Download Disan DS A01 Technical data
Transcript
TABLE OF CONTENTS Planning 4 Making of the piping 21 Basic planning information ....................................... 4 General instructions ............................................... 21 Location of inlet valves on the floor plan ....................4 Laying of the tubing ................................................ 21 Location of the inlet valves: height ........................... 5 Laying and connection of the water vacuum system ....................................... 22 Location of the central vacuum cleaner .....................5 Planning of the tubing .............................................. 5 Planning of the water vacuum system ...................... 7 Laying of the backup boxes .................................... 23 Installation of the breather pipe 23 Laying of the electric control line 24 Particular requirements of planning ......................... 9 Testing 25 Planning of the power mains .................................. 10 Location of losses .................................................. 26 Characteristics of the fittings .................................... 8 Planning of the breather pipe ................................... 8 Calculation of the materials/Cost-estimate 12 Definition of the material needed for the tubing ....... 12 Choice of the inlet valves and of the electricity plates ........................................... 12 Choice of the cleaning accessories ....................... 16 Approximate calculation of labor for the complete installation of the system ........................................ 16 Installation and connection of the inlet valves and of the central vacuum cleaner 27 Installation and connection of the inlet valves .......... 27 Installation and connection of the central vacuum cleaner 28 Check of the functioning of the by-pass valve on the dust separator .................................... 31 By-pass valves adjustment ..................................... 31 Choice of the central vacuum cleaner .................... 16 Testing of the inlet valves ....................................... 32 List of optional for mod. DS Super Compact ........... 19 Final testing of the system ..................................... 32 List of optional for mod. Ds Modular range ............ 19 Delivery of the finished system to the customer ..... 32 Technical data of the central units .......................... 19 Certification ............................................................ 35 3