3.2.2. The pretreatment before installation
1) Inspecting the package carefully to see whether it have been broken.
2) If transport in cold weather, the cabinet should be placed on the heating receiving area for
24 hours before installation.
3) Before unpacking, the cabinet should be moved to the place near the using point.
3). Move to destination, in front of the door
4). Unpack and Transportation
The base stand is on the top of the cabinet when packing, it should be taken out firstly
before installation. The cabinet must not be inversion during transportation. Forbid to topple
over and dismantle the cabinet.
5). Installation Check and adjustment
Installation, Check and Adjustment should be completed by after-sales engineer.
6). Training
After installation, after-sales engineer will tell operator the basic functions, operate
steps and notices etc.
The person who is not qualified by training can not operate the cabinet.
8