Download Bard W24A1-B Specifications

Transcript
Manual 2100-508A
Page
9 of 25
1
E
5"
12"
12"
12"
12"
12"
D
1
42"
3"
4"
Typ.
1"
28"
3 "
4" 8
Typ.
Return Opening
Supply Opening
A
10
1
42"
C
Wall Opening and Hole Location View
7
8"
C
30
1"
14"
E
B
4 1/2 4 9/16 16 7/8
D
REQUIRED DIMENSIONS TO MAINTAIN
RECOMMENDED 1" CLEARANCE FROM
COMBUSTIBLE MATERIALS
C
5 1/4 3 13/16 17 5/8
B
REQUIRED DIMENSIONS TO MAINTAIN
28 1/2 8 1/2
1/4" MIN. CLEARANCE FROM
COMBUSTIBLE MATERIALS
A
WALL
TOP
HEATER ACCESS
PANEL
SEAL WITH BEAD
OF CAULKING ALONG
ENTIRE LENGTH OF TOP.
FIGURE 3B
W30A1, W30L1, W36A1, W36L1
MOUNTING INSTRUCTIONS
Right Side View
W**A UNIT SHOWN, W**L UNIT
CONTROLS AND HEATER ACCESS
IS ON OPPOSITE (LEFT) SIDE.
MIS-311 C
IT IS RECOMMENDED THAT A BEAD OF
SILICONE CAULKING BE PLACED BEHIND
THE SIDE MOUNTING FLANGES AND UNDER
TOP FLASHING AT TIME OF INSTALLATION.
NOTES:
RETURN AIR
OPENING
SUPPLY AIR
DUCT
1/4" CLEARANCE ON ALL
FOUR SIDES OF SUPPLY
AIR DUCT IS REQUIRED
FROM COMBUSTABLE
MATERIALS
WALL STRUCTURE
FOAM AIR SEAL
RAIN FLASHING
SUPPLIED