Download PROBID — Evaluation Pack - Procon Construction Systems

Transcript
PROBID — User Manu al
T u t orial Dat a
Resources used in the Estimate
═══════════════════════════════════════════════════════════════
Code
Resource Description
Unit Cost Cost Type
═══════════════════════════════════════════════════════════════
Supplier: None Specified
LH10
LABOUR, Unskilled Class II
LH20
LABOUR, Skilled Class IV
LH30
EQUIPMENT OPERATORS
LH40
CARPENTERS, Formwork
LH60
BRICKLAYERS
ET10
DUMP TRUCKS, 13 m3 boxes
MTP020 FORM PLYWOOD, Sheet 1200x2400
MTF032 FRAMING TIMBER, Oregon
MCS030 CONCRETE, Class D Cement,30MPa
17.80/MH
20.40/MH
22.80/MH
22.30/MH
23.20/MH
37.00/HR
135.00/Sh
540.00/m3
108.00/m3
Labour
Labour
Labour
Labour
Labour
Rented eqpt
Material
Material
Material
Supplier: ACME - ACME EQUIPMENT RENTALS PTY LTD
ES10
ELEVATING SCRAPER, CAT 623
105.00/HR
EC60
ROLLER, Towed Sheepsfoot
250.00/WK
ED06
DOZER, CAT D6, Operated
97.00/HR
EL10
WHEELED LOADER, CAT 966
95.00/HR
Rented
Rented
Rented
Rented
Supplier: INTPLT - INTERNAL PLANT DEPARTMENT
ED09
BULLDOZER, CAT D9, Weekly Rate
2000.00/WK
ES30
SCRAPER, CAT 631, Weekly Rate
2400.00/WK
MFD000 DIESEL FUEL, Supplied to Job
0.45/Li
Own eqpt
Own eqpt
Material
Supplier: BORAL - BORAL REINFORCEMENT PTY LTD
MRB070 REINFORCING BAR, cut & bent
810.00/Tn
Material
Supplier: GENB&T - GENERAL BRICK & TILE PTY LTD
MMBC00 BRICKS, Common, 230 x 100 x 76
325.00/MB
Material
eqpt
eqpt
eqpt
eqpt
─────────── RESOURCES IMPORTED FROM OVERHEAD LIBRARY ──────────
Supplier: None Specified
LS10
PROJECT MANAGER, Annual Cost
80000.00/Yr Labour
LS20
PROJECT ENGINEER, Annual Cost
43000.00/Yr Labour
LS30
SITE ADMINISTRATOR,Annual Cost
46000.00/Yr Labour
═══════════════════════════════════════════════════════════════
APPENDIX A — T u to ria l Dat a
Pag e A/3