1 m min. F Four fixed slinging points are provided for on the roof of each Functional Unit. F F These lifting lugs are to be removed when the Functional Units are in the immediate proximity of their definitive installation. 5.5 F F Slide the Functional Unit along, using three cylindrical rollers of 30 mm min. diameter. Thus moving it to its final installation place. Installation of a switchboard Please refer to the instructions in the Civil Engineering Guide (See § 2.5). The limits of the civil engineering layout depends on the type and quantity of materials to be installed. 5.6 Lift the Functional Unit by 4 slings each one capable of supporting 1,000 kg. Respect the minimum carrying height as shown on the above diagram. Position the cells whilst respecting minimum clearance distances in front of, behind and to each side of the switchboard. Revalorizing packaging waste After unpacking, the materials remaining (cover, wooden floor panel, etc) should be sorted and sent to the appropriate recycling services. 13