Download - Rorke Data
Transcript
Chapter 4 Subsystem Connection and Operation 4.3.2 Power On Procedure When powering on the subsystem, please follow these steps. 1. Power on the JBOD(s) or cascaded subsystem(s). If any of the subsystems have been connected to a JBOD or cascaded subsystem, the JBOD or cascaded subsystem must be powered on first. Please refer to the instruction manual that came with the JBOD to see its own power on procedure. 2. Power on the main subsystem. The subsystem should only be powered on after all the JBODs or cascaded subsystems have been powered on first. The power on procedure for the subsystem is described below. 3. Power on the application servers. The application servers or host computers should be the last devices that are turned on. Please refer to the instructions that came with your application servers to see their own power on procedures. 4.3.3 Galaxy RAID Power On Procedure To power on the subsystem, turn on the only power switch located on the rear center of the subsystem. (See Figure 4-12) The power switch controls all three PSUs. Once it is switched on, all PSUs will be functional. Figure 4-12: Subsystem Power Switch Power On 4-11