4.2.3.3 Total heat demand and technical data of boilers are unknown
The situation gets completely undetermined, if also the nominal boiler power is unknown, and therefore no
reasonable constraint can be made for the process 2 heat demand (Example project “EINSTEIN Audit Guide
42 2c”).
4.2.4 Using data estimates
Some of the results of the examples from the previous section can be improved, if apart of the mathematical
relationships (energy balances) also estimations based on engineering knowledge are used.
In our examples this can be for example:
✗
it can be supposed that boiler part load factors are in a narrower range than from 0 to 100%, as both
extremes are not very likely in practice.
✗
Even if data regarding the length of the pipes are missing, at least an order of magnitude can be
estimated.
Using the data estimation – option in the EINSTEIN tool this can be done automatically, and in the case of
example 2b the process heat demand of the coagulation process (process 2) can be determined with
sufficient accuracy (< 30% error) to 745 MWh. Only the circulation heat demand of this process remains still
undetermined (due to uncertainty in the mass flow rate of the inflowing process medium): QUPHc = 737 ± 37
%.
Guide for EINSTEIN Thermal Energy Audits