Download Carrier 38YYS...G Installation manual
Transcript
38YY...G9 / 38YYS...G9 R-410A Pump Down, refrigerant circuit and unit maintenance Pump Down Pump down is an operation intended to collect all the system refrigerant in the outdoor unit. This operation must be carried out before disconnecting the refrigerant tubing in order to avoid refrigerant loss to the atmosphere, if it becomes necessary to disconnect the refrigerant connections for unit repair, removal or disposal; in this case, after removal, unit must be delivered to an appropriate disposal centre or the original dealer. Shut off the liquid valve with the Allen wrench. Turn the system on in cooling with fan operating at high velocity. (Compressor will immediately start, provided 3 minutes have elapsed since the last stop). After 2 minutes of operation, shut the suction valve with the same wrench. Turn the system off and switch mains supply off. Disconnect tubing. After disconnection, protect valves and tubing ends from dust. Connect a gage on low side during a condenser pump down. Compressor damage may occur if run at a negative suction pressure. Refrigerant circuit Heat pump unit 13 7 5 7 5 Te Ta 9 9 16 1 13 8 2 16 1 12 8 2 12 14 14 15 4 11 10 4 11 6 Ti 15 10 6 7 7 Cooling cycle Heating cycle Legend: 햲 햳 햴 햵 햶 햷 햸 햹 Outdoor coil Compressor “scroll” Metering device Strainer Vapor valve Liquid valve Service pressure port Indoor unit coil 햺 햻 햽 햾 햿 헀 헁 헂 Liquid distributor Cooling metering device Heating metering device Additional suction accumulator Reversing valve Outdoor coil sensor Crankcase heater Discharge muffler Gas Liquid + Gas Liquid Unit maintenance The following maintenance operations must be carried out by qualified personnel. Cleaning the coil When necessary, proceed as follows for more careful cleaning of the coil: Carefully clean the coil with a vacuum cleaner from inside to outside. With the same vacuum cleaner, dust the inside of the fan compartment and the fan blades. Avoid any damage to the blades which may cause future vibrations and noise. Replace the unit cover and tighten the screws. After long shutdown periods and at commissioning (for heat pump models only). Switch the mains supply OFF. Remove unit top cover by losening holding screws and lifting the cover. GB - 10 Energize the system by putting the main switch to ON without starting the unit. (The remote control must be in the OFF position at least 12 hours before the initial start up). Do not disconnect the main switch during the unit operating season.