Download DoubleBed™ Trampoline User`s Manual
Transcript
Assembly and Installation Instructions Person 2 (Bottom mat) (Top mat) (Top view) (Top view) Person 1 11) Now connect a spring to every middle V-ring and spring 12) Connect remaining jumping mat to top rail of trampoline notch, working clockwise around the trampoline. Have someone frame using 4 springs (as described in Step 8). work across from you, also going clockwise. Starting at one of the 4 springs that you just connected, count 3 Note: It is important to have someone working across from you. V-rings and spring notches clockwise, and connect another Otherwise the springs could become over-extended, causing spring. Continue to install springs all the way around the them to become difficult to attach. trampoline. Reposition the initial 4 springs if necessary. (Top mat) (Top view) 13) Now connect a spring to the left of every spring already 14) All 112 springs should now be connected. The bottom mat installed, working clockwise around the trampoline. Have should have every other spring connected, and the top mat someone work across from you, also going clockwise. When should be lacking a spring at every 3rd spring location. finished, the springs should be spaced as shown above. 14