽëì "ì¥ì ì²ëЬ"륌 ì°žì¡°íììì€. íì± ê²œë³Žê° ìì 겜ì°, "íì± ê²œë³Ž ìì" ë©ìì§ê° ëíë©ëë€. 7 ì ì ììŽìœ ìŽ UPS ìí ììœ í멎ì ëíë UPSê° ì ìì ìŒë¡ ìëíê³ ëªšë ë¶íì ì ììŽ ê³µêžëê³ ììì íìíëì§ íìží©ëë€. 8 ì¶ê° ì 볎ë Dell ìšëŒìž ë UPS 10 kW ì¬ì©ì ê°ìŽë륌 ì°žì¡°íììì€. S ìžë¶ ë°°í°ëЬ 몚ë (EBM)ìµì ìŽ ì€ì¹ë ê²œì° êµ¬ì± ì ì°š S ìŒì ë° ìê°ì ì€ì íê³ êž°í ê³µì¥ ì¶í Ʞ볞 ê° ë³ê²œ 9 ë§ìœì ì íì¬ììž REPOê° ì€ì¹ëìŽ ìë€ë©Ž ë€ì곌 ê°ìŽ REPOì êž°ë¥ì ìíí©ëë€: ìžì¥ REPO ì€ìì¹ë¥Œ ìŒëë€. UPS íìì¥ì¹ì ìí ë³ê²œì íìží©ëë€. ìžì¥ REPO ì€ìì¹ë¥Œ ëê³ UPS륌 ë€ì ìëí©ëë€. 10 ë°°í°ëЬ ì¶©ì íêž° ì°žê³ : ëŽì¥ ë°°í°ëЬë 3ìê° ìì ì¶©ì ì©ëì 90%ê° ì¶©ì ë©ëë€. ëš ì€ì¹ ëë ì¥êž°ê° ë³ŽêŽ ìŽíìë ë°°í°ëŠ¬ë¥Œ 48ìê° ëì ë°°í°ëŠ¬ë¥Œ ì¶©ì íŽìŒ í©ëë€. 죌ì: UPS 곌ë¶í ìí륌 ë°©ì§íë €ë©Ž, íë²ì ë¡ë륌 íë² ì°ê²°íê³ ë€ì ë¡ë륌 ì°ê²°íêž° ì ì ë³Žíž ì¥ì¹ ë³ë¡ ì벜íê² ìëíë ì§ íìžíììì€. ì°žê³ : Dellë 묞ì íŽê²° ëë ë³ŽìŠ ëª©íì ë§ê² ìŒì ë° ìê°ì ì€ì í ê²ì ê¶ê³ í©ëë€. ì°žê³ : ììŽ ìëìì UPSë ì ë ¥ëŒìž 죌íìì ë°ëŒ ìì€í 죌íì륌 ì€ì í©ëë€(ì ë ¥ 죌íì ìëê°ì§êž°ë¥ì ëíŽížë¡ íì±íë©ëë€). ììŽ ìë ìŽíì ìëê°ì§ êž°ë¥ì ì¶ë ¥ì£Œíì ì€ì ì ì¬ì©íŽ ìëìŒë¡ ìëí ë ê¹ì§ íì±íëì§ ììµëë€. ì€ì¹ ë° ìë | 209 ì°žê³ : ììŽ ìëìì ì ë ¥ì ì ìëê°ì§ êž°ë¥ì ëíŽížë¡ íì±íë©ëë€. ë€ì ë² ìë ìŽíì ìëê°ì§ êž°ë¥ì ì¶ë ¥ ì ì ì€ì ì ì¬ì©íŽ ìëìŒë¡ ìëí ë ê¹ì§ íì±íëì§ ììµëë€. UPS ë·ë©Ž íšë íìž ë³ž ë¶ë¶ì ìž ê°ì§ì Dell ìšëŒìž ë 10 kWUPS 몚ëžì ë·ë©Ž íšë ìµì ì ëíë ëë€. 10 kW 208V UPS (DELL10KWOLHVUS) UPS íµì ë² ìŽ One NEMA L6-30R ìœìŒíž IEC 320-C19 ìœìŒíž 2ê° 2ê°ì ì¶ë ¥ íë¡ì°šëšêž° ë¡ë ìžê·žëšŒíž 1(LS1) 210 | ì€ì¹ ë° ìë ì ì§ëì¬ REPO EBM í¬íž 컀ë¥í° RS-23 USB 2 í¬íž í¬íž One NEMA L6-30R ìœìŒíž IEC 320-C19 ìœìŒíž 2ê° 2ê°ì ì¶ë ¥ íë¡ì°šëšêž° ë¡ë ìžê·žëšŒíž 2(LS2) ì ë ¥ ëšìë 10 kW 230V UPS (DELL10KWOLHV) UPS íµì ë² ìŽ 2ê°ì ì¶ë ¥ íë¡ì°šëšêž° RS-23 USB 2 í¬íž í¬íž IEC 320-C19 IEC 60309 ìœìŒíž 2ê° 332R6S ìœìŒíž 1ê° ë¡ë ìžê·žëšŒíž 1(LS1) REPO í¬íž EBM 컀ë¥í° ì¶ë ¥ íë¡ ì°šëšêž° 1ê° IEC 60309 332R6S ìœìŒíž 1ê° ì ì§ëì¬ ì ë ¥ ëšìë ë¡ë ìžê·žëšŒíž 2(LS2) ì€ì¹ ë° ìë | 211 10 kW 230V UPS (DELL10KWOLHVB) UPS íµì ë² ìŽ RS-23 2 í¬íž 2ê°ì ì¶ë ¥ íë¡ì°šëšêž° IEC 320-C19 ìœìŒíž 4ê° ë¡ë ìžê·žëšŒíž 1(LS1) 212 | ì€ì¹ ë° ìë USB í¬íž REPO í¬íž 2ê°ì ì¶ë ¥ íë¡ì°šëšêž° EBM 컀ë¥í° IEC 320-C19 ìœìŒíž 4ê° ë¡ë ìžê·žëšŒíž 2(LS2) ì ì§ëì¬ ì ë ¥ ëšìë Dellt ãªã³ã©ã€ã³åŒã©ãã¯åUPS 10 kW ã¯ããã« ã·ã¹ãã ã«ã€ã㊠DELL10KWOLHVUS, DELL10KWOLHV, DELL10KWOLHVB DELL10KWEBM www.dell.com | www.support.dell.com | www.dellups.com 泚èšããã³èŠå 泚èšïŒ ãæ³šèšãã¯ãœãããŠã§ã¢ãæå¹ã«å©çšããããã®éèŠãªæ å ±ã瀺ããŠããŸãã å±éºïŒ ãå±éºãã¯ãåé¿ããªãå Žåã¯æ»äº¡ãŸãã¯éå·ã«ã€ãªããåè¿«ããå±éºãªç¶æ³ã瀺ããŠããŸãã èŠåïŒ ãèŠåãã¯ãåé¿ããªãå Žåã¯æ»äº¡ãŸãã¯è² å·ã«ã€ãªãããããã®ããæœ åšçã«å±éºãªç¶æ³ã瀺ããŠããŸãã æ³šæïŒ ãæ³šæãã¯ãåé¿ããªãå Žåã¯è»œå·ãŸãã¯äžçšåºŠã®å·å®³ã ãããã¯ç©çæå®³ã«ã€ãªããå¯èœæ§ãããæœåšçã«å±éºãªç¶æ³ã瀺ããŠããŸãã å±éºïŒ 以äžã®æ³šæäºé ããããèªã¿ã«ãªããåé¿ããªãå Žåã¯æ»äº¡ãŸãã¯éå· ã«ã€ãªããåè¿«ããå±éºãªç¶æ³ã«ãªããªãããã«ããŠãã ããã S ãã®UPSã®äžã«ã¯ èŽæ»çãªé»å§ ãæãã£ãŠããŸãããã¹ãŠã®ä¿®çãæŽåã¯ å ¬èªãµãŒãã¹ã¹ã¿ããã®ã¿ ãè¡ã£ãŠãã ãããUPSå ããã³EBMå ã«ã¯ ãŠãŒã¶ãŒãä¿®çå¯èœãªéšå ã¯ãããŸããã åœè³æã®æ å ±ã¯äºåãªã倿ŽãããããšããããŸãã E 2012 Dell Inc. ç¡æè€åã»è»¢èŒãçŠããŸãã Dell Inc.ã®æžé¢ã«ããèš±å¯ãåŸãŠããªãè€åã¯ãããªã圢æ ã«ãããŠãå³éã«çŠããããŠããŸãã åœããã¹ãã«äœ¿çšãããŠããç»é²åæšïŒ Dell ãã DELL ã®ããŽã¯Dell Inc.ã®ç»é²åæšã§ãã ENERGY STAR ã¯ãã¢ã¡ãªã«ç°å¢ä¿è·åºææã®ç»é²åæšã§ãã ãã®ä»ã®ç»é²åæšããã³åæšåã¯ãæ¬æžã®äžã§ãããåæšãåç§°ã䞻匵ããäºæ¥äœããããã¯è£œåã®ããããã«èšåããã ãã«äœ¿çšãããããšããããŸãã 2012幎12æ ã·ã¹ãã ã®ç¹åŸŽ UPSã¯åªããæ§èœããã³ä¿¡é Œæ§ãæäŸãã以äžã®ãããªç¬èªã®å©ç¹ããããŸãã S æ£åŒŠæ³¢åºåã®ãããªã³ã©ã€ã³UPSèšèšã S é«åºåå¯åºŠãåçšåšæ³¢æ°äŸåæ§ãçºé»åšã®äºææ§ãæã€ãªã³ã©ã€ã³äºé倿æè¡ã S é»å§å€åãä¿®æ£ããããšã§ãè² è·ãžå®å®ããé»å§ãä¿èšŒãããæéå§ãé»å§èª¿ç¯ã S UPSã¯å ¥åããã亀æµé»åããã£ã«ã¿ãŒåŠçã調ç¯ããããããªãŒãæ¶èããã«æ©åšãžå®å® ããé»åãäŸçµŠããŸãã S éžæå¯èœãªäœåã®é«æ§èœã¢ãŒãã S 5U UPSã®é«ã S å€éšé»åããªããšãã§ãUPSã®é»åãå ¥ããããšãã§ããå§å黿± ã®èœåã S UPSã®é»æºãåããã«ããããªãŒãå®å šã«äº€æããããšãã§ãããããã¡ã³ããã³ã¹ãç°¡å ã§ãã S DellãµãŒãã¹ã¿ã°æ å ±ã¯LCDãã£ã¹ãã¬ãŒã®ããã³ãããã«ããèªã¿åãããšãã§ããŸãã S ãªãã·ã§ã³ã®External Battery Module(EBM)ä»ãæ¡åŒµå®è¡æéã S ãªã¢ãŒããšããŒãžã§ã³ã·ãŒãã¯ãŒãªãïŒREPOïŒããŒããéããç·æ¥ã·ã£ããããŠã³å¶åŸ¡ã S æšæºéä¿¡ããŒã2åïŒUSBããã³RS-232ã·ãªã¢ã«ããŒãïŒ S ãªãã·ã§ã³Dell Network Management Card (å¥åNMCãšåŒã°ããïŒãšããŠãé»åã®ä¿è·ãå¶åŸ¡ã®æ¡åŒµãã§ããé«åºŠéä¿¡æ©èœä»ãã S ãã¬ãŒã ç°å¢ã®æž©åºŠãšæ¹¿åºŠã®èšæž¬å€ãåéãç°å¢ããŒã¿ããªã¢ãŒãã§ç£èŠããããã®ãªãã· ã§ã³ã® Powerware Environmental Monitoring Probe (EMP)ã 2ã€ã®ãŠãŒã¶ãŒæäŸéä¿¡ããã€ã¹ã®ã¹ããŒã¿ã¹ã®åéãšååã«ã䜿çšã§ããŸãã S æ£åžžãªéè»¢åæ¢ãé»åç£èŠçšã®Dellt Multi-UPS Management Console (MUMC) and Dellt UPS Local Node Manager (ULNM) ãŠã§ãããŒã¹ã®ãœãããŠã§ã¢ã¢ããªã±ãŒã·ã§ã³ã䜿çšããé«åºŠãªé»å管çã S è² è·ã»ã°ã¡ã³ããšåŒã°ããåå¥ã®ã¬ã»ãã¿ã¯ã«ã°ã«ãŒããéãã鿬¡ã·ã£ããããŠã³ããã³ è² è·å¶åŸ¡ã S ã«ã¹ã¿ããŒãµãŒãã¹ã«åãåãããªããŠããç°¡åã«ã¢ããã°ã¬ãŒããã§ãããã¡ãŒã ãŠã§ã¢ã S äžçäžã®ä»£çåºã®æ¿èªã«ããæ¯æã S ENERGY STAR® èªèšŒUPSã ã·ã¹ãã ã®ç¹åŸŽ | 215 æ å ±æ€çŽ¢ 泚æïŒ å®å šã»ç°å¢ã»èŠå¶ã«é¢ããæ å ±è³æã«ã¯ãå®å šããã³èŠå®ã«é¢ããéèŠæ å ±ãå«ãŸããŠããŸãã ã©ããªæ å ±ããæ¢ãã§ãã? S UPSãŠãŒã¶ãŒã¬ã€ã ãã¡ãã§ã芧ããã ããŸã Dell UPS ãã£ã¹ã¯ S Dell Network Management Cardçšã®ãŠãŒã¶ãŒã¬ã€ã S Dell MUMC and Dell ULNM ãŠãŒã¶ãŒã¬ã€ã æ³šèš è³æããœãããŠã§ã¢ã¢ããããŒã㯠www.support.dell.com ããã³ www.dellups.comã§å ¥æã§ããŸãã S 仿§ Dell UPS ãŠãŒã¶ãŒã¬ã€ã S UPSã®èšå®æ¹æ³ ãŠãŒã¶0ã¬ã€ãã¯Dell UPSãã£ã¹ã¯ããã³www.support.dell.comã§å ¥æãã ããšãã§ããŸãã S ãã©ãã«ã·ã¥ãŒãã£ã³ã°ã®æ¹æ³ããã³åé¡ã®è§£ æ±ºæ¹æ³ S REPOå¶åŸ¡ã®ã€ã³ã¹ããŒã«æ¹æ³ S å®å šã«ã䜿çšããã ãããã« å®å šã»ç°å¢ã»èŠå¶ã«é¢ããæ å ± S èŠåã«é¢ããæ å ± S ãªãµã€ã¯ã«ã«é¢ããæ å ± S ä¿èšŒã«é¢ããæ å ± Dell ä¿èšŒããã³ãµããŒãæ å ± S 䜿çšäžã®æ¡ä»¶ïŒã¢ã¡ãªã«ã®ã¿ïŒ S ãšã³ããŠãŒã¶ãŒäœ¿çšèš±è«Ÿå¥çŽ S ãµããŒãæ å ± Dell ãµããŒããŠã§ããµã€ã?www.sup port.dell.com 泚èš: 䜿çšããå°åãäºæ¥åºåãéžæãã é©åãªãµããŒããµã€ããã芧ãã ããã 216 | æ å ±æ€çŽ¢ ã€ã³ã¹ããŒã«ããã³èµ·å 泚æïŒ åœè³æã®æé ã宿œããåã«ãå®å šã»ç°å¢ã»èŠå¶ã«é¢ããæ å ±è³æã«èšèŒãã ãŠããå®å šã«é¢ããèª¬ææžããã³éèŠãªèŠå¶æ å ±ãã芧ããã ãããããã®æ å ±ã«åŸã£ãŠ ãã ããã æ³šæïŒ äœæž©ç°å¢ã§ãã£ããããã鿢±ãããšããã£ããããå ãŸãã¯ãã£ããã ãäžã«çµé²ãçããå¯èœæ§ããããŸãã ãã£ããããã¯ãå éšããã³å€éšãå®å šã«ä¹Ÿç¥ãããŸã§ã åãä»ããªãããã«ããŠãã ããïŒæé»ã®å±éºæ§ããããŸãïŒã 泚æïŒ ããããªãŒãã¬ã€ã®èšçœ®ãŸãã¯åãå€ãã¯ãããããªãŒãå¿ èŠãšããã å®å šäžã®æ³šæã«é¢ããŠç¥èã®ããã¹ã¿ãããè¡ãããç¥èã®ããã¹ã¿ãããç£èŠããå¿ èŠããã㟠ãã æ¿èªãåããŠããªãã¹ã¿ãããããããªãŒã«è¿å¯ãããªãããã«ããŠãã ããã ã€ã³ã¹ããŒã«ããã³èµ·å | 217 泚æïŒ ãã£ããããã«ã¯ããªãã®ééããããŸãïŒ99 kg/218 lbïŒã ãã£ãããããæã¡äžããåã«ãå¿ ãäž¡æ¹ã®ããããªãã¬ãŒãUPSããåãåºããŠãã ããã ãã£ãããããã©ãã¯ã«ç§»åããã«ã¯æäœ2åå¿ èŠã§ãã æ³šæïŒ ããããªãŒã«ã¯ããªãã®ééããããŸãïŒ32 kg/71 lbïŒã ããããªãŒãåãå€ãéã¯é©åãªæã¡äžãæ¹æ³ã䜿ã£ãŠãã ããã æ³šèšïŒ ç®±ã®ç§»åã鿢±ã®éã¯ã泚æãæã£ãŠãã ããã èšçœ®ã®æºåãå®äºãããŸã§ãéšåã¯æ¢±å ããåãåºããã«ãã®ãŸãŸã«ããŠãããŸãã ãã®ã»ã¯ã·ã§ã³ã§ã¯ãåããŠã·ã¹ãã ãèšå®ããæ¹æ³ã«ã€ããŠèª¬æããŠããŸãã ãã£ããããã®é梱 ã·ã¹ãã ã®éæ¢±æ¹æ³ïŒ 1 ãã©ãŒã¯ãªããããã³ããªããã䜿ã£ãŠãUPSãèšçœ®ããã©ãã¯ã®è¿ãã«ééçšæ®µããŒã«ãš ãã¬ãããç§»åããŠãã ããã 2 å€ç®±ãåãå€ããŠãã ããã 218 | ã€ã³ã¹ããŒã«ããã³èµ·å 3 äžçªäžã®çºæ³¡ã¹ãããŒã«éšåã®æºã«çµã¿èŸŒãŸãã2ã€ã®ä»å±ããã¯ã¹ãåãå€ã㊠ãã ããã 4 ä»å±ããã¯ã¹ãéããŠãè¿ãã«ããå¹³ãã§å®å®ãã衚é¢ã®äžã«çœ®ããŸãã æ³šèšïŒ Dell ãªã³ã©ã€ã³åŒã©ãã¯åUPS 10 kW ãŠãŒã¶ãŒã¬ã€ã ã§é梱ãšèšçœ®ã®æé ã瀺ããŸãã åç §ããã«ã¯ãä»å±ããã¯ã¹ãèã«çœ®ãåã«ä»å±ããã¯ã¹ããåºããŠãã ããã 5 äžéšã®çºç ²ã¹ãããŒã«éšåãåãå€ããŠãè¿ãã®å¹³ãã§å®å®ãã衚é¢äžã«çœ®ããŸãã ã€ã³ã¹ããŒã«ããã³èµ·å | 219 泚èšïŒ ããããªãŒä¿æãã©ã±ããã¯L (å·Š)ãšR (å³)ãšã©ãã«ãããèšçœ®ç®æã瀺ããŠããŸãã 6 äž¡æ¹ã®ããããªãŒä¿æãã©ã±ãããUPSããå€ããŠäžããã å·ŠïŒLãšã©ãã«ãããŠããŸãïŒä¿æãã©ã±ããã®äœçœ®ã確èªããŠãã ããã ã·ã£ãŒã·ã®å·ŠåŽã®è¶ããžãåæèšåãã«åããŠå·Šã®ä¿æãã©ã±ãããå€ããŸãã ãã©ã±ãããã»ã³ã¿ãŒãã¹ãã®æ¹åã«æŒããŠã·ã£ãŒã·ããå€ããŠãã ããã ãã©ã±ããããèªåã®æ¹åã«éãããã©ã±ãããå·Šã«åŒã£åŒµã£ãŠåãå€ããŠãã ããã ãã©ã±ãããèã«çœ®ããŠãã ããã å³ïŒRãšã©ãã«ãããŠããŸãïŒä¿æãã©ã±ããã®äœçœ®ã確èªããŠãã ããã ã·ã£ãŒã·ã®å³åŽã®è¶ããžãåæèšåãã«åããŠå³ã®ä¿æãã©ã±ãããå€ããŸãã ãã©ã±ãããã»ã³ã¿ãŒãã¹ãã®æ¹åã«æŒããŠã·ã£ãŒã·ããå€ããŠãã ããã ãã©ã±ããããèªåã®æ¹åã«éãããã©ã±ãããå³ã«åŒã£åŒµã£ãŠåãå€ããŠãã ããã ãã©ã±ãããèã«çœ®ããŠãã ããã 7 å šãŠã®ããããªãŒã³ãã¯ã¿ãæ¥ç¶ãããŠããªãããšã確èªããŠãã ããã 220 | ã€ã³ã¹ããŒã«ããã³èµ·å 泚æïŒ ããããªãŒã«ã¯ããªãã®ééããããŸãïŒ32 kg/71 lbïŒã ããããªãŒãåãå€ãéã¯é©åãªæã¡äžãæ¹æ³ã䜿ã£ãŠãã ããã 8 UPSããããããªãŒãã¬ã€ãåãå€ããŸãïŒ å€ããUPSããããªãŒã³ãã¯ã¿ãŒããéªéã«ãªããªãããã«ãããããªãŒã³ã³ããŒãã¡ã³ã ã®äžã«ç§»åãããŸãã ããããªãŒãã¬ã€ã®åã«ãã2ã€ã®ãã©ã¹ããã¯è£œã«ãŒãã¿ããæ¡ããŸãã ãã¬ã€ããèªåã®æ¹åã«åŒã£åŒµã£ãŠåãå€ããŠãã ãã æ³šèšïŒ ã«ãŒãã¿ãã®ã©ããæ¡ããã¯ãPULL HERE ãšæžããããªã¬ã³ãžè²ã®ã©ãã«ã§è¡šç€ºãããŠããŸãã UPSã®äžéšããåãå€ããçºæ³¡ã¹ãããŒã«éšåã®äžã«ããããªãŒãã¬ã€ã眮ããŠãã ããã 2ã€ç®ã®ããããªãŒãã¬ã€ã§ãåãæé ãç¹°ãè¿ããŸãã ã€ã³ã¹ããŒã«ããã³èµ·å | 221 泚æïŒ ããããªãŒãåãå€ããç¶æ ã§ããã£ããããã¯ããªãã®éãããããŸã (46 kg/101 lb)ã ãã£ããããã茞éçšæ®µããŒã«ããç§»åããã«ã¯æäœ2åå¿ èŠã§ãã 9 çåŽãäžäººãã€ã§æã¡ã段ããŒã«ã®ãã³ãã«éšåã䜿ã£ãŠãçºæ³¡ã¹ãããŒã«ãããã£ããã ããæ³šæããŠæã¡äžããŸãã 10 ãã£ããããããèšçœ®ããã©ãã¯ã®è¿ãã®å¹³ãã§å®å®ããä¿è·ãããå Žæã«çœ®ããŠãã ãã ã æ³šèšïŒ ãã®å Žæãæ¹¿åºŠãå¯çæ§ã¬ã¹ããªããè é£ã®ãããããªãã 颚éãã®ããä¿è·ãããå Žæã§ããããšã確èªããŠãã ããã 222 | ã€ã³ã¹ããŒã«ããã³èµ·å ã©ãã¯ããŠã³ãåŒèšçœ®æ¹æ³ 泚æïŒ ãã£ããããã«ã¯ããªãã®ééããããŸãïŒ99 kg/218 lbïŒã ãã£ãããããæã¡äžããŠã©ãã¯ã®ã¬ãŒã«ã«UPSãèšçœ®ããåã«ãå¿ ãUPSããäž¡æ¹ã®ããããªã㬠ã€ãåãå€ããŠãã ããã ãã£ãããããã©ãã¯ã«ç§»åããã«ã¯æäœ2åå¿ èŠã§ãã æ³šæïŒ ããããªãŒã®èšçœ®ãŸãã¯åãå€ãã¯ãããããªãŒããã³å¿ èŠãªå®å šäž ã®æ³šæã«è©³ããã¹ã¿ãããè¡ããã詳ããã¹ã¿ãããç£èŠããå¿ èŠããããŸãã æ¿èªãåããŠããªãã¹ã¿ãããããããªãŒã«è¿å¯ãããªãããã«ããŠãã ããã æ³šæïŒ ããããªãŒã«ã¯ããªãã®ééããããŸãïŒ32 kg/71 lbïŒã ããããªãŒãåãå€ãéã¯é©åãªæã¡äžãæ¹æ³ã䜿ã£ãŠãã ããã æ³šæïŒ ãªãã·ã§ã³ã®EBMãèšçœ®ããå Žåãå¿ ãEBM ãUPSã®äžã«çœ®ããUPSãšEBMã®éã«Uã¹ããŒã¹ ãã§ããªãããã«ããŠãã ãããããã«ãã£ãŠãã©ãã¯ã«ããè¯ãééé åã UPSã³ã³ãããŒã«ããã«ãžã®ããç°¡åãªã¢ã¯ã»ã¹ãããç°¡åãªããããªãŒã±ãŒãã«æ¥ç¶ãžã®ã«ãŒã㣠ã³ã°ãå¯èœã«ãªããŸãã ããããããšã«ãã£ãŠãUPSã«æ¥ç¶ããEBM ã³ãŒãã®çªã£åŒµãããããã®çºçããªãããæ¥ç¶ãã¹ãé²ãããšã«ããªããŸãã èŠåïŒ ã©ãã¯ããŠã³ãåŒã·ã¹ãã è€æ°ã®ã·ã¹ãã ãã©ãã¯ã«èšçœ®ããéã¯ã ãŸãã²ãšã€ã®ã·ã¹ãã ã®åãä»ãäœæ¥ãå šãŠçµããŠãããæ¬¡ã®ã·ã¹ãã ã®èšçœ®ã«é²ã¿ãŸãã æ³šèšïŒ åãä»ãã¬ãŒã«ã¯ãåãã£ããããã«å¿ èŠãšãªããŸãã æ³šèšïŒ ãã£ããããã«ã¯ããã³ãã«ããŒãåãä»ããããã«åºè·ãããŸãã æ³šèšïŒ åè§åã®ç©Žããããžç¡ã穎ãäžžå穎ã®ã©ãã¯ã¯ããã¹ãŠåã以äžã®æé ã§ãã ã¬ãŒã«ã¯äž¡æ¹ã®ã©ãã¯ã¹ã¿ã€ã«ã«é©åããŸãã UPSãã©ãã¯ã«åãä»ããæ¹æ³ïŒ 1 以äžã®ãã®ããUPSãèšçœ®ããã©ãã¯ã®è¿ãã®å¹³ãã§å®å®ãã衚é¢äžã«çœ®ãããŠããããšã 確èªããŠãã ããïŒ S ãã£ãããã S UPSä»å±ããã¯ã¹2〠S ããããªãŒãã¬ã€ïŒã€ïŒUPSã®ã¿ïŒ S ããããªãŒä¿æãã©ã±ããïŒã€ïŒUPSã®ã¿ïŒ ã€ã³ã¹ããŒã«ããã³èµ·å | 223 ã¬ãŒã«ã®åãä»ãæ¹æ³ 2 ã¬ãŒã«ãããä»å±ããã¯ã¹ããã¬ãŒã«ãåãå€ããŠãã ããã 3 ã¬ãŒã«äžã®é©åãªç©Žãéžã³ãã©ãã¯äžã®åžæããäœçœ®ã«ãã£ãããããé 眮ããŸãã UPSã«å²ãåœãŠããã5Uã®ã¹ããŒã¹ã®åºé¢ã«ã¬ãŒã«ãé 眮ããŸãã æ³šæïŒ ãªãã·ã§ã³ã®EBMãã€ã³ã¹ããŒã«ããå ŽåãEBM ãšUPSã®éã«Uã¹ããŒã¹ãã§ããªãããã«ãEBMãã€ã³ã¹ããŒã«ããã¹ããŒã¹ã確ä¿ããŸãã æ³šèšïŒ ã¬ãŒã«ã®ã©ãã«ã®ãå³åïŒRIGHT FRONTãšã©ãã«ãããŠããŸãïŒãšå·ŠåïŒLEFT FRONTãšã©ãã«ãããŠããŸãïŒã確èªããŠãã ããã ããã¯ãã¬ãŒã«ãæ£ããäœçœ®ã«ã€ã³ã¹ããŒã«ããããã®ãã®ã§ãã 4 å³ã®ããã«å·Šãšå³ã®ã¬ãŒã«ãé 眮ããŠãã ããã å·Šãšå³ã®ã¬ãŒã«ãã©ãã¯ã«åãä»ããŠãã ããïŒ åçŽã®ã©ãã¯ãã©ã³ãžã«å®å šã«ã¯ãŸããããã¯ã©ãããæå®äœçœ®ã«åºå®ãããŸã§ãã¬ãŒã«ã® åŸç«¯éšãã¯ã蟌ã¿ãŸãã ã©ãã¯ã®åæ¹ãè¶ããããã¬ãŒã«ãåŒã£åŒµããŸãã åçŽã®ã©ãã¯ãã©ã³ãžã«å®å šã«åãŸããããã¯ã©ãããæå®äœçœ®ã«åºå®ãããŸã§ãã¬ãŒã«ã® å端éšãã¯ã蟌ã¿ãŸãã 224 | ã€ã³ã¹ããŒã«ããã³èµ·å ãã£ããããã®åãä»ãããã³åºå® 泚æïŒ ããããªãŒãåãå€ããç¶æ ã§ããã£ããããã¯ããªãã®éãããããŸã (46 kg/101 lb)ã ãã£ãããããã©ãã¯ã«ç§»åããã«ã¯æäœ2åå¿ èŠã§ãã 5 ãã£ãããããã¬ãŒã«äžãã¹ã©ã€ãããã©ãã¯ã«å ¥ããŸãã 6 ïŒã€ã®è¶ããžã䜿ã£ãŠããã£ããããã®åæ¹ãããŠã³ãã£ã³ã°ãã©ã±ããã«åºå®ããŸãã æã§ãã§ãŠããžãæèšåãã«åŒ·ãç· ããŠãã ãããé»åå·¥å ·ã¯äœ¿çšããªãã§ãã ããã ããããªãŒãã¬ã€ã®åãä»ãæ¹æ³ 7 ã©ãã¯ã®è¿ãã«çœ®ããããããªãŒãã¬ã€ã®äœçœ®ã確èªããŠãã ããã ã€ã³ã¹ããŒã«ããã³èµ·å | 225 泚æïŒ ããããªãŒã«ã¯ããªãã®ééããããŸãïŒ32 kg/71 lbïŒã ããããªãŒãèšçœ®ããéã¯é©åãªæã¡äžãæ¹æ³ã䜿ã£ãŠãã ããã æ³šèšïŒ ããããªãŒãã¬ã€ã¯ã©ã¡ãã®ããããªãŒã³ã³ããŒãã¡ã³ãã«ãèšçœ®ã§ããŸãã æ³šèšïŒ èŠå衚瀺ã®ç¢å°ãäžãåããŠãç¶æ ã§ãã¬ã€ãæ¿å ¥ããŠãã ããã 8 ããããªãŒãã¬ã€ã®åãä»ãæ¹æ³ UPSããããªãŒã³ãã¯ã¿ãŒããéªéã«ãªããªãããã«ãããããªãŒã³ã³ããŒãã¡ã³ ãã®äžã«ç§»åãããŸãã ããããªãŒãã¬ã€ãããããªãŒã³ã³ããŒãã¡ã³ãã®äžã«å®å šã«çŽãŸããŸã§ã¹ã©ã€ ããããŸãã 2ã€ç®ã®ããããªãŒãã¬ã€ã®èšçœ®ã«ãåãæé ãç¹°ãè¿ããŸãã 9 ããããã®ããããªãŒãã¬ã€ã®åã®ãã©ã¹ããã¯ã®ã¹ãªãŒã管ã«ã«ãŒãã¿ããå·®ã蟌ã¿ãéª éã«ãªããªãããã«ããŸãã å èããããªãŒã³ãã¯ã¿ã®æ¥ç¶æ¹æ³ 10 å èããããªãŒã³ãã¯ã¿ãæ¥ç¶ããŸãã ããããªãã¬ã€å·Šç«¯ã®ã³ãã¯ã¿ãšåºå®ãããUPSã®ã³ãã¯ã¿ãšãæ¥ç¶ããŸãã ããããªãã¬ã€å³ç«¯ã®ã³ãã¯ã¿ãšåºå®ãããUPSã®ã³ãã¯ã¿ãšãæ¥ç¶ããŸãã æ³šèšïŒ 黿± ãæ¥ç¶ããéã«ãå°éã®ã¢ãŒã¯æŸé»ãèµ·ããããšããããŸãã ããã¯æ£åžžã§ãããè£ çœ®ã«æå·ãäžããããå®å šã«ããããå¿é ã¯ãããŸããã ã»ã³ã¿ãŒãã¹ãã®äž¡åŽã«ããããããªãŒãžã£ã³ããŒã®äœçœ®ã確èªããŠæ¥ç¶ããŸãã ã»ã³ã¿ãŒãã¹ãäžéšã®å°ããªã·ã§ã«ãã«ã³ãã¯ã¿ã眮ããŸãã 226 | ã€ã³ã¹ããŒã«ããã³èµ·å 泚èšïŒ äžå€®ããããªãŒãžã£ã³ããŒãæ¥ç¶ããããšã§ã2ã€ã®ããããªãŒãã¬ã€ãé£çµããŸãã ããããªãŒä¿æãã©ã±ããã®äº€ææ¹æ³ ã·ã£ãŒã·åŽæº ã»ã³ãã©ã«ãã¹ãã®åŽæº 泚èšïŒ ããããªãŒä¿æãã©ã±ããã¯L (å·Š)ãšR (å³)ãšã©ãã«ãããèšçœ®ç®æã瀺ããŠããŸãã 11 å·ŠïŒLïŒãšå³ïŒRïŒã®ããããªãŒä¿æãã©ã±ãããåãæ¿ããŸãïŒ äžã€ç®ã®ããããªä¿æãã©ã±ããã®ãã©ã±ããã¿ããã»ã³ã¿ãŒãã¹ãã®åŽæºã«æ¿å ¥ããŸãã æ¥ç¶ãããŠããããããªãŒã±ãŒãã«ãä¿æãã©ã±ããã®åŸãã«ãŽã£ãããšã¯ããŠãã ããã ããããªãŒä¿æãã©ã±ããã®ç«¯ãã·ã£ãŒã·ã®åŽæºã«åãããŸãã åŽæºã«ãã£ãããšçŽãŸããŸã§ãã©ã±ãããæŒã蟌ã¿ãŸãã ãã§ãŠããžãæèšåãã«åããŠãã©ã±ãããåºå®ããŠãã ããã æé ãç¹°ãè¿ããŠ2ã€ç®ã®ããããªãŒä¿æãã©ã±ãããåãæ¿ããŸãã ã€ã³ã¹ããŒã«ããã³èµ·å | 227 UPSã®ããã³ãã«ããŒã®åãä»ãæ¹æ³ 12 ä»å±ããã¯ã¹ããããã³ãã«ããŒãåãå€ããŸãã æ³šèšïŒ UPSãèšçœ®ãããŸã§ããœãããŠã§ã¢CDãéä¿¡ã±ãŒãã«ã ããã³ïŒå¿ èŠã§ããã°ïŒREPOã³ãã¯ã¿ãä»å±ããã¯ã¹ã«ä¿ç®¡ããŠãã ããã 1 2 13 UPSããã³ãã«ããŒãåãä»ããŸãã ããã³ãã«ããŒãã·ã£ãŒã·ã®åã«æããŠãã ããã ããã³ãã«ããŒã®å³åŽã¿ãããå³åŽã·ã£ãŒã·ã«èšããããŠããã¿ãçšã®ç©Žã«æ¿å ¥ããŸãã ã«ããŒã®å·ŠåŽãåæ¹åã«æŒããŠã·ã£ãŒã·ã«ã¯ããŠãã ããã 228 | ã€ã³ã¹ããŒã«ããã³èµ·å 泚èšïŒ ã«ããŒãã·ã£ãŒã·ã«åºå®ããåã«ãUPSã·ã£ãŒã·ã®LCDããã«ãšã ãã³ãã«ããŒã®LCDãŠã£ã³ããŠãæŽåãããŠããããšã確èªããŠãã ããã 14 梱å çšã®ç®±ã¯ã責任ãæã£ãŠåŠåãŸãã¯ãªãµã€ã¯ã«ããããä»åŸã®äœ¿çšã®ãã ã«ä¿ç®¡ããŸãã è£ çœ®ã®æ¥ç¶æ¹æ³ UPSã®åãä»ãæ¹æ³ïŒ 1 Dell MUMC and Dell ULNMãœãããŠã§ã¢ã䜿çšããå Žåã 以äžã®ããããã®æ¹æ³ã§éä¿¡ã確ç«ããŠãã ããïŒ S Dell Network Management Cardã䜿çšããïŒèšçœ®ãããŠããå ŽåïŒ S æäŸãããã±ãŒãã«ã§ã³ã³ãã¥ãŒã¿ãŒãUSBããŒãã«æ¥ç¶ãã æ³šèšïŒ éä¿¡ãªãã·ã§ã³ã«é¢ãã詳现ã¯ãDell ãªã³ã©ã€ã³åŒã©ãã¯åUPS 10 kW ãŠãŒã¶ãŒã¬ã€ãããŒãžããåç §ãã ããã 2 ã䜿ãã®ã©ãã¯ã«ãæ¥å°çšããããã¯éæ¥å°éå±éšåã®æ¥åçšã®å°äœãå«ãŸããå Žåã¯ãæ¥ å°ã±ãŒãã«ïŒå梱ãããŠããŸããïŒãæ¥å°æ¥åããžã«æ¥ç¶ããŸãã ïŒã€ã®ã¢ãã«ã®åã ã®ã°ã©ãŠã³ããã³ãã£ã³ã°ããžã®äœçœ®ã«é¢ããŠã¯ã 236 ããŒãžã®ãUPSåŸæ¹ããã«ãããåç §ãã ããã 3 å°åã®æ¡äŸã§ãéåžžåæ¢ïŒåæïŒã¹ã€ãããèŠæ±ãããŠããå Žåã¯ãDell ãªã³ã©ã€ã³åŒã©ãã¯åUPS 10 kW ãŠãŒã¶ãŒã¬ã€ãã§ ããªã¢ãŒããšããŒãžã§ã³ã·ãŒãã¯ãŒãªãã®èšå®æ¹æ³ããã芧ãã ããã 4 ãªãã·ã§ã³ã§EBMãåãä»ããå Žåã¯ãDell ãªã³ã©ã€ã³åŒã©ãã¯åEBM 10 kW ã¯ããã« ã䜿ãã®ã·ã¹ãã ã®åãä»ãèª¬ææžãã芧ãã ããã æ³šæïŒ UPSãEBMãªãã§ä¿ç®¡ããããã¯äœ¿çšããå Žåã UPSã®ãªã¢ããã«ã«ããããããªãŒã³ãã¯ã¿ã«ããŒã¯ãå®å šæ³šæäºé ã«åŸãåãä»ããªããã°ãã㟠ããã 5 ä¿è·ããè£ çœ®ãUPSåºåã¬ã»ãã¿ã¯ã«ã«å·®ã蟌ã¿ãŸãããã ããä¿è·è£ 眮ã®é»æºã¯å ¥ããªã ã§ãã ããã 6 å¿ èŠã«å¿ããŠãã³ãŒããåŒããã匵åã®ç·©åãè¡ã£ãŠãã ããã æ³šèšïŒ éè² è·ã¢ã©ãŒã ãé²ããããè£ çœ®ã®å®æ Œã®åèšãUPSã®å®¹é ãè¶ ããŠããªãã確èªããŠãã ããã ã€ã³ã¹ããŒã«ããã³èµ·å | 229 UPSå ¥åé ç· èŠåïŒ æé»ã®å±éºã æè³æ Œã®ãµãŒãã¹ã¹ã¿ããïŒèªå®ããã黿°äž»ä»»æè¡è ãªã©ïŒ ã®ã¿ã黿°åšå ·ã®åãä»ããè¡ã£ãŠãã ããã Dell Racké ç·æ¥ç¶åã¯ã以äžã®æ¡ä»¶ãæºããå°çšåå²åè·¯ãå¿ èŠã§ãïŒ S ä¿è·è£ 眮ã«ã¯ãUPSå ¥åãšé»æºã®éã«2æ¥µã®æè·¯åšãå¿ èŠã§ãã S ãã¬ãŒã«ãŒã¯ã壿ãåŒã§ãããæäœå¡ã容æã«ã¢ã¯ã»ã¹ã§ããå Žæã«èšçœ®ãããªããã°ãª ããŸããã S ãšãŒãããåã ãã¬ãŒã«ãŒã¯ IEC/EN 60934 èŠæ Œã«åŸããæäœ 3 mm ã®æ¥è§Šãšã¢ã®ã£ãããæããå¿ èŠããããŸãã S 200â40 Vac S åçž S 50/60 Hz S æè»æ§ã®ããéå±è£œå°ç®¡ïŒç°¡äŸ¿ãªä¿®çããã³ä¿å®ã®ããã«æšèŠïŒ å£ 2極ã㬠ãŒã« ã©ã€ã³ ACäž»é»æº UPS äžæ§/L2 230 | ã€ã³ã¹ããŒã«ããã³èµ·å 端åãããã¯ã«ããŒã®åãå€ã äžæ§/L2 端åãããã¯ã« ã㌠1 UPSãæ¥ç¶ãããäŸçµŠå°ç¹ã®ãŠãŒãã£ãªãã£é»æºããªãã«ããŸãã é»åãå®å šã«äŸçµŠãããŠããªãããšã確èªããŸãã 2 端åãããã¯ã«ã㌠ïŒ2æ¬ã®ããžïŒ ãåãå€ããŠä¿æããŸãã 3 å ¥åå°ç®¡çšã«ç«¯åãããã¯ã«ããŒã®ããã¯ã¢ãŠã穎ãéããŸãã ãã®ç©Žã¯ã1â ãŸã㯠1.5âïŒ25.4 mm ãŸã㯠38.1 mmïŒäžéé»ç·ç®¡ïŒIMCïŒãå容ããå¿ èŠããããŸãã ã€ã³ã¹ããŒã«ããã³èµ·å | 231 泚æïŒ UPSã«é»æµè² åž°éã«å¯Ÿããèªåä¿è·è£ 眮ããªãå Žåã å€ä»ãã®çµ¶çžè£ 眮ãåãä»ããããšãæšå¥šããŸãã è£ çœ®ãåãä»ããåŸã 以äžã®æ³šæäºé ãèšèŒãããèŠåã©ãã«çããå€ä»ãã®ACã³ã³ã¿ã¯ã¿ã«è²Œãä»ããªããã°ãªããŸã ãïŒ é»å§ è² åž°éã® æãããããŸãã ãã®åè·¯ã§æäœããåã«ãUPSãçµ¶çžãã ãã¹ãŠã®ç«¯åéã«ãããå±éºãªé»å§ã確èªããŠãã ããã å€ä»ãäŸçµŠããã« UPS å¡äŸ Q T L/L1 L/L1 N/L2 N/L2 B Q T N/L2 L/L1 ã³ã€ã«ãªã¢ãŒãã¹ã€ãã ç£æ°ç±å ¥å ã¡ã€ã³ã¹ã€ãã ACã³ã³ã¿ã¯ã¿ äžæ§/L2 L1ã©ã€ã³å ¥å B 以äžã®ãªã¹ãã¯ãè² åž°éãé²ãããã®å€ä»ãã®çµ¶çžè£ 眮ãšããŠå©çšå¯èœãªè² åž°éä¿è·è£ 眮 (ACã³ã³ã¿ã¯ã¿ïŒãäžèŠ§è¡šç€ºããŠããŸãã ãã®ãªã¹ãã«è¡šç€ºãããACã³ã³ã¿ã¯ã¿ä»¥å€ã¯äœ¿çšã§ããŸããã 補é äŒç€Ÿ çš®é¡ å®æ Œ A75-30 220?40 Vac, 105A 208Vã§25HPã 240Vã§30HP Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (代æ¿) GSC1(CJX4-d)-6511 220?40 Vac, 68A 25 HP Tianshui 213 Electrical Apparatus Co., Ltd. (E203071) (代æ¿) GSC1(CJX4-d)-8011 220?40 Vac, 80A 30 HP ABB ãã©ã³ã¹ (E12527) 泚èšïŒ UPSã«ã¯æè² åž°é(ABF)ç¶é»åšã¯å«ãŸããŸãããã ããçšåºŠã®è² åž°éä¿è·ã¯æäŸãããŠããŸãã äŸãã°ãããã€ãã®ã³ã³ããŒãã³ããããããªãŒã¢ãŒ ãã§æå·ãåããå Žåãåºåé»å§ãå ¥åã«ãã£ãŒãããã¯ããå¯èœæ§ããããŸãã ãã®å Žåããã€ãã¹é»æµãã£ãŒãããã¯é»å§ã®æ€åºã«å€æµåšïŒCTïŒãçšããããŸãã 黿µè² è² åž°ééå®³ç¶æ ãæ€åºãããå Žåãæªæã鲿¢ããããã«UPSãã€ã³ããŒã¿åºåãçµäºã 㟠ãã 232 | ã€ã³ã¹ããŒã«ããã³èµ·å å ¥åã¯ã€ã€ãŒããã³æ¥å°ã¯ã€ã€ãŒã®åãä»ã 1 2 3 4 å ¥åã¯ã€ã€ãå°ç®¡ããåŒãåºããçŽ2 ft (0.5m) ã®ã¯ã€ã€ãããåºãã«ããŠãããŸãã å°ç®¡ã®æ«ç«¯ã«ãã¬ãã·ãã«æ¥ç¶éå ·ãåãä»ããŸãã 5 é ç·ã¢ã¯ã»ã¹å ¥ãå£ãéããŠå°ç®¡ãæ¿å ¥ããå°ç®¡æ¥ç¶éå ·ãããã«ã«åãä»ããŸãã åå ¥æ¥ã¯ã€ã€ãŒã®æ«ç«¯ãã0.5â (1.5 cm) ã®çµ¶çžè¢«èãåãå»ããŸãã 6 以äžã®è¡šã«ç€ºããUPSé ç·ä»æ§ã«åŸã£ãŠãå ¥åç·ããã³ã¢ãŒã¹ç·ã端åãããã¯ã«åãä»ã ãŠãã ããã ã¯ã€ã€ãŒã®æ©èœ å ¥å 端åäœçœ® UPSã¯ã€ã€ãŒã®æ©èœ 1 å ¥åæ¥å° 2 L2ïŒäžæ§ç¹å ¥å 3 L1å ¥å 端åã¯ã€ã€ãŒãµã€ãº 宿 Œ* ç· ãä»ããã«ã¯ 16?5 mm2 (8? AWG) 1.7 Nm (15 lb-in) * æå°ã䜿çšïŒ S 8 è£ çœ®æ¥å°ç·çšAWGã75_C é ç·æå° S 4 å ¥åç·ããã³äžæ§ç·çšAWGã75_C é ç·æå° 7 端åãããã¯ã«ããŒãå ã«æ»ããŸãã ã€ã³ã¹ããŒã«ããã³èµ·å | 233 UPSã®èµ·åæ¹æ³ ãªã³/ãªããã¿ã³ UPSã®èµ·åæ¹æ³ïŒ 1 å èµããããªãŒãæ¥ç¶ãããŠããããšãã確èªãã ããã 2 ãªãã·ã§ã³ã®EBMãã€ã³ã¹ããŒã«ãããŠããå ŽåãEBMãUPSã«æ¥ç¶ãããŠããããšããç¢ºèª ãã ããã 詳现ã«ã€ããŠã¯ãDell ãªã³ã©ã€ã³åŒã©ãã¯åEBM 10 kW ã¯ããã« ã䜿ãã®ã·ã¹ãã ããåç §ãã ããã 3 ãã¹ãŠã®è² è·ã»ã°ã¡ã³ããµãŒããããã¬ãŒã«ããªã³äœçœ®ã«ããããšãæ€èšŒããŸãã 4 ã¡ã€ã³ã®é»åãã¬ãŒã«ãŒã®ã¹ã€ãããå ¥ããŸãã UPSã®LCDããã«ã®ãã£ã¹ãã¬ã€ãæãããªããŸãã Dell ã®èµ·åç»é¢ãUPSã¹ããŒã¿ã¹èŠçŽç»é¢ã«å€ãããŸãã UPSã®åæ¹ããã«ã®ãã£ã¹ãã¬ãŒã¯ãç¹æ» ã®ã¹ã¿ã³ãã€ã¢ã€ã³ã³ ã瀺ããŠããŸãã 5 UPSã®åæ¹ããã«ã«ãããªã³/ãªã ãã¿ã³ãæŒããŸãã å®å šã«èµ·åãããšãUPSåäœã¢ãŒãã«åŸã£ãŠã¹ããŒã¿ã¹ãå€ãããŸãã 234 | ã€ã³ã¹ããŒã«ããã³èµ·å 6 ã¢ã¯ãã£ãã«ãªã£ãŠããèŠåãéç¥ã確ãããã«ã¯ãUPSã¹ããŒã¿ã¹èŠçŽç»é¢ã® ãã¿ã³ãæŒããŸãã ç¶ããåã«ãäœåäžã®èŠåã解決ããŠãã ããã Dell ãªã³ã©ã€ã³åŒã©ãã¯åUPS 10 kW ãŠãŒã¶ãŒã¬ã€ã ã®ããã©ãã«ã·ã¥ãŒãã£ã³ã°ããã芧ãã ããã äœåäžã®èŠåããªãå Žåã¯ããäœåäžã®èŠåãªãããšããã¡ãã»ãŒãžã衚瀺ãããŸãã 7 UPSãæ£åžžã«äœåããè² è·é»åãããããšã瀺ããæ£åžžãã¢ã€ã³ã³ ããUPSã®ã¹ããŒã¿ã¹èŠçŽç»é¢ã«çŸããŠããããšãã確ãããã ããã 8 以äžã®è©³çްã¯ãDell ãªã³ã©ã€ã³åŒã©ãã¯åUPS 10 kW ãŠãŒã¶ãŒã¬ã€ããåç §ããŠãã ããã S æ¡åŒµããããªã¢ãžã¥ãŒã« (EBM) ããªãã·ã§ã³ãšããŠã€ã³ã¹ããŒã«ãããŠããå Žåã®èšå®æé S æ¥ä»ãšæéã®èšå®ããã³ãã®ä»ã®å·¥å Žåºè·æèšå®ã®å€æŽ 9 ãªãã·ã§ã³ã®REPOãåãä»ããããŠããå Žåã¯ãREPOæ©èœãã¹ããè¡ã£ãŠãã ããïŒ REPOã®å€éšã¹ã€ãããæå¹ã«ããŸãã UPSã®ãã£ã¹ãã¬ã€ã®ã¹ããŒã¿ã¹ãå€ãã£ãããšãã確èªãã ããã REPOã®å€éšã¹ã€ãããç¡å¹ã«ããUPSãåèµ·åããŸãã 10 ããããªãŒãå é»ããŠãã ããã æ³šèšïŒ å èµããããªãŒã¯ã3æé以å ã§90%ã®å®¹éãŸã§å é»ãããŸãã ãã ããåãä»ãåŸããããã¯é·æäœ¿çšããªãã£ãåŸã¯ã48æéãããããªãŒãå é»ããå¿ èŠãã ããŸãã æ³šæïŒ UPSãéè² è·ç¶æ ã«ãªããªãããã«ãè² è·ã¯ïŒã€ãã€æ¥ç¶ãã ã²ãšã€ã®ä¿è·è£ 眮ãå®å šã«èµ·åãçµãããŸã§æ¬¡ã®è² è·ã¯æ¥ç¶ãããªãã§ãã ããã ã€ã³ã¹ããŒã«ããã³èµ·å | 235 泚èšïŒ Dell ã§ã¯ããã©ãã«ã·ã¥ãŒãã£ã³ã°ãä¿èšŒã®ããã«ãã æ¥ä»ããã³æéã®èšå®ãæšå¥šããŸãã æ³šèšïŒ åèµ·åã§ã¯ãUPSã¯ãå ¥åã©ã€ã³åšæ³¢æ°ïŒå ¥ååšæ³¢æ°èªåæ€åºã¯åæèšå® ã§ã¯æå¹ã«ãªã£ãŠããŸãïŒã«åŸããã·ã¹ãã åšæ³¢æ°ãèšå®ããŸãã åèµ·ååŸã¯ãåºååšæ³¢æ°èšå®ã«ãã£ãŠæåã§åã³æå¹ã«ãããŸã§ãèªåæ€åºã¯ç¡å¹ãšãªããŸãã æ³šèšïŒ åããŠã®èµ·åæãå ¥åèªåæ€åºã¯åæèšå®ãšããŠã«ãªã£ãŠããŸãã ãã以éã®èµ·ååŸã¯ãåºåé»å§èšå®ã«ãã£ãŠæåã§åã³æå¹ã«ãããŸã§ã èªåæ€åºã¯ç¡å¹ãšãªããŸãã UPSåŸæ¹ããã«ã®èå¥ ãã®ã»ã¯ã·ã§ã³ã§ã¯ã3çš®é¡ã®10 kW Dell RackUPSã¢ãã«ãªãã·ã§ã³ã®åŸæ¹ããã«ã衚瀺ããŠããŸãã 236 | ã€ã³ã¹ããŒã«ããã³èµ·å 10 kW 208V UPS (DELL10KWOLHVUS) UPS éä¿¡ã〠NEMA L6-30R ã¢ãŠãã¬ãã 1å åºåãµãŒãããã»ã ã¬ãŒã«ãŒ2å RS-232 USBã ããŒã ãŒã REPO EBMã³ã ããŒã ã¯ã¿ IEC 320-C19 NEMA L6-30R ã¢ãŠãã¬ãã2 ã¢ãŠãã¬ãã å 1å åºåãµãŒãããã»ã㬠ãŒã«ãŒ2å è² è·ã»ã°ã¡ã³ã1ïŒLS1ïŒ æ¥å°ããž IEC 320-C19 ã¢ãŠãã¬ãã2 å å ¥å端åããã ã¯ è² è·ã»ã°ã¡ã³ã2ïŒLS2ïŒ ã€ã³ã¹ããŒã«ããã³èµ·å | 237 10 kW 230V UPS (DELL10KWOLHV) UPS éä¿¡ã〠RS-232 USBã ããŒã ãŒã REPOã EBMã³ã ã¯ã¿ ãŒã åºåãµãŒã IEC 320-C19 IEC 60309 åºåãµãŒããã ããã»ã㬠ã¬ã»ãã¿ã¯ã« 332R6Sã¬ã»ãã¿ ã»ãã¬ãŒã«1å ãŒã«ãŒ2å 2å ã¯ã«1å è² è·ã»ã°ã¡ã³ã1ïŒLS1ïŒ 238 | ã€ã³ã¹ããŒã«ããã³èµ·å IEC 60309 332R6Sã¬ã»ãã¿ ã¯ã«1å è² è·ã»ã°ã¡ã³ã2ïŒLS2ïŒ æ¥å°ããž å ¥å端åããã 㯠10 kW 230V UPS (DELL10KWOLHVB) UPS éä¿¡ã〠RS-232 USBã ããŒã ãŒã åºåãµãŒãããã»ã IEC 320-C19 ã¬ã»ãã¿ã¯ã«4å ã¬ãŒã«ãŒ2å è² è·ã»ã°ã¡ã³ã1ïŒLS1ïŒ REPOã EBMã³ã㯠ãŒã ã¿ åºåãµãŒããã ã»ãã¬ãŒã«ãŒ2å æ¥å°ããž IEC 320-C19 ã¬ã»ãã¿ã¯ã«4å å ¥å端åãããã¯ è² è·ã»ã°ã¡ã³ã2ïŒLS2ïŒ ã€ã³ã¹ããŒã«ããã³èµ·å | 239 240 | ã€ã³ã¹ããŒã«ããã³èµ·å *P-1640001872* P-164000187 2
This document in other languages
- français: Dell UPS 10000R
- español: Dell UPS 10000R
- Deutsch: Dell UPS 10000R
- ÑÑÑÑкОй: Dell UPS 10000R
- æ¥æ¬èª: Dell UPS 10000R