Download EC171809-Eyezone VIP..

Transcript
EMC TEST REPORT
Report No. : EC171809
11. Electrical Fast Transient/Burst Immunity Test (EFT/BURST)
● Final Test Result
● Pass Performance Criteria
: PASS
: B
● Required Performance Criteria : B
: IEC 61000-4-4:2004
● Basic Standard
● Product Standard
● Level
● Test Voltage
● Temperature
● Relative Humidity
● Atmospheric Pressure
● Test Date
● Test Engineer
● Observation
: EN 55024:1998/A1:2001/A2:2003
: on Input power ports -- 2
: on signal port and telecommunication ports -- 2
: on Input power ports -- ±0.5 / ±1.0 kV
: on signal port and telecommunication ports -- ±0.25 / ±0.5 kV
: 26 ℃
: 48 %
: 103 kPa
: Oct. 25, 2011
: Yen-Liang Ou
: During the test at ±1kV on the L1, L2 and PE Line, there were
noises caused by interference. After the test, the equipment
continued to operate as intended without operator intervention.
11.1. Test setup
SPORTON International Inc.
Page Number
: 47 of 65
TEL : 886-2-2696-2468
Issued Date
: Nov. 21, 2011
FAX : 886-2-2696-2255
Report Version
: 01