Operation
Energize/Startup
1.
2.
3.
4.
Close the DC Breakers from the battery bank to the inverter.
Close the AC Output Breakers.
Close the AC Input Breakers.
Close the PV input Breakers.
3
Figure 9
2
4
1
1
3
Startup Procedures
De-energize/Shutdown
1. Open the PV Breakers.
2. Open the AC Breakers.
3. Open the DC Breaker for the Battery.
2a
2b
Figure 10 Shutdown Procedures