Download Dingo User Manual
Transcript
Dingo User Guide
$%& # &
!"#$%
V BOOST 2
Test
Solar
flashes if wrong
T
test
here
Battery +
–
– + Solar
Fig. 4
$%& # &
!"#$%
V BOOST 3
Connect
Load
T
+
– + Solar
Load
c."L$8&"&.$"81*)%"=)/$*"(1//$(&'1/"
;+"&10(.'/9"&.$"=18'&'5$"IFJ"
-'%$"7%16"&.$"81*)%"=)/$*"1/&1"
the Test terminal (T).
!47"&.$")*)%6"*$2"21$8"/1&"7*)8."
then it is OK.
!47"&.$")*)%6"*$2"7*)8.$8"<0'(>*+"
then it is not"MN?"C.$(>"&.$"
=1*)%'&+")/2"&$8&")9)'/?"(There
must be some light on the solar
panels for this test to work).
If OK connect to the Solar
=18'&'5$"IFJ"&$%6'/)*?
d."C1//$(&"&.$"/$9)&'5$"IHJ"-'%$"
from DC load circuit to the
load negative (-) terminal and
(1//$(&"&.$"=18'&'5$"-'%$"7%16"
&.$"*1)2"&1"&.$"*1)2"=18'&5$"
(+) terminal. Test that the load
('%(0'&"-1%>8?"The controller
'8"=%1&$(&$2")9)'/8&"*1)2"8.1%&"
('%(0'&8,";0&"()//1&"=%1&$(&"+10%"
load devices if you reverse the
connection to them. Now, set
the system voltage - see pg.10
+ – Battery –
7
Note: The controller is protected against short circuits on the solar input.