Download 112A 180A 280A
Transcript
Installation instruction Inspection item Pay much attention to the following during installation. Check them again after completion. (1) Inspection items after installation Inspection item Defect If the installation of valve box is secure ? If gas leakage inspection is completed ? If complete insulation is achieved (refrigerant piping and tubing connections) ? If the voltage of the power supply is consistent with that on the nameplate ? If there is improper wiring or piping ? If there is construction without grounding ? If the thickness of the wire is as specified ? Falling off, vibration and noise No heating/cooling Water leakage Out of service, burnt Out of service, burnt Danger in electric leakage Out of service, burnt (2) Inspection upon delivery Inspection item If the electric box cover is installed If the installation specification is transferred to the customer 6 Inspection column Inspection column