Download Marad User Manual, version 4

Transcript
Work list filter
The work lists can be filtered per group, so that only the points of one or several groups can be shown and
printed.
While you are in the work list, click on the lamp of the group(s) to be
shown or click on a line in the centre overview screen if you only want to
view and print the work list of this group/those groups,
Print
This prints the week list.
Runninghours
Marad must know the actual running time in hours for the
engines/machines for the benefit of the maintenance points which are
based on the number of running hours.
Marad wants to know at least once a week what the running hours are.
The ‘Running hours’ light for a certain machine will remain red for as
long as the running hours have not been specified. The light will turn
green once all the running hours have been entered.
The window shown opposite is displayed by clicking the ‘Runninghours’
button.
In the ‘Actual run hours’ field, enter the running hours as given on the
engine’s/machine’s meter. The running hours will be displayed in yellow.
Marad User Manual, version 4.19
12