Download Benchmark BMA 220 SP - SOL Technical data
Transcript
DESIGN relief valve and the necessary length of pre-insulated corrugated stainless steel pipework and sensor cable to complete the solar installation can be supplied by Gledhill. Please ring our Technical Sales Department for details. If it is proposed to use copper pipework, the components and insulation will need to take account of the extremely high temperatures and pressures which can be experienced, and the ethylene glycol antifreezes which are used. Standard soft soldered fittings and pipe insulation will not be adequate. The insulation needs to be Class ‘O’ standard and the bracketting needs to allow for the increased thickness required. Brazing, press fit type with green viton seals or copper weld type fittings are all acceptable. Any compression joints will need to have brass olives. Because of the high temperatures, the pipework should be routed to allow for the necessary expansion or provided with flexible connectors. It is recommended that a filling tank/pump should be used to fill and vent the solar system but the fill and flush valve does incorporate a spare connection for a standard temporary filling loop (as used for central heating systems) so that once the system has been filled with the necessary antifreeze mixture, mains water pressure can be used to charge the system. Details of the filling/commissioning procedure using a filling tank/pump are included later in the Installation section of these instructions. All the necessary Health and Safety requirements should be followed when lifting and fitting the solar panels (collectors) on the roof. To prevent overheating in the summer (and discharge from the pressure relief valve), we suggest a saving of 50% of the energy required for the domestic hot water should be used as the target when calculating the number/area of solar panels (collectors) required. In addition to this we believe that a further 10-15% saving will be achieved because the BoilerMate A-Class OV SOL also contributes energy to the heating system. Switch The BoilerMate A-Class OV SOL is supplied with a 6kW electrical emergency back up system called ‘Switch’ which can be used to provide some heating/hot water in the case of failure of the main heat source i.e. gas boiler. This must NOT be used for prolonged periods or used to supplement hot water production only in summer if the main system is working correctly. Full details of the electrical requirements are provided in the Site Requirements and Installation sections of these instructions. ‘Switch’ will be activated by pressing the centre push button (marked ‘Switch’) located on the front control panel for at least 5 seconds (see diagram opposite). This replaces the function of the external boiler with the internal electric emergency boiler. The operating mode shown on the display will change fron ‘Normal’ to ‘Switch’. The ‘Switch’ symbol will flash as long as Switch is active. During Switch operation the hot water and central heating will still operate in a timed mode. The operating times can be altered by resetting the clock, if required, to suit the reduced energy input available. Page 21 SYSTEM DETAILS Once the fault has been resolved return to normal boiler operation by pressing in the centre push button marked ‘Switch’ for at least 5 seconds. The operating mode on the display will return to ‘Normal’.