Download User Manual for Sustainable Development Interactive Tutorial

Transcript
6. To insert additional resource build-up and draw-down indicators, click on “Add
Build-up Row” and “Add Draw-down Row” respectively.
7. To remove resource build-up and draw-down indicators, click on “Delete Build-up
Row” and “Delete Draw-down Row” respectively.
Page 21 of 36