Download Installation/User Manual
Transcript
YC500 Number per Branch 2 3 4 5 6 7* 8 9 EXTERNAL WIRE SIZE (AWG) MAXIMUM EXTERNAL CABLE LENGTH (ft) 12 370.7 237.1 167.9 124.3 93.6 70.2 51.4 35.7 10 593.1 379.4 268.6 198.9 149.7 112.3 82.3 57.1 8 926.8 592.9 419.6 310.7 233.9 175.5 128.6 89.3 6 1482.8 948.6 671.4 497.1 374.3 280.8 205.7 142.9 *7 is the maximum number/branch with a 20 amp breaker tep 2 – Attaching the APsystems Microinverters to S the Racking or the PV Module Frame Figure 5 A. Mark the location of the Microinverter on the rack, keeping in mind the PV module junction box or any other obstructions. B. Mount one Microinverter at each of these locations using hardware recommended by your module racking vendor. C. GROUNDING WASHER: If using the appropriate grounding washer (check with a licensed electrician), attach the grounding washer between the frame and the Microinverter. WARNING: Prior to installing any of the Microinverters, verify that the utility voltage at the point of common connection matches the voltage rating on the Microinverter label. APsystems YC500A-MIW Installation/User Manual 8