Download here - KNE
Transcript
Installation – KM-RF / NRF & KM-W Series Overview: The KM-RF/NRF & KM-W Series are a rapid assembly triangular tilt frame solution which allows for offsite prefabrication and easy transportation. The installation of these series will be conducted with the following steps: 1. Triangular Frame Assembly 2. Ground Fixing 3. Rail Installation 4. Ballast Tray Mounting 5. Splice Connection 6. Panel Mounting 1.1 Installation Step 1 – Triangular Frame Assembly The KM-RF/KM-W and KM-NRF series are designed to be deployed on site in a quick and systematic manner which allows for offsite prefabrication, however it is still required that a plan be established in relation to the position of the triangular frames on site. When bolting onto the ground, a visual inspection of the concrete will need to be made to ensure there isn’t any cracking that may jeopardize long term useability. 1.1.1 [KM-RF / KM-W] – The fixed angle tilt frame (RF-10/20/30) is a three rail design secured together via three bolts as per the below the diagram. [KM-NRF] – The rail-less fixed angle tilt frame (RF-3500) is a two arm design, secured upright via two vertical support braces. Four bolts will need to be fastened here. KM-RF/KM-W KM-NRF 1.1.2 Assemble all the triangular frames as per your design plan. 1.2 Installation Step 2 – Ground Fixing 1.2.1 [KM-RF / KM-NRF] – The KM-RF and KM-NRF are both fastened and secured to the ground with the use of 10 mm anchor bolts. Within the triangular frames of both series, predrilled holes for these bolts can be found. Using a rotary hammer, drill these holes and secure the frames to the ground. KM-RF KM-NRF 20