Download - AdriaMed
Transcript
Annex A Table 2. Field in the structure record of the HAUL Spreadsheet. Field Partner Haul code Vessel Date Time (00:00)B LatitudeB LongitudeB Time (00:00)E LatitudeE Longitude E Depth (m)B Depth (m)E Speed (knots) Route Duration (min) Sweep length Warp length Bottom shape Weather conditions Sea conditions wind direction and speed hr T/60 Note The name of the country participating This number is a key field for accessing record in the database. Therefore each fishing station must have its unique station number. The haul code has one-letter code that indicates the country and two digit code indicating the number assigned to trawl station (e.g. A01 = Albania, haul number 1) The name of the vessel This field contains the date in European standard format in day/month/year sequence Time at the beginning of the trawl haul The Latitude at the beginning of the trawl haul, as degrees, minutes, and seconds in time format The Longitude at the beginning of the trawl haul, as degrees, minutes, and seconds in time format Time at the end of the trawl haul The Latitude at the end of the trawl haul, as degrees, minutes, and seconds in time format The Longitude at the beginning of the trawl haul, as degrees, minutes, and seconds in time format The bottom depth in metres at the beginning of the haul operation The bottom depth in metres at the end of the haul operation The mean speed of the vessel during trawling in knots The direction of the trawl operation in degrees This is the duration of the trawl haul in minutes. The length of the trawl sweep in centimetres The length of the trawl warp in centimetres This is a three letter code indicating the bottom characteristics during the trawl operation Some notes on the weather conditions during the trawl operation Some notes on the sea conditions during the trawl operation The wind direction and the speed during trawling The length in centimetres of headrope This is the duration of the trawl haul up to one hour. It is calculated on the basis of the Duration (min) field – thus T/60 is not an input field 13