Download Problem Management 10pt - IT Infrastructure Library Project
Transcript
Problem Management PrM 1 Introduction to Problem Management You have the same problem occurring time after time with your ICT and it never gets fixed properly? You need the FITS Problem Management process. PrM 1.1 Aim The aim of this section is to introduce the topic of Problem Management and to help you implement the process in your school with a minimum of preparation and training. PrM 1.2 Objectives The objectives of this section are to enable you to: • understand the difference between incidents and problems • understand when a quick fix is not enough to resolve a problem permanently • decide whether you need to implement problem control • understand how to implement the Problem Management process • understand how to achieve workarounds and solutions • decide which Problem Management reports your school requires and how to produce them. PrM 2 Overview PrM 2.1 What is Problem Management? The goal of Problem Management is to minimise both the number and severity of incidents and problems in your school. It should aim to reduce the adverse impact of incidents and problems that are caused by errors in the ICT infrastructure, and to prevent recurrence of incidents related to these errors. • You should address problems in priority order, paying attention to the resolution of problems that can cause serious disruption. • The degree of management and planning required is greater than that needed for incident control, where the objective is restoration of normal service as quickly as possible. • The function of Problem Management is to ensure that incident information is documented in such a way that it is readily available to all technical support staff. Problem Management has reactive and proactive aspects: © Becta 2004 • reactive – problem solving when one or more incidents occur • proactive – identifying and solving problems and known errors before incidents occur in the first place. FITS Problem Management 1