Download Miller Electric SCE-1A Specifications
Transcript
If the metallic building is not properly grounded, bonding to good electrical grounds placed around the periphery of the building will give reasonable assurance that the build 9. several ing itself is contributing not to the radiation. 10. 11. Any all CERTIFICATION INSTALLATION 7-9. INDIVIDUAL the above installation requirements may be user if he desires to exercise the option of making an individual field survey of the particular unit instal lation (or the complete installation if more than one unit is involved), and certifying on that basis. or by waived of tions Commission, Surveys units or of this nature may include the can cover a unit single complete plant or multiple equipment secondary? case connected to the work terminal Is the wire used for this connection of sufficient size? Is the work terminal connected to good electrical a ground? 12. the This survey shall be made by a competent engineer in accord ance with the test procedure requirements as set forth in Part 18 of the Rules and Regulations of the Federal Communica Is the of the Is the cable or equal the to copperbraid used for this connection current carrying capacity than greater in lead? or welding 13. Is this cable 14, Are the spark-gaps set at .008 access doors closed and bolted? as short possible? as or less? 15. Are all service and 16. Are the 17. Are 18. Are the welding suitable board? 19. Are the 20. Have you visualized the I-f.F.l. zone, a sphere with foot radious centered on the weld zone? 21. Have the unshielded power and light wires originally in this H.F.I. zone been placed in grounded shields or been relocated outside the zone? Have all large metallic objects and any lon9 guy supporting wires in the H.F.I. zone been grounded? welding they as leads less then 25 feet short as long? possible? structure. leads the on floor or placed on a - 7-10. CHECK LIST The following questions may be used by the installer as check to see if all installation requirements have been met: 1. Has the equipment been located be kept short? leads, serving the unit, in conduit? 2, Are the power 3. Is there good electrical contact between power duit and case? con 22, 4. Do the conduit couplin~ make good electrical tact? lIf in doubt, use bonding). con 23. Is there good electrical contact between conduit and switch on service boxes? 6, If approximately 3/4 so that no premises are 1 to apart? a 50 Are the grounds driven ground rods? 25. Is 26. If so, does it connection? 27. Are the connections 28. If operated within properly grounded? a cold water pipe used as or external power or tele within the zone? 24. ground? metallic conduit is not used, is the shielding equivalent shielding efficiency? (Copper sleev used of lead covered cable, etc-, is satisfactory. Spirally wound flexible metallic conduit is not suitable). ing, 8, Have you checked lines off the phone 5, 7. leads that ground leads so can rigid welding a Is the conduit system grounded at feet from the equipment? Is the conduit NFl. zone? run a point complete (without any at least gap) 50 in the enter the ground 10 feet to a or less from the the ground clean and metal building, If your answer is yes to the above questions, fy the installation by signing the certificate, tight? is the you building can certi OM-540 Page 9