Download C-Trak® Analyzer

Transcript
Contents
Warranty4
Receiving Condition Examination
4
Return of Goods to Manufacturer
4
1.0 Introduction
5
1.1 C-Trak Analyzer and Probe 5
1.2 Product Manual 5
®
2.0 Getting acquainted with the C-Trak® System
6
2.1 Front Panel
6
2.2 Rear Panel
7
2.3 Side Panel
7
2.4 Accessing the Display Screens
8-10
3.0 Calibration Checking
11
3.1 When To Do Calibration Check
11
3.2 Isotope Source
11
3.3 Performing Calibration Check
11
3.4 Source Holder Use
11
4.0 Performing Calibration
12
4.1 Different Probe or Source
12
4.2 Failed Calibration Check
12
4.3 Calibrating
12
5.0 Pre-Surgery Set Up 13
5.1 Before Power is Turned On
13
5.2 Turning Power On
13
5.3 Battery Check
13
5.4 Isotope Settings
14
5.5 Background Test
14
6.0 Use During Surgery
15
6.1 System Adjustments/Changes During Surgery 15
6.2 Cautions: Use of Sterile Drapes;
Magnetic Drapes; Contaminated Drapes
15
2
www.southernscientific.co.uk
7.0 Sterile Practices, Cleaning,
and Disinfecting
16
8.0 System Decontamination 16
8.1 Decontamination Steps
16
9.0 Safety Considerations 17
9.1 Current Overload
17
9.2 Power Supply Requirements
17
9.3 Accessory Colimator
17
9.4 Radioactive Concerns
17
9.5 Use of Electrosurgical Devices
17
10.0 Use of Optional Accessories
18
10.1 LED Repeater
18
10.2 Lechner Collimator
18
10.3 Blocking Plate
18
10.4 Indium Shield Assembly
18
11.0 Technical Specifications
19
11.1 Power
19
11.2 LCD Display
19
11.3 Ratemeter
19
11.4 Probe Connector
19
11.5 Probe Overload Indicator
19
11.6 Rear Panel Connectors
19
11.7 Size
19
11.8 Weight
19
11.9 Housing
19
11.10 Finish
19
11.11 Environmental
19
11.12 Compliance
20
11.13 Serial Numbers
20
12.0 International Symbols
21