Download AEG EWA7500 User manual

Transcript
You can also store library files with a certain combination of components as
standard files.
The individual libraries comprise 120 positions divided into three categories.
Positions 1 - 17
are the subracks and the modules, whose number is defined during project planning (see chap. 5.2.2, 5.2.4 and
5.2.5). Only the price per item in the last column can be
edited here.
Positions 18 - 68
are hardware and software components for which you can
define whether or not and how often they should be included in the bill of materials. This is done by entering the
required number in the first column.
Positions 69 - 120
is at your disposition. You can enter for example special
modules or the cost for installation and planning. The
price per item entered here is used in the calculation and
in the bill of materials.
If an entry was made in one of the lines 69 -120, it is treated like lines 18 - 68.
Only the number and the price per item can be changed. The whole line can be
deleted with <Del>, however, if the cursor is at the start of the line.
You can skip to the previous or next line with < > ­and < >¯if the cursor is at the
start of the line.
You can skip to the first possible input position with <® >.
The line editor is valid within an input field.
From the column “number” one always skips first to the column “price per item”.
One cannot skip directly to the column “price per item” after position 18. If you
want to skip a column, simply press <Cr>.
21
Handling
59