Download Operation Manual INTERNAL PIPE COATING SYSTEM
Transcript
Operation 5 Operation WARNING Explosion hazard! Processing solvents or materials containing solvents in connection with an rotary atomizer device can cause sparks and therefore explosions. This may result in serious injury to persons and damage to property. ➤➤ Do not use any solvents or materials containing solvents with the internal pipe coating system. Observe the technical notes of the respective material manufacturer. Observe the operating manual for the spraying device used. 5.1 Commissioning the machine Prerequisites for commissioning: ➤➤ The machine has to be fully assembled. ➤➤ Do not commission the machine unless you have the specified protective equipment. For details, refer to chapter 2.4.4 on page 12. ➤➤ A sufficient quantity of the spraying material has to be available. ➤➤ A sufficient quantity of a suitable cleaning agent has to be available for flushing the system parts filled with mixed material within the potlife. Observe the operating manual for the spraying device used. ➤➤ Check whether all safety features are installed and fully operational. ➤➤ Check the level of lubricant in the oil container of the air maintenance unit (if fitted) and top up if required. ➤➤ Flush the machine (see chapter 5.3 on page 27) to remove the factory test medium (for first operation) or any residue of previous spraying material. ➤➤ During commissioning (flushing), check whether all machine parts are tight and re-tighten the connections if required. ➤➤ Ensure correct grounding of the spraying device and of the object to be coated (see operating manual of the spraying device). Translation of the original operation manual Rohrinnenbeschichtung_BA_en_1312 • jw 25