Download Carrier 38YYS...G Installation manual

Transcript
38YY...G9 / 38YYS...G9
R-410A
Pump Down, refrigerant circuit and unit maintenance
Pump Down
Pump down is an operation intended to collect all the system
refrigerant in the outdoor unit.
This operation must be carried out before disconnecting the
refrigerant tubing in order to avoid refrigerant loss to the
atmosphere, if it becomes necessary to disconnect the
refrigerant connections for unit repair, removal or disposal; in
this case, after removal, unit must be delivered to an
appropriate disposal centre or the original dealer.
Shut off the liquid valve with the Allen wrench.
Turn the system on in cooling with fan operating at high velocity.
(Compressor will immediately start, provided 3 minutes have
elapsed since the last stop).
After 2 minutes of operation, shut the suction valve with the same
wrench. Turn the system off and switch mains supply off.
Disconnect tubing. After disconnection, protect valves and tubing
ends from dust.
Connect a gage on low side during a condenser pump down.
Compressor damage may occur if run at a negative suction
pressure.
Refrigerant circuit
Heat pump unit
13
7 5
7 5
Te Ta
9
9
16
1
13
8
2
16
1
12
8
2
12
14
14
15
4
11
10
4
11
6
Ti
15
10
6
7
7
Cooling cycle
Heating cycle
Legend:
햲
햳
햴
햵
햶
햷
햸
햹
Outdoor coil
Compressor “scroll”
Metering device
Strainer
Vapor valve
Liquid valve
Service pressure port
Indoor unit coil
햺
햻
햽
햾
햿
헀
헁
헂
Liquid distributor
Cooling metering device
Heating metering device
Additional suction accumulator
Reversing valve
Outdoor coil sensor
Crankcase heater
Discharge muffler
Gas
Liquid + Gas
Liquid
Unit maintenance
The following maintenance operations must be carried out
by qualified personnel.
Cleaning the coil
When necessary, proceed as follows for more careful cleaning
of the coil:
Carefully clean the coil with a vacuum cleaner from inside to
outside.
With the same vacuum cleaner, dust the inside of the fan
compartment and the fan blades.
Avoid any damage to the blades which may cause future
vibrations and noise.
Replace the unit cover and tighten the screws.
After long shutdown periods and at commissioning (for heat
pump models only).
Switch the mains supply OFF.
Remove unit top cover by losening holding screws and lifting the cover.
GB - 10
Energize the system by putting the main switch to ON without
starting the unit. (The remote control must be in the OFF position
at least 12 hours before the initial start up).
Do not disconnect the main switch during the unit operating season.