Download ADC ML-82 II Installation manual
Transcript
3. Electrical Connections NOTE: A wire diagram is located in the front electrical control box for connection data. a. Gas Models and Steam Models Only NOTE: A CIRCUIT SERVICING EACH DRYER MUST BE PROVIDED. For gas and steam dryers manufactured for operation at 3-phase (3ø), the electrical connections are made at the power distribution block located in the service box at the rear, upper left hand corner of the dryer. To gain access to the service box and contactor, the service box cover must be removed. Providing local codes permit, power to the dryer can be made by the use of a flexible U.L. listed cord or pigtail (wire size must conform to the rating of the dryer), or the dryer can be hard wired directly to the service breaker. In ALL cases, a strain relief should be used both where the wiring enters the dryer and the service box. 21