STRUCTURE
0341b Structural steel
Tolerances
Measurement: Tolerances are to be checked by measurement after fabrication when corrosion
protection has been applied.
Conformance: To AS 4100 clause 14.4.
3.2
WELDING
General
Standard: To AS/NZS 1554.1.
Weld category
Weld categories not shown on the drawings: Category GP.
Weld type
Weld type not shown on the drawings: 6 mm continuous fillet weld made using E48XX electrodes or
equivalent.
3.3
BOLTING
Connections
Connection type: For connections not shown on the drawings, provide 10 mm plates, 6 mm
continuous fillet welds and 2 M20 bolts in 8.8/s bolting category.
Foundation bolts
General: Provide each foundation bolt with 2 nuts and 2 oversize washers and provide sufficient
thread to permit the levelling nut and washer to be set below the base plate.
Lock nuts
General: Provide lock nuts for bolts in moving parts or parts subject to vibration and for vertical bolts in
tension.
Tensioning of bolting categories 8.8/TB and 8.8/TF
Method: Use part-turn-of-nut or load indicating washers.
3.4
SURFACE PREPARATION AND TREATMENT
General
General: Conform to the Steel – protective paint coatings and/or Steel – hot dip galvanized coatings
worksections as appropriate.
General: Coat structural steelwork not encased in concrete .
Standards: To AS 1627 and AS/NZS 2312 Section 1.
Surface preparation: Class 1 blast.
Coating: Coat prepared steelwork as follows:
- Primer: Zinc phosphate primer.
- Thickness: 70 μm.
- Requirement: Verify and record thickness.
- Concrete encasing: Where members are part concrete encased extend the priming 25 mm into the
surface to be encased.
- Inaccessible surfaces: Where surfaces will be in contact or near contact after fabrication or erection,
apply the finish and allow it to dry before assembly.
Shop work: Apply the primer coat or protective system to the structural steel before delivery to the site.
Transport and handling: Do not damage the paintwork.
Site work: After erection, repair damage to the shop coating and apply coating omitted at site
connections.
3.5
FIRE PROTECTION COATINGS
General
General: Apply fire protection to structural steelwork in conformance with the Structural Fire
protection worksection.
3.6
ERECTION
Temporary work
General: Provide all necessary temporary bracing or propping.
© NATSPEC (Apr 05 – Amdt Oct 07)
128