Download Neutron Engineering Inc.
Transcript
Neutron Engineering Inc. Table of Contents Page 1 . CERTIFICATION 6 2 . SUMMARY OF TEST RESULTS 7 2.1 TEST FACILITY 9 2.2 MEASUREMENT UNCERTAINTY 9 3 . GENERAL INFORMATION 10 3.1 GENERAL DESCRIPTION OF EUT 10 3.2 DESCRIPTION OF TEST MODES 11 3.3 BLOCK DIAGRAM SHOWING THE CONFIGURATION OF SYSTEM TESTED 12 3.4 DESCRIPTION OF SUPPORT UNITS 4 . EMC EMISSION TEST 13 14 4.1 CONDUCTED EMISSION MEASUREMENT 4.1.1 POWER LINE CONDUCTED EMISSION 4.1.2 MEASUREMENT INSTRUMENTS LIST 4.1.3 TEST PROCEDURE 4.1.4 DEVIATION FROM TEST STANDARD 4.1.5 TEST SETUP 4.1.6 BLOCK DIAGRAM OF TEST SETUP 4.1.7 EUT OPERATING CONDITIONS 4.1.8 TEST RESULTS 14 14 14 15 15 15 16 16 17 4.2 RADIATED EMISSION MEASUREMENT 4.2.1 LIMITS OF RADIATED EMISSION MEASUREMENT 4.2.2 MEASUREMENT INSTRUMENTS LIST 4.2.3 TEST PROCEDURE 4.2.4 DEVIATION FROM TEST STANDARD 4.2.5 TEST SETUP 4.2.6 BLOCK DIAGRAM OF TEST SETUP 4.2.7 EUT OPERATING CONDITIONS 4.2.7 TEST RESULTS 19 19 20 20 20 21 21 21 22 4.3 SIGNAL, CONTROL AND DC POWER PORT EMISSIONS TESTING 4.3.1 TEST SPECIFICATION 4.3.2 MEASUREMENT INSTRUMENTS 4.3.3 TEST PROCEDURE 4.3.4 DEVIATION FROM TEST STANDARD 4.3.5 TEST RESULTS 34 34 34 34 34 35 4.4 SIGNAL, CONTROL AND DC POWER PORT EMISSIONS TESTING 4.4.1 TEST SPECIFICATION 4.4.2 MEASUREMENT INSTRUMENTS 39 39 39 Report No.: NEI-EMC-1-1001C020 Page 3 of 80