Download 2 - Siemens
Transcript
Index P Performance range, C7, 1-3 Period duration counter, universal inputs, 7-2, 7-3 PG/PC, via spur line to MPI network, 4-5 Pin assignments, 2-10 Plug and socket connectors, view, 2-10 Printer, 1-4 Printer cable, 2-3 Printer connection, 2-10 PROFIBUS address, 3-3 Recommendation, 3-7 PROFIBUS bus cable, 2-15, 3-15 Assembling, 3-19 Characteristics, 3-15 Rules for cable laying, 3-16 To bus connector, 3-22 PROFIBUS bus connector, 3-18 PROFIBUS bus terminal, 2-15 PROFIBUS DP, 3-1, 3-2 Starting up, 3-25 PROFIBUS-DP network Segment, 3-12 Setup example, 3-10, 3-11 Programming device, 1-5 Connection to an MPI network, 4-2, 4-3 In MPI network, 4-4 Programming device cable, 1-4, 2-15 R Ready message, 2-25 Remote segment, 3-12, 3-14 Repeater, 3-3 RS 485 repeater, 1-5, 3-3, 3-15 Terminating resistance, 3-8 Using, 3-7 RUN, 2-28 Run-time meter, 2-23 SF, 2-28 Shield, 2-16 Shielding clips, 2-18 Signal modules, 1-3 SINEC L2-DP, 3-1 Spur lines, 3-5, 3-13 Length, 3-13 Starting up CPU as DP master, 3-25 PROFIBUS DP, 3-25 Startup, 2-25, 3-25 Status bits, 5-7 DI/DO, 5-7 STOP, 2-28 Storage, of back-up batteries, 8-4 Surge impedance. Siehe Abschlußwiderstand T Technical specifications, dimensions, A-2 Terminating resistance, 3-6, 3-7 Example, 3-8 On bus connector, 3-7 On RS 485 repeater, 3-8 Set at the bus connector, 3-24 Transducer Isolated, 6-3 Non-isolated, 6-3 Transmission rate DP, 3-2 MPI, 3-2 U Universal inputs Assigning parameters, 7-3 Pin assignments, 7-3 V S S7-300 (CPU), 1-4 S7-400 (CPU), 1-4 Segment MPI network, 3-12 PROFIBUS-DP network, 3-12 Self-test, 2-25, 3-1 Service programming device, 3-7 Setpoint configuration, 3-25 Setup guidelines, 2-16 C7-626 / C7-626 DP Control Systems C79000-G7076-C626-01 V24, 2-13 Voltage measurement, 6-9 Voltage transducer, 6-2 Connection, 6-5 W Wire break check, analog input module SM 331; AI 8, 6-9 Index-3