Download here (2.8MB PDF)
Transcript
Page 152 7.8 Post Flight Activities Preliminary analysis will be conducted by Mark Fittock during and after the flight using software developed for this task. This will be to examine the quality of the reduced gravity environment. After the payload is returned to the cathedral, the SD cards containing the data will be recovered by the member responsible for the data, Jan Speidel, under supervision of the Project Manager. Jan Speidel shall then compare to the data transmitted over the E-Link connection. The MAIN Payload, FISH and all other equipment will be returned to Kiruna by car at the end of the week by Jan Speidel and Nawarat Termtanasombat. Following the return to Kiruna, Nawarat Termtanasombat will update the simulation model that is developed. The team will conduct a detailed analysis of the data to determine the performance of the system in relation to the reduced gravity environment. Once these tasks have been completed, the team shall on review the performance of the project and produce the final report. RXBX-09-03-15_PDR_ESA.docx