Download Installation & Operating Instructions

Transcript
Table of Contents
4.6.7
4.6.8
Attaching the induced draught cable
Installing the insulated door
37
37
4.7
4.7.1
4.7.2
Electrical connection and wiring
Information on circulating pumps
Concluding work
40
4.8
Connecting the hydraulic safety devices
43
4.9
Installing the WOS system (optional)
44
5
Start-up
49
5.1
Before commissioning / configuring the boiler
49
Initial startup
50
5.2
40
41
5.2.1
Permitted fuels
5.2.2
Fuels permitted under certain conditions
51
5.2.3
5.2.4
Non-permitted fuels
Heating up for the first time
52
53
6
Decommissioning
56
6.1
Mothballing
56
6.2
Disassembly
56
6.3
Disposal
56
7
Appendix
57
7.1
Pressure equipment regulation
57
7.2
Technical specifications - Lambda control with partial load values
58
Addresses
59
7.3
7.3.1
7.3.2
Firewood
Wood briquettes
Boiler with Lambda control
Boiler with manual controller
Address of manufacturer
Address of the installer
Installation Instructions S1 Turbo | M1470113_en
50
50
51
53
53
59
59
3