Download Schwank S100 Owner`s manual

Transcript
FIGURE 11 ‘U’-TUBE TYPICAL HANGER & SUPPORT SPACING
SUSPEND FIRST TUBES BY TWO (2) HANGERS, THEN SUBSEQUENT SECTIONS BY ONE HANGER
LOCATE HANGERTS BETWEEN 6” to 18” FROM EACH TUBE COUPLER.
INSTALL FIRST AND SECOND TUBES (FROM BURNER END) WITH WELDED SEAM FACING DOWNWARD.
1 - END CAP
2 - WIRE HANGER
3 - BURNER ASSEMBLY
4 - COMBUSTION AIR OPTIONS:
4A - JS-0532-SE 4” INTAKE
ADAPTER
4B - JS-0532-VC 4” WALL CAP
4C - JA-0528-XX 4” ROOF CAP
5 - SIGHT GLASS
6 - ALUMINIZED TUBE WITH
FLANGE
7 - TORCTITE TUBE COUPLER
8 - STEEL TUBE(S)
9 - REFLECTOR
10 - FLUE VENT TERMINAL
11 - BURNER SUPPORT CHAIN
12 - HANGER SUPPORT
CHAINS
FIGURE 12 ‘U’ TUBE MODELS
‘U’ TUBE HANGER
FIGURE 12A
TURN BOX
FIGURE 12B
FIGURE 13 ‘U’ TUBE MODEL ORIENTATION
S100/ITB I&O Manual
IM101230
RD: JUN 2012
RL: 7A- BA
18