Download Eaton 60 kVA User`s guide

Transcript
UPS Maintenance
10. Verify that all UPSs are set to use the same power strategy (High Efficiency or Standard). You can change
the power strategy from the front panel. See User Settings in Table 12 on page 95.
Figure 86. Replacing the UPS Front Cover
Replacing a UPS in a Parallel System
You can replace a UPS in a parallel system without powering down the system or protected load.
Eaton BladeUPS 5.1 kVA to 60 kVA (N+1) User’s Guide 164201649—Rev 9 www.eaton.com/powerquality
127