Download The Hive Specification - Co
Transcript
STRUCTURE 0341b Structural steel Tolerances Measurement: Tolerances are to be checked by measurement after fabrication when corrosion protection has been applied. Conformance: To AS 4100 clause 14.4. 3.2 WELDING General Standard: To AS/NZS 1554.1. Weld category Weld categories not shown on the drawings: Category GP. Weld type Weld type not shown on the drawings: 6 mm continuous fillet weld made using E48XX electrodes or equivalent. 3.3 BOLTING Connections Connection type: For connections not shown on the drawings, provide 10 mm plates, 6 mm continuous fillet welds and 2 M20 bolts in 8.8/s bolting category. Foundation bolts General: Provide each foundation bolt with 2 nuts and 2 oversize washers and provide sufficient thread to permit the levelling nut and washer to be set below the base plate. Lock nuts General: Provide lock nuts for bolts in moving parts or parts subject to vibration and for vertical bolts in tension. Tensioning of bolting categories 8.8/TB and 8.8/TF Method: Use part-turn-of-nut or load indicating washers. 3.4 SURFACE PREPARATION AND TREATMENT General General: Conform to the Steel – protective paint coatings and/or Steel – hot dip galvanized coatings worksections as appropriate. General: Coat structural steelwork not encased in concrete . Standards: To AS 1627 and AS/NZS 2312 Section 1. Surface preparation: Class 1 blast. Coating: Coat prepared steelwork as follows: - Primer: Zinc phosphate primer. - Thickness: 70 μm. - Requirement: Verify and record thickness. - Concrete encasing: Where members are part concrete encased extend the priming 25 mm into the surface to be encased. - Inaccessible surfaces: Where surfaces will be in contact or near contact after fabrication or erection, apply the finish and allow it to dry before assembly. Shop work: Apply the primer coat or protective system to the structural steel before delivery to the site. Transport and handling: Do not damage the paintwork. Site work: After erection, repair damage to the shop coating and apply coating omitted at site connections. 3.5 FIRE PROTECTION COATINGS General General: Apply fire protection to structural steelwork in conformance with the Structural Fire protection worksection. 3.6 ERECTION Temporary work General: Provide all necessary temporary bracing or propping. © NATSPEC (Apr 05 – Amdt Oct 07) 128 "[insert date]"