Download Elixir Schedule Designer User Manual

Transcript
Cookbook
Figure 5.8. Every Last Working Day Of The Quarter
3.
Follow step 5 to 9 mentioned in the section called “Trigger On The First Monday Of The Month”.
4.
When the configurations are done correctly and saved, this trigger will run on every last working
day of each quarter.
19