Download "user manual"

Transcript
2. AVAILABILITY OF MATERIALS
The District may purchase, from any source, essential material for the repair/support of classroom or
operational activities for safety concerns and/or to protect District property, when the Contractor
does not have the necessary material immediately available.
3. PREFERENTIAL PRICING
The District shall be given the benefit of any lower prices which may, for comparable quantity and
delivery, be given by the Contractor to any other school district, state, county, municipal or local
government agency for the products listed herein.
4. PACKAGING AND IDENTIFICATION
a. Packaging: Items shall be packaged sufficiently to protect them from damage during transit.
b. Packing Slip: Shall have the District Purchase order number, contents, quantity, and description.
c. If Not Properly Packaged or Identified, deliveries may be rejected, and all costs (return and redelivery) shall be at the Contractor’s expense.
5. PRODUCT SUBSTITUTION/MANUFACTURER’S BRAND CHANGE
This contract does NOT allow for product substitutions without written authorization by an
Authorized District Representative. If, during the course of the Contract, there is a manufacturer’s
brand change, the Contractor/Manufacturer representative shall not automatically substitute product.
Contractor shall submit specifications, brochures and/or a sample (upon request), for approval prior
to any future shipment.
If the new brand is accepted, all other terms, conditions and prices shall remain in effect. No
substitutions shall be made without prior written permission by the District.
6. FAILURE OF CONTRACTOR TO PROVIDE THE SERVICE/PRODUCTS AS AGREED
If in the opinion of the District, the Contractor at any time during the period of the Contract, fails to
properly and satisfactorily perform the service/provide the product(s) called for in the Contract, or
otherwise fails or neglects to comply with the terms of the Contract, the District may make
arrangements elsewhere for the material/service, or any part thereof, and hold the Contractor
responsible for reprocurement costs incurred by the District.
It is specifically provided and agreed that time shall be of the essence in regard to the Contract
performance requirement. Unacceptable performance may include but not limited to: late/non
deliveries, partial deliveries, delivery of wrong material, products not meeting specification, giving
wrong prices, invoicing problems, etc.
Section II. C – Technical Specifications
Video & Printing Equipment
2
IFB No. 2000000524