Download FGM160-I Complete User Manual
Transcript
FGM 160 - Installation & Hook-Up Instructions must be used. We will describe two methods, but there are numerous ways this can be done. One proven method is to use a marking band. After the centerlines are marked and their position verified, use the labeling band to mark a line round the pipe, placed at the first spot (spot A), ref. Figure 15. Then, on the other side of the pipe, measure the distance to the second spot (spot B). It is also a good idea to mark another line around the pipe at spot B, as this will help when placing transducer holder B. Spot A Figure 15: Marking a line around the pipe using a marking band A second and just as good a method is to use a paper, the width of the diameter of the pipe and length equal to circumference. Attach the paper to the pipe and verify that the ends meet exactly. Take the paper off the pipe and fold it in two. Mark the fold, and reattach the paper to the pipe. Spot A will then be were the paper ends meet and spot B will be were you marked the fold on the other side of the pipe. See Figure 16 and Figure 17. D Paper D Spot A Figure 16: Attach the paper around the pipe Spot B D Spot A D πD Figure 17: Fold the paper in two. Mark the fold. This will give you spot B. 72.120.605/C Page 57 of 188