Download MaxQ High Performance Incubated Orbital Shaker
Transcript
Section 1 Installation Install the Platform (cont.) 5. Insert the hex socket head screws as the four holes are located. Do not tighten the screws. 6. Remove the 1/4-20 alignment pins and replace them with the remaining two hex socket screws. 7. Seat all screws very tightly, using the T-handle wrench. If a torque wrench is available, tighten these screws at 120 in./lbs. Check these screws monthly if the unit is operated at or near maximum RPM. Caution Use only the included hex socket screws and T-handle wrench to fasten the platform. If a torque wrench is available, torque the screws to 120 in./lbs. The platform screws should be checked monthly if the unit is operated at or near maximum RPM. s Assemble the Flask Clips Each Flask Clip, up to 1 liter in size, is supplied with a metal spring that must be installed onto the clip. Two-liter flask clips are supplied with two springs. For flask clips through 500 ml, insert the end of each spring into the holes on the top of the clip leg as shown in Figure 1-11. One liter and larger flask clips require the spring ends to be hooked together as shown in Figure 1-12. The spring ends on the two-liter flask clip are also hooked together, but require the rubber spring tubes to be installed between the clip legs (Figure 1-11). The second spring and spring tubes are placed around the base of the clip after it has been installed onto the platform. Upper Spring and Spring Tubes Clip Leg Lower Spring and Spring Tubes Figure 1-11. Clip Mounting Screw Thermo Scientific Figure 1-12. Clip Components Orbital Shaker 1-5