Download MISFMS_Entering Budget_5june2014

Transcript
Introduction to ICAR-ERP ....................................................................................................................... 2
New Document Formats as per Madan Committee .................................................................................. 2
Importance of Project Budget ................................................................................................................... 2
Projects MIS and Related Notes ............................................................................................................... 2
How to Enter Project Budget .................................................................................................................... 4
Introduction to ICAR-ERP
ICAR-ERP is comprehensive Enterprise Resource Planning (ERP) software for Indian
Council of Agricultural Research (ICAR). It will be used to store and manage data generated
from every process of the organization. This ERP has bee developed under NAIP sub-project
“Implementation of Management Information System (MIS) including Financial
Management System (FMS) in ICAR”. This solution will enable ICAR to enhance its
efficiency and introduce best practices in the areas of Financial Management, Human
Resource Management, Project Management, Procurement & Stores Management, Grants
and Budgeting and Payroll.
New Document Formats as per Madan Committee
This ERP solution is designed for the new formats which were recommended by a
committee under the chairmanship of Dr. M.L. Madan. This solution was presented in
the Director’s meet in July 2011 under the chairmanship of Secretary, DARE and
Director General, ICAR; and was approved in governing body and then implemented
in ICAR.
Importance of Project Budget
Project information is needed for indent/PO/Bill to get processed. But this information
can only be entered if Project Budget has been entered in the system.
So until PI/Co-PI enters project budget in system project related indent/PO/bill will
not get processed.
Projects MIS and Related Notes
In Projects MIS, as a part of data migration activity, basic RPP-I document information of all
the existing ongoing research projects of ICAR has been migrated into this ERP solution from
information available in PIMS-ICAR.
This basic information includes Project title, duration, team members etc.
However, after Go-Live, PI of a project will have to enter the remaining budget for the
project. This document tells in detail how the budget information can be entered.
Note 1: A detailed user manual and Computer Based Trainings CBTs) have also been created
for Projects MIS. User can also refer to them.
Note 2: Only remaining budget will be entered for a particular project. For example, let us
assume that a project is from 01-April-2013 to 31-March-2015. The total project budget is
Rs. 10 crore and out of that Rs. 2 crore has already been consumed. So the PI WILL ONLY
enter budget of Rs. 8 crore (=10-2) into the system.
Note 3: In case you are not able to find your project in budget form, it means that it was not
entered in PIMS and hence has not been migrated into the system. Thus, to create new
project, please refer to a separate document “Manual 2 - Creating RPPI for Externally
Funded Project”.
Note 4: For entering budget amounts, a set of Major and Minor Expenditure Heads have
been proposed by ICAR HQ. All the amounts have to be entered under these major and minor
heads.
They have been listed below for your ready reference:
Major Expenditure Heads:
1. Grants – Capital (similar to non recurring expenditures)
2. Grants – General (similar to recurring expenditures)
3. Grants – Salaries
Minor Expenditure Heads:
Capital-Others
Equipments
Furniture & Fixtures
GAD-Communication
GAD-Infrastructure
GAD-Others(excluding TA)
GAD-R&M-Equip,Vehicles & Oth
GAD-R&M-Minor Works
GAD-R&M-Office Build.
GAD-R&M-Residential Build.
GME-Guest House Maint.
GME-HRD
GME-Other Items (Fellow, Sc)
GME-Other Miscellaneous
GME-Publicity&Exhibitions
GPO-Pension & Other
GRO-Operational Expenses
GRO-Research Expenses
GTA-Domestic TA/Transfer
GTA-Foreign TA
Information Technology
Institutional Charges
Library Books and Journals
Livestock
Loans and Advances
Salaries-Contractual
Salaries-Establishment Charges
Salaries-Overtime Allowance
Salaries-SRFs/RAs
Salaries-Scientific
Salaries-Supporting
Salaries-Technical
Salaries-Wages
Vehicles & Vessels
Works-Building-Minor Works
Works-Building-Office Building
Works-Building-Resi. Building
Works-Land
How to Enter Project Budget
1. Login into the ERP Application and click on the Projects folder
2. Click on “Enter Budget” link. The following window will open up.
3. In the “Project Number” field:
a. either enter your 7 digit system generated project number or
b. click on the dropdown (LOV) button.
i. A new window will open up
ii. In the find field, enter “%” symbol and click on Find button.
iii. Enter your project number or your PIMS/PME Code or your
Project Title between “%” symbols and click on find button.
E.g. if the PIMS code is IXX00125, enter %IXX00125% and
click on find button.
Note: In case you are not able to find your project in budget form, it means that it was not
entered in PIMS and hence has not been migrated into the system. Thus, to create new
project, please refer to a separate document “Manual 2 - Creating RPPI for Externally
Funded Project”.
4. The next field to be filled is Budget Type. If you are entering budget in which
you will enter funds available for your institute to carry out the project, select
“Expenditure Budget” and click on OK.
5. A new window will open up. Here let us enter the following values:
a. Fund Type: Enter the fund type of your project. For Example, institute
funded project come under Plan. Externally Funded Projects come
b.
c.
d.
e.
f.
under Deposit Schemes. If the Funding Agency for the externally
funded project is Domestic, select Deposit Schemes – Domestic. If the
Funding Agency for the externally funded project is Foreign, select
Deposit Schemes – Foreign. In this example, let us assume project is
funded from domestic funding agency (DBT).
Scheme Code: Select the name of the scheme under which your project
is running.
Division Name: Select the name of the division under which this
project is running.
Funding Agency Name: Enter the name of the funding agency
(mandatory and only for externally funded projects).
Funding Agency Country: Enter the country of the funding agency
(mandatory and only for externally funded projects).
Click on OK.
6. Now user needs to allocate budget in the project. To accomplish this, click on
“Details” button. A new window will open.
7. Here user can see the 3 major expenditure heads. There are separate minor
heads under each major head. Process to enter budget in any minor head will
remain the same. In this example, let us allocate under equipments.
Equipments will come under Grants – Capital. So select Grants – Capital from
the window above and click on Budget Lines Button. A note will appear
which says:
“Please note that Budget Amount that you enter for a particular month would be
Applicable for that financial year.”
Click on OK. A new window will open.
8. Here we will enter the following information:
a. Minor Expenditure Head: Click on the drop-down button and you can
see the minor heads under that particular major head (in this example,
Grants – Capital).
Select the appropriate minor head and click on OK.
b. Amount Type: Click on the dropdown button. Value “Raw Cost” will
come automatically.
In the next 4 columns, user can see four months.
Remember the note which says “Please note that Budget Amount that you
enter for a particular month would be Applicable for that financial year.”
Therefore:
i. User may enter the budget in any month; he will be able to use
that amount for the entire financial year. For example, if user
enters amount in November 2012, he/she will be able to use
that budget for April 2012-March 2013.
ii. All the reports related to Projects MIS give financial year wise
fund availability and not month wise fund availability (even
though amount is entered month wise).
iii. To enter budget in some other month, user can navigate using
the arrow buttons on the window.
c. Saving the row: As soon as you save your work, two more lines will be
generated with amount type “Currency” and “NA”.
These rows are generated automatically by the system and are used for
integration with other areas. User needs to enter only the “raw cost”.
Note: Do not enter the same “minor expenditure head” twice. A minor
head can be entered only once on a budget; to enter values for multiple
years use the arrow buttons to navigate.
d. In a similar fashion, enter budget for other minor heads.
e. Close windows and reach the first window which is shown below:
f. Submit and Baseline: All the information that user enters will get
saved in the draft status only. To change the status from draft to final,
click on the “submit” button once. The name of button will change to
“baseline”. Then click on “baseline” button. And the status is changed
to final.
Note: Until user submits and baselines the budget, he/she will not be
able to create an indent, PO or bill against that project budget.