Download D6.3 Evaluation Guidelines for Developing POPEYE Applications
Transcript
Detailed information about the First Demonstration event can be found in the appendix “POPEYE First Demonstrator event proceedings” of Deliverable D8.1 “First POPEYE Demonstration”. The Second Demonstration event is described as part of Deliverable D8.2 “Final POPEYE Demonstration”. POPEYE Deliverable D6.3 – V2 p. 26/39 Dissemination Level: Public