Download Medana Operational&M..
Transcript
Department: Technical Department Machine preparation, start-up and Maintenance MANUAL Document N°: 2144_2009_M_09_10 Author: M.Lambri Page 45 of 82 Equipment Name: GK 72 Encapsulation Line Equipment SN: GK72101005 Data: 06 Sep 2010 5.2 Capsule conveyor 1-Main capsule conveyor lean on machine frame and tumble dryer conveyor 2-Remove 4 screw at the side of chute discharge lips 3-unplug the conveyor motor power cable 4- lift the conveyor and slide it on the machine side to pull it out