Download EINSTEIN Audit Guide 2.0.

Transcript
Figure 41: Comparison of the additional total yearly cost per saved energy of the different energy efficiency
measures. All solar thermal proposal are based on the alternative “Heat Recovery” and include also heat
recovery and renewal of the boiler.
4.1.10 EINSTEIN Step 10: Reporting and presentation
You are happy with this result. It seems that with the alternative ST-FPC300 You have an attractive proposal
to be presented to the company that allows for 42,5% of primary energy savings. You print out the EINSTEIN
audit report, that is automatically generated by the tool, and call Ms. Cleanton in order to make an
appointment for the presentation of the results.
Guide for EINSTEIN Thermal Energy Audits
102