Download XML Editor User Manual
Transcript
The Syncro SVN Client changes are the modifications you made to your working copy as a result of editing, removing or adding resources. The view presents the status of the working copy resources against the BASE revision after a Refresh operation. You can view the state of the resources versus a repository HEAD revision by using the Synchronize actions from the Working Copy view. Presentation modes The Synchronize view has three presentation modes: Tree mode The resources are presented in a tree layout as in the above image which mirrors the tree structure of the SVN repository and of the Working Copy view. This mode is more appropriate when you want a quick overview of the locations which need synchronization with the SVN repository or when you want to apply a synchronization operation (Commit, Update, Revert, Add) recursively on a folder. Figure 17.18. Synchronize View - Tree mode Compressed mode The resources are presented in a layout with two levels, that is a compressed path for each folder in the list as in the following image. This mode is useful when you need the full list of resources which need synchronization without having to expand a tree to get to the unsynchronized resources of that folder. Also it is useful when you do not want to apply a synchronization operation recursively, that is the operation applied to a folder resource must not have any effect on other unsynchronized resources located in the folder but displayed in other list entries in the view. 393
Related documents
XML Author 10.3 User Manual
XML Editor 10.3 User Manual
XML Editor 10.3 User Manual for Eclipse
Performing a Query Session
XML Author 10.3 User Manual for Eclipse
User Manual
XML Author 11.2 User Manual
Oxygen XML Author 12.2
XML Author 11.2 User Manual for Eclipse
XML Editor 11.2 User Manual
Oxygen XML Developer Eclipse Plugin 16.1
XML Editor 11.2 User Manual for Eclipse