Download Viessmann Vitodens 100 WB1A Specifications
Transcript
Montageablauf Installing the boiler and making all connections (Fortsetzung) Terminating into the rainwater system Terminating into an external purpose made soakaway A 722 mm plastic condensate pipe B Internal soil and vent stack A 722 mm plastic condensate pipe B External length of pipe 3 m max. C Open end direct into gully, below ground but above water level Filling the siphon with water Fill a minimum of 0.3 l of water into the boiler connect kit flue outlet. Achtung At initial start-up, flue gas may be emitted from the condensate drain. Fill the siphon with water before start-up. 5851 670 ! 38