REHABILITATE CAUDELL HALL
BUILDING 18
STATE UNIVERSITY OF NEW YORK
BUFFALO STATE COLLEGE
SUCF PROJECT NO. 03421
I.
Air Terminal Unit Reports: : In addition to other requirements for terminal units, include
the following:
1.
2.
J.
DIVISION 23 – HVAC
Unit Data: Include the following:
a.
System and air handling unit identification.
b.
Location and zone.
c.
Test apparatus used.
d.
Area served.
e.
Air terminal make.
f.
Air terminal number from system diagram.
g.
Air terminal type and model number.
h.
Air terminal size.
Test Data: Include design and actual values for the following:
a.
Airflow rate in cfm (minimum and maximum).
b.
Preliminary airflow rate as needed in cfm.
c.
Final airflow rate in cfm.
d.
Space temperature in deg F.
e.
Duct Supply Air Temperature in Deg F.
Pump Test Reports: In addition to other requirements for pumps, include the following
data:
1.
Unit Data: Include the following:
a.
Unit identification.
b.
Location.
c.
Service.
d.
Make and size.
e.
Model and serial numbers.
f.
Fluid and concentration (if other than water).
g.
Fluid flow rate in gpm.
h.
Fluid pressure differential in feet of head or psig.
i.
Pump rpm.
j.
Impeller diameter in inches (nameplate).
k.
Motor make and frame size.
l.
Motor horsepower and rpm.
m.
Voltage at each connection.
TESTING, ADJUSTING AND BALANCING
230593 - 15