Download Baxi 339 Technical data
Transcript
8.0 Installation 8.6 Fitting the Flue (Cont) Condensate Collector 10. The flue system can now be fitted. All burrs must be removed from any cut pipes to prevent damage to joint seals. Soap solution can be used to ease assembly of flue components. 90° Male - Male Elbow 11. The condensate collector must be fitted in the flue duct as shown and described in Section 7.11 (Fig. 24). IMPORTANT: The 90° male - male elbow supplied with the condensate collector must be included in the flue duct system between the boiler and collector. Separate Terminals 12. The two flue terminals must be fitted to the final section of each duct before completion. 13. Ensure that the final section of the flue and air ducts are cut to such a length that when the terminals are fitted they protrude through the outside wall(s). None of the slots in the terminal must be obscured (Fig. 26). Fig. 24 3mm Dia Flue Terminal 15mm 14. Drill two 3mm holes 15mm from the end of each final length of flue duct. The holes must be diametrically opposite each other. Using the screws supplied attach the terminals to the ducts (Fig. 25). Single Vertical Terminal 15. If the roof terminal (part no. 246140) is to be used the twin flue roof terminal adaptor must also be used (part no. 247922). Fig. 25 Slots must not be obscured Fig. 26 21