B 30 Installing the machine on the site 1 - Precautions Whenever handling the machine and the associated pumps, use the equipment provided and observe the instructions in the user's manual. Connections The inlets and outlets for the different energy sources must be connected correctly in order to ensure optimum machine operation during productive use. Commissioning The machine is started up, tested and controlled by the ALCATEL field service engineer. It is then the responsibility of the user to respect the instructions contained in the user's manual relating to the operation and preventive maintenance of machines. Note: commissioning does not cover the connection of the different energy sources (inlets, outlets) to the machine and associated pumps. A simple validation is performed. 2 - Environmental conditions Parameter ams01556 - Edition 03 – September, 06 Ambient temperature Conditions In use : 18 °C < T < 23 °C * During storage : 12 °C < T < 30 °C Relative humidity In use : 20 % < H < 80 % During storage : 20 % < H < 85 % Clean room class In use :10 < p < 1000 During storage : p ≤ 10 000 CE conformity YES * : Respect these conditions imperatively. Alcatel Vacuum Technology France – AMS 200 User’s manual 1/5 B 30 Installing the machine on the site 3 - Height requirements In order to insert the machine lower strip, the minimal height requested between the machine body and the floor is 105 mm. Adjust the four leveling stands under the machine until you obtain this minimal height. Make sure that the machine body is horizontal. Ensure that there is a clearance of 400 mm above the machine. Do not place anything on the machine. The ventilation grills must remain clear. ams01556 - Edition 03 – September, 06 2003 2080 Installation through the wall: 1990 + 2 400 CLEARANCE FOR MAINTENANCE ACCESS TO CHAMBER AMS 200 front view 105 mini Note : all dimensions are in mm. Alcatel Vacuum Technology France – AMS 200 User’s manual 2/5 B 30 Installing the machine on the site 4 - Installation area The operator areas are the clearance required by operators to: - load/unload the wafers - control the machine The technical areas are the clearance required by technicians to: - perform the different connections (electrical, gas, utilities and vacuum) - install the chiller - install the external pumps - install a laminar flow unit above the machine The maintenance areas are the clearance required by technicians to: - open both the hinged lateral panels and doors - access to the programmable PLC and circuit breakers - access to the various utilities - permit the maintenance of the process chamber - access the maintenance keyboard (optional) - perform electrical supervision. ams01556 - Edition 03 – September, 06 The plate holding the robot is placed under the laminar flow of the clean room to avoid any pollution of wafers. The machine can be placed across the wall. The whole machine is then installed in the grey room. Weight of the machine = 1200 kg Alcatel Vacuum Technology France – AMS 200 User’s manual 3/5 B 30 Installing the machine on the site 800 Grey room External pumps installation area 1200 750 725 1265 Chiller installation area Utilities maintenance area 700 160 Access area to electrical and gas connections, PLC and circuit breakers 360 Mains supply Electrical and gas connections 700 Electrical supervision area Utilities and vacuum connections ams01556 - Edition 03 – September, 06 1790 700 700 Process chamber maintenance area Maintenance supervision area Laminar flow area Wall Control area Loading area Operator areas Technical areas Maintenance areas 1300 All dimensions are specified in mm. Alcatel Vacuum Technology France – AMS 200 User’s manual Threaded M8 holes for earthquake attachment 4/5 B 30 Installing the machine on the site 5 – Earthquake attachment ams01556 - Edition 03 – September, 06 Ten M8 holes have been threaded on the machine frame for earthquake attachment (OPTION). Alcatel Vacuum Technology France – AMS 200 User’s manual 5/5